FreeState Kiro Solar I

7300 NW 35th St, Silver Lake, KS 66539

Plant Summary Information

FreeState Kiro Solar I is ranked #9 out of 14 solar farms in Kansas in terms of total annual net electricity generation.

FreeState Kiro Solar I generated 341.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameFreeState Kiro Solar I
Utility NameEvergy Kansas Central, Inc
LocationShawnee County, KS
Initial Operation DateFebruary 2023
Last Update Dec 2023
Annual Generation 2.2 GWh
Annual Consumption 7.5 k MMBtu
Ranked #9,683 out of 11,866 Power Plants Nationwide
Ranked #4,439 out of 5,672 Solar Power Plants Nationwide
Ranked #96 out of 152 Kansas Power Plants
Ranked #9 out of 14 Kansas Solar Power Plants
Fuel Types Solar

Map of FreeState Kiro Solar I

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for FreeState Kiro Solar I.

Create Your Account Today

Monthly Net Generation for FreeState Kiro Solar I

280280210210140140707000Jan '23Jan '23Feb '23Feb '23Mar '23Mar '23Apr '23Apr '23May '23May '23Jun '23Jun '23Jul '23Jul '23Aug '23Aug '23Sep '23Sep '23Oct '23Oct '23Nov '23Nov '23Dec '23Dec '23
Download SVG
Download PNG
Download CSV

FreeState Kiro Solar I Details

Summary Information
Plant NameFreeState Kiro Solar I (66882)
Plant Address7300 NW 35th St, Silver Lake, KS 66539
UtilityEvergy Kansas Central, Inc (22500)
Latitude, Longitude39.10878, -95.7867
Generation Dates on FileJan 2023 to Dec 2023
Initial Operation DateFebruary 2023
Annual Generation 2.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthoritySouthwest Power Pool (SWPP)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerFreeState Electric Coop (10019) KS
Grid Voltage 12.47 kV
Energy StorageNo

Generator FKS1 Details Operating February 2023

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2023
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Other Solar TechnologyYes
Azimuth Angle180
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

FreeState Kiro Solar I Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4429USS Mesa Solar LLCDanube, MN2.2 GWh
#4430SolarClub 15 LLCClear Lake, MN2.2 GWh
#4431Novel David Solar LLC CSGWaseca, MN2.2 GWh
#4432AES Daigle Solar, LLCFort Kent, ME2.2 GWh
#4433Ashley-Chicot SolarHamburg, AR2.2 GWh
#4434USS Bush Solar LLC CSGOwatonna, MN2.2 GWh
#4435Interstate 3 SolarSouth Brunswick, NJ2.2 GWh
#4436Chester Power PartnersNorth Chester, VT2.2 GWh
#4437Volkman Road Solar Array HybridEvansville, IN2.2 GWh
#4438Dodge Renewables 2Hayfield, MN2.2 GWh
#4440USS Hancock Solar LLC CSGCologne, MN2.2 GWh
#4441CREERacine, WI2.2 GWh
#4442Springer Solar 1Springer, NM2.2 GWh
#4443Calabro Airport South Solar ProjectShirley, NY2.2 GWh
#4444SolarClub 23 LLCLa Crescent, MN2.2 GWh
#4445USS Cougar Solar LLC CSGMorgan, MN2.2 GWh
#4446C&LStar City, AR2.2 GWh
#4447USS Eggo Solar CSGCologne, MN2.2 GWh
#4448Shuman SolarStoughton, MA2.2 GWh
#4449USS Water Town Solar LLC CSGWaterville, MN2.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding FreeState Kiro Solar I.

Plant NamePlant LocationAnnual GenerationDistance
AmericusEmporia, KS2.4 GWh43.2 mi
Baldwin City Plant No 1Baldwin City, KS19.0 MWh39.7 mi
Baldwin City Plant No 2Baldwin City, KS145.0 MWh39.8 mi
BurlingameBurlingame, KS46.1 MWh24.6 mi
Emporia Energy CenterEmporia, KS1.5 TWh48.2 mi
FreeState Crooked Post Solar ITopeka, KS3.4 GWh8.1 mi
FreeState Stull Solar ILeCompton, KS215.0 MWh20.9 mi
Gardner Energy CenterGardner, KS40.0 MWh51.8 mi
HoltonCity of Holton, KS1.0 GWh25.4 mi
IatanWeston, MO3.9 TWh49.1 mi
Jeffrey Energy CenterSt. Mary's, KS5.3 TWh21.5 mi
Kansas River ProjectLawrence, KS19.7 GWh31 mi
Lawrence Energy CenterLawrence, KS1.4 TWh28.6 mi
Marshall Wind FarmFrankfort, KS213.7 GWh51.1 mi
OttawaOttawa, KS377.0 MWh43.6 mi
Reading Wind ProjectReading, KS683.2 GWh44.8 mi
Soldier Creek WindCorning, KS1.1 TWh40 mi
Thunderbird Generator (Tbird)Emporia, KS106.0 MWh50.9 mi
Waste Management Rolling Meadows LFGTETopeka, KS45.4 GWh5.4 mi
West GardnerJohnson, KS262.6 GWh48.4 mi