Foundation AB
3601 Busch Drive, Fairfield, CA 94534Plant Summary Information
Foundation AB is ranked #99 out of 108 wind farms in California in terms of total annual net electricity generation.
Foundation AB generated 150.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Foundation AB |
---|---|
Utility Name | Foundation HA Energy Generation, LLC |
Location | Solano County, CA |
Initial Operation Date | November 2011 |
Last Update | Dec 2023 |
Annual Generation | 2.9 GWh |
Annual Consumption | 10.1 k MMBtu |
Ranked #9,120 out of 11,852 Power Plants Nationwide | |
Ranked #1,278 out of 1,345 Wind Power Plants Nationwide | |
Ranked #1,257 out of 1,570 California Power Plants | |
Ranked #99 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Map of Foundation AB
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foundation AB.
Monthly Net Generation for Foundation AB
Foundation AB Details
Summary Information | |
---|---|
Plant Name | Foundation AB (57791) |
Plant Address | 3601 Busch Drive, Fairfield, CA 94534 |
Utility | Foundation HA Energy Generation, LLC (56930) |
Latitude, Longitude | 38.23222, -122.09278 |
Generation Dates on File | Nov 2011 to Dec 2023 |
Initial Operation Date | November 2011 |
Annual Generation | 2.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF12-102 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator WTG1 Details Operating November 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 13.4 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 213 |
Foundation AB Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1268 | Willmar | Willmar, MN | 3.3 GWh |
#1269 | Agassiz Beach LLC | Averill, MN | 3.2 GWh |
#1270 | Big Top LLC | Echo, OR | 3.2 GWh |
#1271 | Green Providence Wind II, LLC | Providence, RI | 3.1 GWh |
#1272 | Ipswich Wind Turbine | Ipswich, MA | 3.1 GWh |
#1273 | Fairhaven Wind | Fairhaven, MA | 3.0 GWh |
#1274 | Seneca Nation Cattaraugus Wind Turbine | Irving, NY | 3.0 GWh |
#1275 | K-Brink Windfarm LLC | Woodstock, MN | 3.0 GWh |
#1276 | Iowa Lakes Community College Wind Farm | Estherville, IA | 2.9 GWh |
#1277 | Osage (IA) | Osage, IA | 3.8 GWh |
#1279 | Town of Otis Wind Energy Project | Otis, MA | 2.8 GWh |
#1280 | Princeton Wind Farm | Princeton, MA | 2.8 GWh |
#1281 | Tooele Army Depot(CSG) | Tooele, UT | 2.8 GWh |
#1282 | Kas Brothers Windfarm | Woodstock, MN | 2.7 GWh |
#1283 | Sunset Breeze LLC | Rushmore, MN | 2.7 GWh |
#1284 | Minnesota Breeze LLC | Rushmore, MN | 2.7 GWh |
#1285 | G Flow Wind LLC | Rushmore, MN | 2.7 GWh |
#1286 | Wolf Wind Enterprises LLC | Rushmore, MN | 2.7 GWh |
#1287 | Green Acres Breeze LLC | Rushmore, MN | 2.7 GWh |
#1288 | Garden 2 Solar Park | Garden Township, MI | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foundation AB.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
American Canyon Solar | American Canyon, CA | 6.6 GWh | 8.2 mi |
Anheuser Busch - Fairfield | Fairfield, CA | 21.6 GWh | 0.2 mi |
Anheuser-Busch #2 | Fairfield, CA | 3.6 GWh | 0.1 mi |
ATT North Watney | Fairfield, CA | 6.6 GWh | 0.9 mi |
CDCR (CA) - Solano State Prison | Vacaville, CA | 2.3 GWh | 9.1 mi |
Creed Energy Center | Suisun, CA | 8.2 GWh | 12.9 mi |
Genentech Vacaville Meter #1 | Vacaville, CA | 12.4 GWh | 13.5 mi |
Goose Haven Energy Center | Suisun, CA | 15.7 GWh | 13.5 mi |
Kaiser Napa Valley Corporate Dr Fuel Cell | Napa, CA | 37.4 GWh | 9.9 mi |
Lake Herman | Benicia, CA | 13.1 GWh | 9.7 mi |
Lambie Energy Center | Suisun, CA | 14.3 GWh | 12.2 mi |
Mariani Packing Vacaville Solar | Vacaville, CA | 891.0 MWh | 13.5 mi |
North Bay Solar 1 | Fairfield, CA | 1.6 GWh | 8.3 mi |
Potrero Hills Energy Producers | Suisun City, CA | 58.7 GWh | 6.2 mi |
SFDK Solar | Vallejo, CA | 10.0 GWh | 10.2 mi |
Solano County Cogen Plant | Fairfield, CA | 7.6 GWh | 3.1 mi |
Soscol Ferry Solar | Napa, CA | 4.3 GWh | 9.9 mi |
SunEdison Anheuser Busch Fairfield | Fairfield, CA | 747.0 MWh | 0 mi |
Valero Refinery Cogeneration Unit 1 | Benicia, CA | 181.8 GWh | 11.3 mi |
Wolfskill Energy Center | Fairfield, CA | 8.0 GWh | 1 mi |