Fort Drum Energy Center
21505 SR 60, Vero Beach, FL 32966Plant Summary Information
Fort Drum Energy Center is ranked #102 out of 199 solar farms in Florida in terms of total annual net electricity generation.
Fort Drum Energy Center generated 24.5 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Fort Drum Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Okeechobee County, FL |
Initial Operation Date | June 2021 |
Last Update | Jan 2025 |
Annual Generation | 125.0 GWh |
Annual Consumption | 447.0 k MMBtu |
Ranked #2,965 out of 11,979 Power Plants Nationwide | |
Ranked #557 out of 5,765 Solar Power Plants Nationwide | |
Ranked #174 out of 307 Florida Power Plants | |
Ranked #102 out of 199 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Fort Drum Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Drum Energy Center.
Monthly Net Generation for Fort Drum Energy Center
Fort Drum Energy Center Details
Summary Information | |
---|---|
Plant Name | Fort Drum Energy Center (64300) |
Plant Address | 21505 SR 60, Vero Beach, FL 32966 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.60789, -80.75812 |
Generation Dates on File | Jun 2021 to Jan 2025 |
Initial Operation Date | June 2021 |
Annual Generation | 125.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator FORTD Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.5 MW |
Summer Capacity | 74.5 MW |
Winter Capacity | 74.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 20 |
DC Net Capacity | 96.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Fort Drum Energy Center Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#547 | Mesquite Solar 5, LLC | Tonopah, AZ | 117.4 GWh |
#548 | Solar Star Oregon II | Prineville, OR | 127.6 GWh |
#549 | Shoe Creek Solar, LLC | Laurinburg, NC | 127.5 GWh |
#550 | Colgreen North Shore Solar Farm | Mecca, CA | 127.3 GWh |
#551 | Little Manatee River Solar | Ruskin, FL | 126.7 GWh |
#552 | First City Solar Energy Center | McDavid, FL | 126.5 GWh |
#553 | Antelope DSR 1 | Lancaster, CA | 126.0 GWh |
#554 | Grasshopper Solar | Chase City, VA | 126.0 GWh |
#555 | Foxhound | Clover, VA | 125.5 GWh |
#556 | Steel Solar LLC | Plymouth, UT | 125.3 GWh |
#558 | FPL Flowers Creek Solar Energy Center | Altha, FL | 125.0 GWh |
#559 | Innovative Solar 42 | Fayetteville, NC | 124.4 GWh |
#560 | Elizabeth Solar Plant | Pitkin, LA | 123.9 GWh |
#561 | Lamesa II | Lamesa, TX | 123.5 GWh |
#562 | Caden Energix Axton LLC | Axton, VA | 123.4 GWh |
#563 | TWE Bowman Solar Project | Bowman, SC | 123.4 GWh |
#564 | Paddock Solar | Beloit, WI | 123.1 GWh |
#565 | Twin Lakes | Interlachen, FL | 122.6 GWh |
#566 | Desper Solar | Louisa, VA | 122.5 GWh |
#567 | Laurel Oaks Solar | Plant City, FL | 121.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Drum Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Bay Solar Energy Center | Sebastian, FL | 135.6 GWh | 23 mi |
Big Water | TBD, FL | 6.2 GWh | 11.8 mi |
Blue Cypress Solar Energy Center | Vero Beach, FL | 136.2 GWh | 13.5 mi |
Bluefield Preserve Solar | Okeechobee, FL | 150.1 GWh | 25.7 mi |
Buttonwood | Fort Pierce, FL | 31.5 GWh | 7 mi |
Fox Trail | Callahan, FL | 5.2 GWh | 17.2 mi |
FPL Cavendish Solar Energy Center | Okeechobee, FL | 127.7 GWh | 3.1 mi |
Grove | Vero Beach, FL | 146.6 GWh | 6.7 mi |
Honeybell | TBD, FL | 31.3 GWh | 7 mi |
Ibis | Palm Bay, FL | 152.9 GWh | 17 mi |
Indian River Solar Center | Vero Beach, FL | 143.0 GWh | 11.3 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 137.3 GWh | 20.9 mi |
Okeechobee Clean Energy Center | Okeechobee, FL | 11.0 TWh | 2.7 mi |
Okeechobee Solar | Vero Beach, FL | 150.8 GWh | 2.7 mi |
Orange Blossom Solar Center | Vero Beach, FL | 149.1 GWh | 11.5 mi |
Palm Bay Solar | Palm Bay, FL | 143.0 GWh | 17.9 mi |
Pelican Solar Center | Ft. Pierce, FL | 153.0 GWh | 14.2 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.6 GWh | 25.2 mi |
Speckled Perch | TBD, FL | 6.7 GWh | 22.9 mi |
Turnpike | Vero Beach, FL | 173.6 GWh | 7.5 mi |