FPL Energy Oliver Wind II LLC
1851 33rd Ave. SW, Center, ND 58530Plant Summary Information
FPL Energy Oliver Wind II LLC is ranked #37 out of 57 power plants in North Dakota in terms of total annual net electricity generation.
FPL Energy Oliver Wind II LLC generated 55.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | FPL Energy Oliver Wind II LLC |
---|---|
Utility Name | FPL Energy Oliver County Wind II LLC |
Location | Oliver County, ND |
Initial Operation Date | December 2007 |
Last Update | Dec 2023 |
Annual Generation | 179.9 GWh |
Annual Consumption | 669.3 k MMBtu |
Ranked #2,489 out of 11,979 Power Plants Nationwide | |
Ranked #753 out of 1,359 Wind Power Plants Nationwide | |
Ranked #37 out of 57 North Dakota Power Plants | |
Ranked #28 out of 40 North Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of FPL Energy Oliver Wind II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for FPL Energy Oliver Wind II LLC.
Monthly Net Generation for FPL Energy Oliver Wind II LLC
FPL Energy Oliver Wind II LLC Details
Summary Information | |
---|---|
Plant Name | FPL Energy Oliver Wind II LLC (56573) |
Plant Address | 1851 33rd Ave. SW, Center, ND 58530 |
Utility | FPL Energy Oliver County Wind II LLC (54799) |
Latitude, Longitude | 47.15285, -101.19772 |
Generation Dates on File | Dec 2007 to Dec 2023 |
Initial Operation Date | December 2007 |
Annual Generation | 179.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ALLETE, Inc. (12647) MN |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 2 Details Operating December 2007
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 48 MW |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 2.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 32 |
Turbine Details | |
Number Of Turbines | 32 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 S |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
FPL Energy Oliver Wind II LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#743 | Allegheny Ridge Wind Farm | Portage, PA | 185.9 GWh |
#744 | Cohocton Wind Project | Cohocton, NY | 185.4 GWh |
#745 | Casa Mesa Wind Energy Center Hybrid | House, NM | 184.4 GWh |
#746 | High Sheldon Wind Farm | Strykersville, NY | 184.0 GWh |
#747 | Peak View Wind Farm | Walsenburg, CO | 183.4 GWh |
#748 | Beebe 1A | Ithaca, MI | 182.9 GWh |
#749 | Bison I Wind Energy Center | New Salem, ND | 181.7 GWh |
#750 | Majestic II Wind | Panhandle, TX | 180.7 GWh |
#751 | Roaring Brook, LLC | Lowville, NY | 180.3 GWh |
#752 | Harvest 2 | Elkton, MI | 180.2 GWh |
#754 | Cerro Gordo Wind Farm | Union, IA | 179.7 GWh |
#755 | Green Pastures Wind II | Seymour, TX | 178.7 GWh |
#756 | Arlington Wind Power Project | Arlington, OR | 177.8 GWh |
#757 | Kingdom Community Wind | Lowell, VT | 176.9 GWh |
#758 | Busch Ranch II Wind Farm | Walsenburg, CO | 176.0 GWh |
#759 | Wethersfield | Gainsville, NY | 176.0 GWh |
#760 | Painted Hills Wind Park | Whitewater, CA | 175.7 GWh |
#761 | Woodward Mountain I | Girvin, TX | 175.7 GWh |
#762 | Flat Ridge Wind Energy LLC | Isabel, KS | 175.5 GWh |
#763 | Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding FPL Energy Oliver Wind II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Valley | Beulah, ND | 5.1 TWh | 33.5 mi |
Baldwin Wind LLC | Wilton, ND | 360.4 GWh | 23.2 mi |
Bison 2 Wind Energy Center | New Salem, ND | 236.8 GWh | 20.6 mi |
Bison 3 Wind Energy Center | New Salem, ND | 242.1 GWh | 20.6 mi |
Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh | 20.6 mi |
Bison I Wind Energy Center | New Salem, ND | 181.7 GWh | 20.6 mi |
Coal Creek | Underwood, ND | 8.3 TWh | 15.7 mi |
Coyote | Beulah, ND | 2.1 TWh | 29.4 mi |
FPL Energy Burleigh County Wind | Wilton, ND | 175.4 GWh | 22 mi |
FPL Energy Oliver Wind I LLC | Center, ND | 171.5 GWh | 0 mi |
Garrison | Riverside, ND | 2.1 TWh | 25.6 mi |
Glen Ullin Energy Center | Glen Ullin, ND | 453.2 GWh | 31.9 mi |
Glen Ullin Station 6 | Glen Ullin, ND | 38.0 GWh | 34.9 mi |
Leland Olds | Stanton, ND | 3.0 TWh | 10.6 mi |
Milton R Young | Center, ND | 4.4 TWh | 6.1 mi |
Oliver Wind III, LLC | Mandan, ND | 435.6 GWh | 13.6 mi |
Oliver Wind IV | Hannover, ND | 132.2 GWh | 19.6 mi |
R M Heskett | Mandan, ND | 26.9 GWh | 24.7 mi |
Tesoro Mandan Cogeneration Plant | Mandan, ND | 44.5 GWh | 25.8 mi |
Wilton Wind II LLC | Wilton, ND | 187.0 GWh | 23.4 mi |