Fort Huachuca Solar PV Project
Kelsay Ave. Fort Huachuca Army, Sierra Vista, AZ 85613Plant Summary Information
Fort Huachuca Solar PV Project is ranked #39 out of 99 solar farms in Arizona in terms of total annual net electricity generation.
Fort Huachuca Solar PV Project generated 11.1 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Fort Huachuca Solar PV Project |
---|---|
Utility Name | Tucson Electric Power Co |
Location | Cochise County, AZ |
Initial Operation Date | December 2014 |
Last Update | Dec 2022 |
Annual Generation | 41.7 GWh |
Annual Consumption | 152.2 k MMBtu |
Ranked #4,032 out of 11,249 Power Plants Nationwide | |
Ranked #771 out of 5,158 Solar Power Plants Nationwide | |
Ranked #83 out of 150 Arizona Power Plants | |
Ranked #39 out of 99 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Fort Huachuca Solar PV Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Huachuca Solar PV Project.
Monthly Net Generation for Fort Huachuca Solar PV Project
Fort Huachuca Solar PV Project Details
Summary Information | |
---|---|
Plant Name | Fort Huachuca Solar PV Project (58972) |
Plant Address | Kelsay Ave. Fort Huachuca Army Sierra Vista, AZ 85613 |
Utility | Tucson Electric Power Co (24211) |
Latitude, Longitude | 31.55528, -110.35 |
Generation Dates on File | Jan 2015 to Dec 2022 |
Initial Operation Date | December 2014 |
Annual Generation | 41.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Tucson Electric Power Company (TEPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Tucson Electric Power Co (24211) AZ |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator FHUAC Details Operating December 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 13.6 MW |
Summer Capacity | 13.6 MW |
Winter Capacity | 13.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 17.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator FHUA2 Details Operating January 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.1 MW |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Fort Huachuca Solar PV Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#761 | Gloucester Solar | Gloucester, VA | 42.5 GWh |
#762 | Nicolis Solar PV Plant | Delano, CA | 42.4 GWh |
#763 | Montross Solar | Montross, VA | 42.3 GWh |
#764 | Temperance Solar, LLC | Erie, MI | 42.1 GWh |
#765 | Hyder Solar Hybrid | Hyder, AZ | 42.1 GWh |
#766 | Fusion Solar Center LLC | Baltic, CT | 42.0 GWh |
#767 | Red Rock | Red Rock, AZ | 41.9 GWh |
#768 | RE Rosamond Two LLC | Rosamond, CA | 41.8 GWh |
#769 | DG AMP Solar Bowling Green | Bowling Green, OH | 41.8 GWh |
#770 | Westlands Solar PV Farm | Huron, CA | 41.8 GWh |
#772 | Jacumba Solar Farm | Jacumba, CA | 41.7 GWh |
#773 | EDF Ph1 Toms River | Tom's River, NJ | 41.7 GWh |
#774 | Stillwater Facility | Fallon, NV | 146.2 GWh |
#775 | Apple Data Center PV | Maiden, NC | 41.6 GWh |
#776 | Apple Data Center - PV2 | Conover, NC | 41.5 GWh |
#777 | Energix Buckingham, LLC | Cumberland, VA | 41.4 GWh |
#778 | Montgomery Solar LLC | Biscoe, NC | 41.4 GWh |
#779 | CPV Maple Hill Solar | Portage, PA | 41.2 GWh |
#780 | Calipatria Solar Farm | Calipatria, CA | 41.2 GWh |
#781 | Pasquotank | Elizabeth City, NC | 40.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Huachuca Solar PV Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon TUS2 | Tucson, AZ | 3.3 GWh | 49 mi |
Apache Solar 1 | Cochise, AZ | 57.6 GWh | 44.5 mi |
Apache Station | Cochise, AZ | 2.1 TWh | 44 mi |
Avalon Solar | Pima, AZ | 77.5 GWh | 47.3 mi |
Avalon Solar II | Sahuarita, AZ | 45.8 GWh | 47.2 mi |
Cogenra - TEP | Tucson, AZ | 2.2 GWh | 46.5 mi |
Douglas | Douglas, AZ | 53.3 MWh | 48.7 mi |
FRB Solar Farm | Tucson, AZ | 2.7 GWh | 47.3 mi |
Gato Montes Solar, LLC | Tucson, AZ | 8.0 GWh | 46.8 mi |
Iron Horse Battery Storage Hybrid | Tucson, AZ | 1.7 GWh | 46.6 mi |
Pima Community College | Tucson, AZ | 1.6 GWh | 50.3 mi |
Prairie Fire | Tucson, AZ | 8.7 GWh | 47.6 mi |
Red Horse III | Wilcox, AZ | 76.0 GWh | 43.8 mi |
Rio Rico Solar | Rio Rico, AZ | 8.3 GWh | 38.9 mi |
SR McNeal | McNeal, AZ | 11.8 GWh | 38.2 mi |
Sulphur Springs | Cochise, AZ | 55.7 GWh | 43.2 mi |
Tech Park Solar | Tucson, AZ | 14.6 GWh | 46.4 mi |
UASTP I | Tucson, AZ | 390.0 MWh | 46.2 mi |
Valencia | Nogales, AZ | 3.6 GWh | 36.7 mi |
Wilmot Energy Center LLC | Tucson, AZ | 281.1 GWh | 46.4 mi |