Fleish is ranked #2 out of 6 hydroelectric power plants in Nevada in terms of total annual net electricity generation.
Fleish is comprised of 1 generator and generated 5.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Fleish |
---|---|
Utility Name | Truckee Meadows Water Authority |
Location | Washoe County, NV |
Initial Operation Date | January 1914 |
Last Update | Sep 2024 |
Annual Generation | 21.4 GWh |
Annual Consumption | 76.6 k MMBtu |
Ranked #4,992 out of 11,852 Power Plants Nationwide | |
Ranked #739 out of 1,371 Water Power Plants Nationwide | |
Ranked #92 out of 109 Nevada Power Plants | |
Ranked #2 out of 6 Nevada Water Power Plants | |
Fuel Types | Water |
Map of Fleish
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fleish.
Monthly Net Generation for Fleish
Fleish Details
Summary Information | |
---|---|
Plant Name | Fleish (6513) |
Plant Address | Hwy 80, Fleish, NV 89439 |
Utility | Truckee Meadows Water Authority (56369) |
Latitude, Longitude | 39.2851, -119.5933 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | January 1914 |
Annual Generation | 21.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Truckee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1914 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | Yes |
Other Modifications | December 2026 |
Multiple Fuels | No |
Fleish Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#729 | Stuyvesant Falls | Stuyvesant, NY | 22.1 GWh |
#730 | Wainiha Hydro | Hanalei, HI | 22.1 GWh |
#731 | Haypress | Sierra City, CA | 22.1 GWh |
#732 | J S Eastwood | Shaver Lake, CA | 22.1 GWh |
#733 | Heart Mountain | Cody, WY | 21.8 GWh |
#734 | South Edwards | Fine, NY | 21.6 GWh |
#735 | Searsburg | Searsburg, VT | 21.6 GWh |
#736 | Flat Rock | Fine, NY | 21.5 GWh |
#737 | Moline | Moline, IL | 21.5 GWh |
#738 | Spearfish Hydro | Spearfish, SD | 21.4 GWh |
#740 | Neversink | Grahmsville, NY | 21.3 GWh |
#741 | Boatlock | Holyoke, MA | 21.3 GWh |
#742 | Blue Ridge | Blue Ridge, GA | 21.2 GWh |
#743 | Hatchet Creek Project | Montgomery Creek, CA | 21.2 GWh |
#744 | Portal | Lakeshore, CA | 21.2 GWh |
#745 | Whiting | Whiting, WI | 21.2 GWh |
#746 | Guernsey | Guernsey, WY | 21.1 GWh |
#747 | Chatuge | Hayesville, NC | 21.0 GWh |
#748 | Allison Creek Hydro | Valdez, AK | 21.0 GWh |
#749 | James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fleish.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Fort Churchill | Yerington, NV | 512.9 GWh | 27 mi |
Ft. Churchill PV | Yerington, NV | 23.7 GWh | 26.6 mi |
Galena 2 Geothermal Power Plant | Reno, NV | 38.1 GWh | 11 mi |
Galena 3 Geothermal Power Plant | Reno, NV | 92.1 GWh | 11 mi |
Lahontan | Fallon, NV | 8.4 GWh | 30.7 mi |
New Lahontan | Fallon, NV | 17.2 GWh | 30.8 mi |
Richard Burdette Geothermal | Reno, NV | 110.1 GWh | 11.3 mi |
Stampede | Truckee, CA | 6.5 GWh | 30.2 mi |
Steamboat Hills LP | Reno, NV | 235.6 GWh | 11 mi |
Steamboat II | Reno, NV | 42.1 GWh | 11.2 mi |
Steamboat III | Reno, NV | 45.6 GWh | 11.2 mi |
Tesla Reno GigaFactory | Sparks, NV | 11.1 GWh | 19.4 mi |
Tracy | Sparks, NV | 4.0 TWh | 19.5 mi |
Turquoise Liberty Solar | Sparks, NV | 14.8 GWh | 21.4 mi |
Turquoise Nevada, LLC | Sparks, NV | 106.4 GWh | 20.3 mi |
Verdi | Verdi, NV | 19.1 GWh | 1.9 mi |
Washoe | Verdi, NV | 11.1 GWh | 2.1 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 23.7 GWh | 14.5 mi |
Western 102 Power Plant | McCarran, NV | 482.7 GWh | 19.5 mi |
Whitegrass No. 1 | Yerington, NV | 17.7 GWh | 23.6 mi |