Forrest City- Eldridge Road
1130 Eldridge Road, Forrest City, AR 72335Plant Summary Information
Forrest City- Eldridge Road is ranked #19 out of 25 solar farms in Arkansas in terms of total annual net electricity generation.
Forrest City- Eldridge Road generated 609.7 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Forrest City- Eldridge Road |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | St. Francis County, AR |
Initial Operation Date | April 2021 |
Last Update | Dec 2022 |
Annual Generation | 2.2 GWh |
Annual Consumption | 8.0 k MMBtu |
Ranked #9,279 out of 11,249 Power Plants Nationwide | |
Ranked #4,095 out of 5,158 Solar Power Plants Nationwide | |
Ranked #63 out of 71 Arkansas Power Plants | |
Ranked #19 out of 25 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Forrest City- Eldridge Road
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Forrest City- Eldridge Road.
Monthly Net Generation for Forrest City- Eldridge Road
Forrest City- Eldridge Road Details
Summary Information | |
---|---|
Plant Name | Forrest City- Eldridge Road (64262) |
Plant Address | 1130 Eldridge Road Forrest City, AR 72335 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 35.03789, -90.80707 |
Generation Dates on File | Apr 2021 to Dec 2022 |
Initial Operation Date | April 2021 |
Annual Generation | 2.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Woodruff Electric Coop Corp (20963) AR |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 453 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.3 MW |
Virtual Net Metering Agreement | No |
Forrest City- Eldridge Road Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4085 | Philip Morris | Chester, VA | 2.2 GWh |
#4086 | Sacramento (SMUD) | Sacramento, CA | 2.2 GWh |
#4087 | 77 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 2.2 GWh |
#4088 | SunEdison Walmart Apple Valley DC | Apple Valley, CA | 2.2 GWh |
#4089 | Ulster County Solar | Kingston, NY | 2.2 GWh |
#4090 | BWC Harlow Brook | Wareham, MA | 2.2 GWh |
#4091 | Concord Solar Farm | Concord, MA | 2.2 GWh |
#4092 | USS Danube Solar LLC | Danube, MN | 2.2 GWh |
#4093 | Helen CSG 1 LLC | Plato, MN | 2.2 GWh |
#4094 | Chambers 3 - Lewis County | Lowville, NY | 2.2 GWh |
#4096 | Solar Star Palo Alto I, LLC | Palo Alto, CA | 2.2 GWh |
#4097 | Mason Solar One LLC | Elkton, MD | 2.2 GWh |
#4098 | Clay County Electrical Cooperative | Corning, AR | 2.2 GWh |
#4099 | Salt Palace Solar Gen Plant | Salt Lake City, UT | 2.2 GWh |
#4100 | New Munich Solar | Melrose, MN | 2.2 GWh |
#4101 | USS Viceroy Solar LLC CSG | Brooten, MN | 2.2 GWh |
#4102 | Robert O Schulz Solar Farm | Oakdale, CA | 2.2 GWh |
#4103 | USS Dubhe Solar CSG | North Branch, MN | 2.2 GWh |
#4104 | Agawam Solar | Agawam, MA | 2.2 GWh |
#4105 | Brockelman Road Solar 2 | Lancaster, MA | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Forrest City- Eldridge Road.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allen | Memphis, TN | 6.3 TWh | 37.3 mi |
Batesville Generation Facility | Batesville, MS | 5.4 TWh | 69.7 mi |
Big Cypress Solar, LLC | Crawfordsville, AR | 89.2 GWh | 35.3 mi |
Craighead Electric Solar One | Brookland, AR | 2.3 GWh | 62.6 mi |
Crossroads Energy Center | Clarksdale, MS | 196.0 GWh | 60.7 mi |
Farmers Electric Cooperative | Newport, AR | 2.3 GWh | 47.3 mi |
Forrest City- Prison Site | Forrest City, AR | 2.2 GWh | 4 mi |
Happy Solar 1 | Searcy, AR | 71.6 GWh | 49.1 mi |
IKEA Memphis 508 | Cordova, TN | 1.5 GWh | 57.9 mi |
Independence Steam Electric Station | Newark, AR | 5.7 TWh | 55.8 mi |
Jonesboro City Water & Light Plant | Jonesboro, AR | 100.9 GWh | 56.2 mi |
Millington Solar Farm | Millington, TN | 112.5 GWh | 58 mi |
Newport Solar Project | Newport, AR | 139.7 GWh | 48.6 mi |
Paragould Reciprocating | Paragould, AR | 551.6 MWh | 70.2 mi |
Plum Point Energy Station | Osceola, AR | 3.5 TWh | 64.9 mi |
Searcy Solar Hybrid | Searcy, AR | 227.0 GWh | 51.7 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.8 GWh | 51 mi |
Stuttgart Solar | Stuttgart, AR | 175.5 GWh | 54.8 mi |
TVA Southaven Combined Cycle | Southaven, MS | 5.0 TWh | 43.6 mi |
White River Lock and Dam 1 | Batesville, AR | 15.8 GWh | 68.2 mi |