Fort Drum Energy Center
21505 SR 60, Vero Beach, FL 32966Plant Summary Information
Fort Drum Energy Center is ranked #101 out of 185 solar farms in Florida in terms of total annual net electricity generation.
Fort Drum Energy Center generated 27.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Fort Drum Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Okeechobee County, FL |
Initial Operation Date | June 2021 |
Last Update | Dec 2024 |
Annual Generation | 122.1 GWh |
Annual Consumption | 433.9 k MMBtu |
Ranked #2,975 out of 11,949 Power Plants Nationwide | |
Ranked #550 out of 5,739 Solar Power Plants Nationwide | |
Ranked #173 out of 293 Florida Power Plants | |
Ranked #101 out of 185 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Fort Drum Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Drum Energy Center.
Monthly Net Generation for Fort Drum Energy Center
Fort Drum Energy Center Details
Summary Information | |
---|---|
Plant Name | Fort Drum Energy Center (64300) |
Plant Address | 21505 SR 60, Vero Beach, FL 32966 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.60789, -80.75812 |
Generation Dates on File | Jun 2021 to Dec 2024 |
Initial Operation Date | June 2021 |
Annual Generation | 122.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator FORTD Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.5 MW |
Summer Capacity | 74.5 MW |
Winter Capacity | 74.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 20 |
DC Net Capacity | 96.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Fort Drum Energy Center Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#540 | First City Solar Energy Center | McDavid, FL | 126.5 GWh |
#541 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 126.4 GWh |
#542 | Grasshopper Solar | Chase City, VA | 125.6 GWh |
#543 | Solar Star Oregon II | Prineville, OR | 125.2 GWh |
#544 | Luciana | Richgrove, CA | 125.0 GWh |
#545 | Innovative Solar 42 | Fayetteville, NC | 124.4 GWh |
#546 | Elektron Solar, LLC | Grantsville, UT | 123.7 GWh |
#547 | Twin Lakes | Interlachen, FL | 122.7 GWh |
#548 | Boulder Solar II, LLC | Boulder City, NV | 122.7 GWh |
#549 | Wildflower Solar, LLC (MS) | DeSoto, MS | 122.7 GWh |
#551 | FPL Flowers Creek Solar Energy Center | Altha, FL | 122.1 GWh |
#552 | Lamesa II | Lamesa, TX | 122.0 GWh |
#553 | TWE Bowman Solar Project | Bowman, SC | 121.6 GWh |
#554 | Midway Solar Farm 1 | Calipatria, CA | 121.1 GWh |
#555 | Payne Creek Solar | Bowling Green, FL | 121.1 GWh |
#556 | Wild Quail | Defuniak Springs, FL | 120.7 GWh |
#557 | Laurel Oaks Solar | Plant City, FL | 120.7 GWh |
#558 | Caden Energix Axton LLC | Axton, VA | 120.4 GWh |
#559 | Warsaw Farm | Warsaw, NC | 120.3 GWh |
#560 | Bedford Solar | Chesapeake, VA | 120.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Drum Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Bay Solar Energy Center | Sebastian, FL | 134.3 GWh | 23 mi |
Blue Cypress Solar Energy Center | Vero Beach, FL | 136.0 GWh | 13.5 mi |
Bluefield Preserve Solar | Okeechobee, FL | 149.1 GWh | 25.7 mi |
Buttonwood | Fort Pierce, FL | 20.8 GWh | 7 mi |
FPL Cavendish Solar Energy Center | Okeechobee, FL | 126.4 GWh | 3.1 mi |
Grove | Vero Beach, FL | 145.1 GWh | 6.7 mi |
Honeybell | TBD, FL | 21.2 GWh | 7 mi |
Ibis | Palm Bay, FL | 146.2 GWh | 17 mi |
Indian River Solar Center | Vero Beach, FL | 142.8 GWh | 11.3 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 136.1 GWh | 20.9 mi |
Lakeside Solar Center | Okeechobee, FL | 137.6 GWh | 27.2 mi |
Okeechobee Clean Energy Center | Okeechobee, FL | 11.1 TWh | 2.7 mi |
Okeechobee Solar | Vero Beach, FL | 151.3 GWh | 2.7 mi |
Orange Blossom Solar Center | Vero Beach, FL | 148.8 GWh | 11.5 mi |
Palm Bay Solar | Palm Bay, FL | 142.1 GWh | 17.9 mi |
Pelican Solar Center | Ft. Pierce, FL | 152.0 GWh | 14.2 mi |
Pineapple | Port St Lucie, FL | 155.8 GWh | 26.9 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 150.5 GWh | 25.2 mi |
Sundew | Port St Lucie, FL | 147.7 GWh | 27.1 mi |
Turnpike | Vero Beach, FL | 166.9 GWh | 7.5 mi |