Fort Hill 1, 2, 3 & 4
1 Fort Hill Dr, Uncasville, CT 6382Plant Summary Information
Fort Hill 1, 2, 3 & 4 is ranked #14 out of 24 distillate fuel oil power plants in Connecticut in terms of total annual net electricity generation.
Fort Hill 1, 2, 3 & 4 is comprised of 4 generators and generated 82.0 MWh during the 3-month period between October 2024 to January 2025.
Plant Name | Fort Hill 1, 2, 3 & 4 |
---|---|
Utility Name | Connecticut Mun Elec Engy Coop |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | August 2010 |
Last Update | Jan 2025 |
Annual Generation | 532.0 MWh |
Annual Consumption | 6.3 k MMBtu |
Ranked #11,151 out of 11,979 Power Plants Nationwide | |
Ranked #523 out of 1,268 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #143 out of 156 Connecticut Power Plants | |
Ranked #14 out of 24 Connecticut Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Fort Hill 1, 2, 3 & 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Hill 1, 2, 3 & 4.
Monthly Net Generation for Fort Hill 1, 2, 3 & 4
Fort Hill 1, 2, 3 & 4 Details
Summary Information | |
---|---|
Plant Name | Fort Hill 1, 2, 3 & 4 (57599) |
Plant Address | 1 Fort Hill Dr, Uncasville, CT 6382 |
Utility | Connecticut Mun Elec Engy Coop (4180) |
Latitude, Longitude | 41.4711, -72.1022 |
Generation Dates on File | Jan 2011 to Jan 2025 |
Initial Operation Date | August 2010 |
Annual Generation | 532.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Mohegan Tribal Utility Authority (49826) CT |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator FH1 Details Operating August 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator FH2 Details Operating August 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator FH3 Details Operating August 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator FH4 Details Operating August 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Fort Hill 1, 2, 3 & 4 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#513 | Cascade Creek | Rochester, MN | 38.7 GWh |
#514 | Glenwood | Glenwood Landing, NY | 568.0 MWh |
#515 | Edward L. Addison Generating Plant | Thomaston, GA | 200.2 GWh |
#516 | Bridge Street 1 & 2 | Groton, CT | 562.0 MWh |
#517 | Covanta Hempstead | Westbury, NY | 593.1 GWh |
#518 | Industrial Park | Rock Falls, IL | 561.0 MWh |
#519 | Montville Station | Uncasville, CT | 36.2 GWh |
#520 | Castleton Energy Center | Castleton, NY | 89.9 GWh |
#521 | Clyde Peaking Engine | Clyde, OH | 540.0 MWh |
#522 | Cape Gas Turbine | Portland, ME | 532.0 MWh |
#524 | Treasure Coast Energy Center | Ft. Pierce, FL | 1.8 TWh |
#525 | Nottoway Diesel Generating Facility | Courtland, VA | 525.0 MWh |
#526 | WestRock-West Point Mill | West Point, VA | 510.3 GWh |
#527 | False Island | Thorne Bay, AK | 513.0 MWh |
#528 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#529 | Seward (AK) | Seward, AK | 507.0 MWh |
#530 | Penobscot Energy Recovery | Orrington, ME | 31.5 GWh |
#531 | Martin | Indiantown, FL | 7.7 TWh |
#532 | VMEA 1 Credit Gen | Manassas, VA | 499.0 MWh |
#533 | NCSU CCUP Cogeneration Plant | Raleigh, NC | 43.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Hill 1, 2, 3 & 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Backus Microgrid Project | Norwich, CT | 939.0 MWh | 5 mi |
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 7.6 mi |
CMEEC - Bozrah | Bozrah, CT | 3.1 GWh | 7.5 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 5.4 mi |
CMEEC - Norwich Stott St Solar Hybrid | Norwich, CT | 2.4 GWh | 7.3 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 6.3 mi |
CMEEC - Rogers Rd Solar | Norwich, CT | 1.6 GWh | 4.8 mi |
Conn Mun Electric Energy Coop | Norwich, CT | 1.3 GWh | 4.8 mi |
Connecticut College | New London, CT | 8.1 GWh | 6.2 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 113.7 GWh | 1.8 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 7.3 mi |
LNG 1 & 2 | Norwich, CT | 573.0 MWh | 6.8 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 3 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 5 mi |
North Main Street | Norwich, CT | 138.5 MWh | 4.3 mi |
Norwich WWTP | Norwich, CT | 1.0 MWh | 3.9 mi |
Rand Whitney CHP Plant | Montville, CT | 133.3 GWh | 2.2 mi |
Subase Microgrid Project | Groton, CT | 34.2 GWh | 5 mi |
Tenth Street | Norwich, CT | 3.5 GWh | 5.4 mi |
Tunnel | Preston, CT | 11.9 GWh | 6.6 mi |