Foothills Solar Plant Hybrid
Ave 12E and 13th Street, Yuma, AZ 85367Plant Summary Information
Foothills Solar Plant Hybrid is ranked #28 out of 106 solar farms in Arizona in terms of total annual net electricity generation.
Foothills Solar Plant Hybrid generated 20.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Foothills Solar Plant Hybrid |
---|---|
Utility Name | Arizona Public Service Co |
Location | Yuma County, AZ |
Initial Operation Date | March 2013 |
Last Update | Dec 2023 |
Annual Generation | 101.5 GWh |
Annual Consumption | 361.9 k MMBtu |
Ranked #3,222 out of 11,979 Power Plants Nationwide | |
Ranked #647 out of 5,765 Solar Power Plants Nationwide | |
Ranked #66 out of 159 Arizona Power Plants | |
Ranked #28 out of 106 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Foothills Solar Plant Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foothills Solar Plant Hybrid.
Monthly Net Generation for Foothills Solar Plant Hybrid
Foothills Solar Plant Hybrid Details
Summary Information | |
---|---|
Plant Name | Foothills Solar Plant Hybrid (57997) |
Plant Address | Ave 12E and 13th Street, Yuma, AZ 85367 |
Utility | Arizona Public Service Co (803) |
Latitude, Longitude | 32.64856, -114.42874 |
Generation Dates on File | Mar 2013 to Dec 2023 |
Initial Operation Date | March 2013 |
Annual Generation | 101.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
Grid Voltage | 69.00 kV |
Energy Storage | Yes |
Generator PV2 Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 27 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV1 Details Operating March 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 17 MW |
Summer Capacity | 17 MW |
Winter Capacity | 17 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 25 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator FH38M Details Operating April 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 38 MW |
Summer Capacity | 35 MW |
Winter Capacity | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 105 |
---|---|
Maximum Charge Rate | 35 MW |
Maximum Discharge Rate | 35 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 11.5 |
Storage Enclosure Type | CS |
Load Following | Yes |
System Peak Shaving | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 57997 / 57991 |
Direct Support Gen Id | PV1 / PV2 |
Support T D Asset | No |
Foothills Solar Plant Hybrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#637 | Airport Solar | Lakeview, OR | 104.2 GWh |
#638 | Assembly Solar Project | Venice Township, MI | 104.2 GWh |
#639 | Brittlebush Solar | Coolidge, AZ | 103.4 GWh |
#640 | Stampede Solar Hybrid | Saltillo, TX | 101.3 GWh |
#641 | Highest Power Solar, LLC | Louisburg, NC | 102.9 GWh |
#642 | Pavant Solar II LLC | Fillmore, UT | 102.4 GWh |
#643 | Bullock Solar, LLC | Manson, NC | 102.2 GWh |
#644 | Great Cove Solar II | Saint Thomas, PA | 102.2 GWh |
#645 | Five Points Solar Park | Five Points, CA | 102.0 GWh |
#646 | Pearl Solar | Fort Stockton, TX | 101.8 GWh |
#648 | Brantley Solar | Spring Hope, NC | 101.1 GWh |
#649 | Falmouth Renewable Energy Center | Live Oak, FL | 101.0 GWh |
#650 | Elevation Solar C | Lancaster, CA | 101.0 GWh |
#651 | Luning Energy | Luning, NV | 100.7 GWh |
#652 | Mammoth North Solar | Knox, IN | 100.3 GWh |
#653 | Stanly Solar, LLC | Albemarle, NC | 100.2 GWh |
#654 | Crawfish River | Jefferson, WI | 100.1 GWh |
#655 | Willowbrook Solar I, LLC | Morystown, OH | 99.9 GWh |
#656 | Innovative Solar 54 | Kinston, NC | 99.4 GWh |
#657 | ENGIE Solidago Solar Project - Hybrid | Townsend, DE | 99.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foothills Solar Plant Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agua Caliente Solar Project | Dateland, AZ | 655.8 GWh | 58.8 mi |
Arizona Western College PV | Yuma, AZ | 5.6 GWh | 4.8 mi |
Drop 1 | Holtville, CA | 5.4 GWh | 30.2 mi |
Drop 2 (CA) | Holtville, CA | 34.8 GWh | 35.2 mi |
Drop 3 (CA) | Holtville, CA | 27.6 GWh | 40.7 mi |
Drop 4 | Holtville, CA | 79.8 GWh | 46.1 mi |
Drop 5 | Calexico, CA | 9.2 GWh | 56.1 mi |
East Highline | Holtville, CA | 3.0 GWh | 49.8 mi |
Heber Geothermal | Heber, CA | 250.1 GWh | 63.5 mi |
McFarland A Solar and Storage | Dateland, AZ | 472.7 GWh | 58.4 mi |
McFarland B Solar and Storage | Dateland, AZ | 27.5 GWh | 59.3 mi |
Ormesa I | Holtville, CA | 101.7 GWh | 49.5 mi |
Ormesa II | Holtville, CA | 95.0 GWh | 48.6 mi |
Ormesa III | Holtville, CA | 68.5 GWh | 49.3 mi |
Pilot Knob | Winterhaven, CA | 14.2 GWh | 17.7 mi |
Siphon Drop Power Plant | Winterhaven, CA | 12.8 GWh | 15 mi |
Vikings Energy Farm | Holtville, CA | 67.8 GWh | 50.2 mi |
White Wing Solar | Yuma, AZ | 117.9 GWh | 58.5 mi |
Yucca | Yuma, AZ | 308.0 GWh | 17.1 mi |
Yuma Cogeneration Associates | Yuma, AZ | 36.3 GWh | 14.2 mi |