Forney Energy Center
13770 W US Hwy 80, Forney, TX 75126Plant Summary Information
Forney Energy Center is ranked #13 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Forney Energy Center is comprised of 8 generators and generated 3.2 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Forney Energy Center |
---|---|
Utility Name | LaFrontera Holdings LLC |
Location | Kaufman County, TX |
Initial Operation Date | February 2003 |
Last Update | Aug 2024 |
Annual Generation | 9.9 TWh |
Annual Consumption | 81.5 M MMBtu |
Ranked #65 out of 11,835 Power Plants Nationwide | |
Ranked #13 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 749 Texas Power Plants | |
Ranked #1 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
FPLE Forney LP (2013 to 2015) LaFrontera Holdings LLC (2016 to 2023) |
Map of Forney Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Forney Energy Center.
Monthly Net Generation for Forney Energy Center
Forney Energy Center Details
Summary Information | |
---|---|
Plant Name | Forney Energy Center (55480) |
Plant Address | 13770 W US Hwy 80, Forney, TX 75126 |
Utility | LaFrontera Holdings LLC (60477) |
Latitude, Longitude | 32.7563, -96.4916 |
Generation Dates on File | Aug 2003 to Aug 2024 |
Initial Operation Date | February 2003 |
Annual Generation | 9.9 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-124-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Duck Creek Water Treatment |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN NORTH TEXAS PL |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator U1 Details Operating February 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | FRNYPP_1_CCU |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 195 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator U2 Details Operating February 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | FRNYPP_1_CCU |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 157 MW |
Winter Capacity | 185 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator U3 Details Operating February 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | FRNYPP_1_CCU |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 157 MW |
Winter Capacity | 185 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating April 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | FRNYPP_1_CCU |
Nameplate Capacity | 382.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 406 MW |
Winter Capacity | 418 MW |
Minimum Load | 88 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator U4 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | FRNYPP_2_CCU |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 195 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator U5 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | FRNYPP_2_CCU |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 157 MW |
Winter Capacity | 185 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator U6 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | FRNYPP_2_CCU |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 157 MW |
Winter Capacity | 185 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator ST2 Details Operating July 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | FRNYPP_2_CCU |
Nameplate Capacity | 382.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 406 MW |
Winter Capacity | 418 MW |
Minimum Load | 88 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Forney Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3 | Crystal River | Crystal River, FL | 16.5 TWh |
#4 | H Allen Franklin Combined Cycle | Smiths, AL | 12.3 TWh |
#5 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#6 | Barry | Bucks, AL | 12.4 TWh |
#7 | Union Power Station | El Dorado, AR | 11.6 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.5 TWh |
#9 | Hines Energy Complex | Bartow, FL | 11.3 TWh |
#10 | Okeechobee Clean Energy Center | Okeechobee, FL | 11.1 TWh |
#11 | Midland Cogeneration Venture | Midland, MI | 10.8 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
#22 | Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh |
#23 | Sanford | DeBary, FL | 8.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Forney Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Dallas LLC | Dallas, TX | 27.8 GWh | 11.6 mi |
Ennis Power Company LLC | Ennis, TX | 1.4 TWh | 32 mi |
HEB00794 | McKinney, TX | 33.0 MWh | 32.1 mi |
Lake Hubbard | Sunnyvale, TX | 899.7 GWh | 6.3 mi |
Leon Solar | Greenville, TX | 20.8 GWh | 31.6 mi |
Lily Solar Hybrid | Scurry, TX | 315.7 GWh | 15.8 mi |
Mountain Creek | Dallas, TX | 654.1 GWh | 25.9 mi |
OTHERBenEKDallas | Dallas, TX | 107.0 MWh | 21.4 mi |
Ray Olinger | Navada, TX | 117.4 GWh | 21.7 mi |
State Farm Insur Support Center Central | Irving, TX | 7.0 MWh | 31 mi |
Toyota HQ Plan | Plano, TX | 8.5 GWh | 30.4 mi |
Verizon Hidden Ridge Solar Project | Irving, TX | 3.0 MWh | 28.1 mi |
WAL202 | Frisco, TX | 76.0 MWh | 29.8 mi |
WAL2667 | Dallas, TX | 62.0 MWh | 11.8 mi |
WAL2883 | Plano, TX | 179.0 MWh | 29.5 mi |
WAL3224 | Garland, TX | 268.0 MWh | 8.6 mi |
WAL3285 | Cedar Hill, TX | 371.0 MWh | 28.7 mi |
WAL3406 | Dallas, TX | 291.0 MWh | 23.5 mi |
WAL3432 | Desoto, TX | 218.0 MWh | 25.2 mi |
WAL5211 | McKinney, TX | 7.0 MWh | 29.8 mi |