Firestone Walker Brewery - Phase 1
1400 Ramada Drive, Paso Robles, CA 93446Plant Summary Information
Firestone Walker Brewery - Phase 1 is ranked #452 out of 799 solar farms in California in terms of total annual net electricity generation.
Firestone Walker Brewery - Phase 1 generated 761.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Firestone Walker Brewery - Phase 1 |
---|---|
Utility Name | SkyHigh 2 Solar |
Location | San Luis Obispo County, CA |
Initial Operation Date | November 2020 |
Last Update | Dec 2023 |
Annual Generation | 3.9 GWh |
Annual Consumption | 13.8 k MMBtu |
Ranked #8,236 out of 11,852 Power Plants Nationwide | |
Ranked #3,209 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,150 out of 1,570 California Power Plants | |
Ranked #452 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Firestone Walker Brewery - Phase 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Firestone Walker Brewery - Phase 1.
Monthly Net Generation for Firestone Walker Brewery - Phase 1
Firestone Walker Brewery - Phase 1 Details
Summary Information | |
---|---|
Plant Name | Firestone Walker Brewery - Phase 1 (64391) |
Plant Address | 1400 Ramada Drive, Paso Robles, CA 93446 |
Utility | SkyHigh 2 Solar (63432) |
Latitude, Longitude | 35.59588, -120.69431 |
Generation Dates on File | Nov 2020 to Dec 2023 |
Initial Operation Date | November 2020 |
Annual Generation | 3.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-1249-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Beverage and Tobacco Product Manufacturing (312) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator FWBP1 Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.4 MW |
Virtual Net Metering Agreement | No |
Firestone Walker Brewery - Phase 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3199 | Goldenrod Solar | Pamplico, SC | 3.9 GWh |
#3200 | Laurinburg Solar, LLC (Heelstone) | Maxton, NC | 3.9 GWh |
#3201 | SV Gardner 1 (Lutz) CSG | Gardner, IL | 3.9 GWh |
#3202 | Gunnison Solar | Gunnison, UT | 3.9 GWh |
#3203 | Kinston | Kinston, NC | 3.9 GWh |
#3204 | Sangerfield Solar CSG | Waterville, NY | 3.9 GWh |
#3205 | ZPD-PT Solar Project 2017-023 LLC Hybrid CSG | Southbridge, MA | 3.8 GWh |
#3206 | Frenchtown II Solar | Frenchtown, NJ | 3.9 GWh |
#3207 | Montana Solar Facility | El Paso, TX | 3.9 GWh |
#3208 | New Lisbon Solar | New Lisbon, WI | 3.9 GWh |
#3210 | Wabasha Solar | Wabasha, MN | 3.9 GWh |
#3211 | Duke Building 98 | Indianapolis, IN | 3.9 GWh |
#3212 | Blacktip Solar | Scranton, SC | 3.9 GWh |
#3213 | Atood II | Cowpens, SC | 3.9 GWh |
#3214 | Underhill | Poughkeepsie, NY | 3.9 GWh |
#3215 | SR Skylark B | Severance, CO | 3.9 GWh |
#3216 | O'Neill Creek Solar | Gaston, OR | 3.9 GWh |
#3217 | Oak Leaf Solar XXXIII LLC (Lantz) | Salida, CO | 3.9 GWh |
#3218 | Van der Kooi Dairy Solar Array | Riverdale, CA | 3.9 GWh |
#3219 | Briarwood | Greenwood, SC | 3.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Firestone Walker Brewery - Phase 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 23.6 GWh | 26.4 mi |
Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 9.8 mi |
Avenal Park | Avenal, CA | 10.6 GWh | 42.6 mi |
Blackjack Solar | King City, CA | 6.9 GWh | 44.5 mi |
CA Flats Solar 130, LLC | Shandon, CA | 228.5 GWh | 16.3 mi |
CA Flats Solar 150, LLC | Shandon, CA | 327.6 GWh | 16.3 mi |
CA-DGS-California Men's Colony | San Luis Obispo, CA | 3.7 GWh | 18.7 mi |
CED Avenal | Avenal, CA | 8.6 GWh | 41.1 mi |
Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh | 42.1 mi |
Coalinga Cogeneration Facility | Coalinga, CA | 44.4 GWh | 43.8 mi |
Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh | 28.8 mi |
Diablo Canyon | Avila Beach, CA | 16.7 TWh | 28.1 mi |
Meridian Vineyards | Paso Robles, CA | 1.4 GWh | 8.8 mi |
Nacimiento Hydro Project | Bradley, CA | 18.6 GWh | 17.6 mi |
Salinas River Cogeneration | San Ardo, CA | 229.2 GWh | 26.4 mi |
Sand Drag LLC | Avenal, CA | 33.4 GWh | 42.3 mi |
Stenner Creek Solar | San Luis Obispo, CA | 700.0 MWh | 19.1 mi |
Sun City Project LLC | Avenal, CA | 34.3 GWh | 42.3 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh | 37.6 mi |
Vintner Solar | Templeton, CA | 3.9 GWh | 2.7 mi |