Fort Valley State University Solar
3351 Carver Drive, Fort Valley, GA 31030Plant Summary Information
Fort Valley State University Solar is ranked #57 out of 139 solar farms in Georgia in terms of total annual net electricity generation.
Fort Valley State University Solar generated 4.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Fort Valley State University Solar |
---|---|
Utility Name | Georgia Power Co |
Location | Peach County, GA |
Initial Operation Date | January 2022 |
Last Update | Dec 2023 |
Annual Generation | 20.6 GWh |
Annual Consumption | 74.0 k MMBtu |
Ranked #5,037 out of 11,852 Power Plants Nationwide | |
Ranked #1,178 out of 5,655 Solar Power Plants Nationwide | |
Ranked #131 out of 239 Georgia Power Plants | |
Ranked #57 out of 139 Georgia Solar Power Plants | |
Fuel Types | Solar |
Map of Fort Valley State University Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Valley State University Solar.
Monthly Net Generation for Fort Valley State University Solar
Fort Valley State University Solar Details
Summary Information | |
---|---|
Plant Name | Fort Valley State University Solar (63062) |
Plant Address | 3351 Carver Drive, Fort Valley, GA 31030 |
Utility | Georgia Power Co (7140) |
Latitude, Longitude | 32.50156, -83.88339 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | January 2022 |
Annual Generation | 20.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 10.8 MW |
Summer Capacity | 10.8 MW |
Winter Capacity | 10.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 15.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Fort Valley State University Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1168 | Camp Lejeune Solar and Energy Storage | Camp Lejeune, NC | 21.0 GWh |
#1169 | Waseca Solar | Waseca, MN | 20.9 GWh |
#1170 | KIUC Kapaia PV and BA Storage Project Hybrid | Lihue, HI | 18.9 GWh |
#1171 | Cherry Blossom Solar LLC | Hemingway, SC | 20.9 GWh |
#1172 | Leon Solar | Greenville, TX | 20.8 GWh |
#1173 | Hertford Solar Power, LLC | Ahoskie, NC | 20.7 GWh |
#1174 | TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh |
#1175 | Suntex Solar, LLC | Riley, OR | 20.7 GWh |
#1176 | Pleasant Hill Solar | Suffolk, VA | 20.7 GWh |
#1177 | Vale Air Solar Center, LLC | Vale, OR | 20.7 GWh |
#1179 | Fort Detrick Solar PV | Frederick, MD | 20.6 GWh |
#1180 | Paynesville Solar | Paynesville, MN | 20.5 GWh |
#1181 | AES Maui Kuihelani Solar Hybrid | Waikapu, HI | 20.6 GWh |
#1182 | Black Mountain Solar LLC | Golden Valley, AZ | 20.3 GWh |
#1183 | West Gates Solar Station | Huron, CA | 20.2 GWh |
#1184 | SR Washington I, LLC | Jonesborough, TN | 20.2 GWh |
#1185 | Whitewright Solar | Whitewright, TX | 20.2 GWh |
#1186 | Clear Spring Ranch PV Project | Fountain, CO | 20.2 GWh |
#1187 | Aspiration G | Cantua Creek, CA | 20.1 GWh |
#1188 | Gaston Solar I - SC | Gaston, SC | 20.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Valley State University Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bibb Jones | Macon, GA | 2.0 GWh | 20.5 mi |
Bibb Williams | Macob, GA | 321.0 MWh | 31.3 mi |
Butler Solar Farm 20 | Butler, GA | 39.5 GWh | 25.7 mi |
Butler Solar Project 103 | Butler, GA | 208.4 GWh | 23.2 mi |
CG PS Portfolio 1, LLC | Kathleen, GA | 13.3 GWh | 20 mi |
Coody Cochran | Cochran, GA | 5.7 GWh | 31.1 mi |
CPV Stagecoach Solar | Andersonville, GA | 83.4 GWh | 23.6 mi |
Flint River Operations | Oglethorpe, GA | 448.4 GWh | 20.2 mi |
Freeman Avenue | Andersonville, GA | 2.7 GWh | 26.9 mi |
Mid-Georgia Cogeneration Facility | Kathleen, GA | 121.4 GWh | 16.3 mi |
Pawpaw Solar Plant | Butler, GA | 60.9 GWh | 22.3 mi |
Richland Solar Center | Jeffersonville, GA | 33.6 GWh | 30.9 mi |
Riverwood International Macon Mill | Macon, GA | 359.3 GWh | 23.8 mi |
Robins | Robins AFB, GA | 331.0 MWh | 18.3 mi |
Robins Air Force Base Solar | Macon, GA | 190.7 GWh | 19.9 mi |
SR Perry | Perry, GA | 150.0 GWh | 10.1 mi |
Taylor | Mauk, GA | 31.7 GWh | 29.6 mi |
Taylor County Solar | Butler, GA | 206.7 GWh | 24.8 mi |
Twiggs Solar | Dry Branch, GA | 421.1 GWh | 23.9 mi |
White Pine Solar, LLC | Butler, GA | 188.2 GWh | 21.8 mi |