Fishing Creek
Hwy 21, 552 Catawba River Rd, Great Falls, SC 29055Plant Summary Information
Fishing Creek is ranked #36 out of 189 power plants in South Carolina in terms of total annual net electricity generation.
Fishing Creek is comprised of 5 generators and generated 40.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Fishing Creek |
---|---|
Utility Name | Duke Energy Carolinas, LLC |
Location | Chester County, SC |
Initial Operation Date | November 1916 |
Last Update | Dec 2022 |
Annual Generation | 150.1 GWh |
Annual Consumption | 563.8 k MMBtu |
Ranked #2,680 out of 11,249 Power Plants Nationwide | |
Ranked #266 out of 1,354 Water Power Plants Nationwide | |
Ranked #36 out of 189 South Carolina Power Plants | |
Ranked #6 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Map of Fishing Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fishing Creek.
Monthly Net Generation for Fishing Creek
Fishing Creek Details
Summary Information | |
---|---|
Plant Name | Fishing Creek (3257) |
Plant Address | Hwy 21, 552 Catawba River Rd Great Falls, SC 29055 |
Utility | Duke Energy Carolinas, LLC (5416) |
Latitude, Longitude | 34.6, -80.8928 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | November 1916 |
Annual Generation | 150.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Catawba River |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 100.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Minimum Load | 9.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1916 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating November 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 8.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 8.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1916 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating November 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 8.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 8.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1916 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating November 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Minimum Load | 9.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1916 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating November 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 9 MW |
Winter Capacity | 9 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1916 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Fishing Creek Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#256 | Smith Mountain | Penhook, VA | 158.5 GWh |
#257 | Yates Dam | Tallassee, AL | 157.7 GWh |
#258 | Dale Hollow | Celina, TN | 157.3 GWh |
#259 | Wilder | Hartford, VT | 157.2 GWh |
#260 | Trenton Falls | Barneveld, NY | 155.5 GWh |
#261 | Cowans Ford | Stanley, NC | 155.5 GWh |
#262 | Vernon Dam | Vernon, VT | 155.2 GWh |
#263 | South Holston | Bristol, TN | 152.7 GWh |
#264 | Colton | Pierrepont, NY | 152.4 GWh |
#265 | Webbers Falls | Webbers Falls, OK | 150.7 GWh |
#267 | Prairie Du Sac | Prairie du Sac, WI | 149.6 GWh |
#268 | Berlin Gorham | Berlin, NH | 148.8 GWh |
#269 | Terror Lake Microgrid | Kodiak, AK | 148.6 GWh |
#270 | Melton Hill | Lenoir City, TN | 146.3 GWh |
#271 | Charles E Monty | Lewiston, ME | 144.6 GWh |
#272 | Snoqualmie 2 | Snoqualmie, WA | 144.2 GWh |
#273 | Glen Park Hydroelectric Project | Watertown, NY | 142.8 GWh |
#274 | Cedar Creek | Great Falls, SC | 141.6 GWh |
#275 | Jim Falls | Jim Falls, WI | 137.0 GWh |
#276 | Gulf Island | Lewiston, ME | 136.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fishing Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Catawba | York, SC | 20.5 TWh | 32.8 mi |
Cedar Creek | Great Falls, SC | 141.6 GWh | 4.2 mi |
Crown | Lancaster, SC | 7.0 GWh | 10.4 mi |
Dearborn | Great Falls, SC | 116.0 GWh | 2.9 mi |
Fairfield Pumped Storage | Jenkinsville, SC | 344.3 GWh | 32.2 mi |
Midway Green Solar | Union, SC | 22.8 GWh | 31 mi |
Monroe Middle School | Monroe, NC | 21.2 MWh | 32.6 mi |
Monroe Moore Farm | Monroe, NC | 9.8 GWh | 30.5 mi |
Monroe Solar Facility | Monroe, NC | 110.6 GWh | 27.4 mi |
Neal Shoals | Union, SC | 12.6 GWh | 31.9 mi |
Ogburn Solar, LLC | Jefferson, SC | 71.0 MWh | 28.9 mi |
Old Pageland Monroe Road Solar Farm | Monroe, NC | 9.7 GWh | 33.7 mi |
Parr GT | Jenkinsville, SC | 4.0 GWh | 34.1 mi |
Parr Hydro | Jenkinsville, SC | 46.4 GWh | 34.2 mi |
Sediver | York, SC | 56.0 MWh | 30.3 mi |
Thermal Kem | Rock Hill, SC | 66.8 MWh | 22.4 mi |
V C Summer | Jenkinsville, SC | 8.3 TWh | 31.8 mi |
Wateree Hydro | Ridgeway, SC | 202.6 GWh | 21.3 mi |
Webb Forging | Carlisle, SC | 39.3 MWh | 34.2 mi |
Wylie | Fort Mill, SC | 130.6 GWh | 29.9 mi |