Forrest City- Eldridge Road
1130 Eldridge Road, Forrest City, AR 72335Plant Summary Information
Forrest City- Eldridge Road is ranked #24 out of 30 solar farms in Arkansas in terms of total annual net electricity generation.
Forrest City- Eldridge Road generated 382.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Forrest City- Eldridge Road |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | St. Francis County, AR |
Initial Operation Date | April 2021 |
Last Update | Dec 2023 |
Annual Generation | 2.1 GWh |
Annual Consumption | 7.5 k MMBtu |
Ranked #9,780 out of 11,852 Power Plants Nationwide | |
Ranked #4,521 out of 5,655 Solar Power Plants Nationwide | |
Ranked #68 out of 76 Arkansas Power Plants | |
Ranked #24 out of 30 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Forrest City- Eldridge Road
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Forrest City- Eldridge Road.
Monthly Net Generation for Forrest City- Eldridge Road
Forrest City- Eldridge Road Details
Summary Information | |
---|---|
Plant Name | Forrest City- Eldridge Road (64262) |
Plant Address | 1130 Eldridge Road, Forrest City, AR 72335 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 35.03789, -90.80707 |
Generation Dates on File | Apr 2021 to Dec 2023 |
Initial Operation Date | April 2021 |
Annual Generation | 2.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Woodruff Electric Coop Corp (20963) AR |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 453 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.3 MW |
Virtual Net Metering Agreement | No |
Forrest City- Eldridge Road Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4511 | Solar Star Palo Alto I, LLC | Palo Alto, CA | 2.1 GWh |
#4512 | WHA Southbridge Solar Park CSG | Wilmington, DE | 2.1 GWh |
#4513 | Nunn | Apple Valley, CA | 2.1 GWh |
#4514 | Victor Mesa Linda B2 | Victorville, CA | 2.1 GWh |
#4515 | Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh |
#4516 | ELP - Kipp | Hudson, NY | 2.1 GWh |
#4517 | USS Buckaroo Solar LLC CSG | Glydon, MN | 2.1 GWh |
#4518 | USS Verbena Solar LLC | Stewart, MN | 2.1 GWh |
#4519 | Novel Winegar Partnership Solar CSG | Waseca, MN | 2.1 GWh |
#4520 | Mt. Hope DPC Solar | Mt. Hope, WI | 2.1 GWh |
#4522 | IGS CC, LLC | Washington, DC | 2.1 GWh |
#4523 | Emerald Marshfields, LLC | Marshfield, MA | 2.1 GWh |
#4524 | Salt Point Solar (Hybrid) | Poughkeepsie, NY | 2.1 GWh |
#4525 | 12 Applegate Solar LLC | Robbinsville, NJ | 2.1 GWh |
#4526 | USS Solar Way LLC CSG | Hartland, MN | 2.1 GWh |
#4527 | Iris Solar, LLC (MN) | Nicollet, MN | 2.1 GWh |
#4528 | Hinterland CSG, LLC | Clearlake, MN | 2.1 GWh |
#4529 | IKEA Live Oak Rooftop PV System | Live Oak, TX | 2.1 GWh |
#4530 | 126 Grove Solar LLC | Franklin, MA | 2.1 GWh |
#4531 | USS DVL Solar CSG | Waconia, MN | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Forrest City- Eldridge Road.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allen | Memphis, TN | 6.2 TWh | 37.3 mi |
Big Cypress Solar, LLC | Crawfordsville, AR | 342.9 GWh | 35.3 mi |
Craighead Electric Solar One | Brookland, AR | 2.3 GWh | 62.6 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 60.7 mi |
Delta Wind Farm (MS) | Dundee, MS | 201.2 GWh | 45.8 mi |
Farmers Electric Cooperative | Newport, AR | 2.2 GWh | 47.3 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 4 mi |
Happy Solar 1 | Searcy, AR | 195.7 GWh | 49.1 mi |
IKEA Memphis 508 | Cordova, TN | 856.0 MWh | 57.9 mi |
Independence Steam Electric Station | Newark, AR | 5.6 TWh | 55.8 mi |
Jonesboro City Water & Light Plant | Jonesboro, AR | 84.7 GWh | 56.2 mi |
L L Wilkins | Clarksdale, MS | 90.0 MWh | 60.6 mi |
Millington Solar Farm | Millington, TN | 96.9 GWh | 58 mi |
Newport Solar Project | Newport, AR | 328.2 GWh | 48.6 mi |
Searcy Solar Hybrid | Searcy, AR | 204.2 GWh | 51.7 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.5 GWh | 51 mi |
Stuttgart Solar | Stuttgart, AR | 154.8 GWh | 54.8 mi |
TVA Southaven Combined Cycle | Southaven, MS | 5.0 TWh | 43.6 mi |
Walnut Bend Solar Station PV | Moro, AR | 100.0 MWh | 51.5 mi |
Wildflower Solar, LLC (MS) | DeSoto, MS | 90.5 GWh | 35.7 mi |