Firestone Walker Brewery - Phase 1
1400 Ramada Drive, Paso Robles, CA 93446Plant Summary Information
Firestone Walker Brewery - Phase 1 is ranked #461 out of 747 solar farms in California in terms of total annual net electricity generation.
Firestone Walker Brewery - Phase 1 generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Firestone Walker Brewery - Phase 1 |
---|---|
Utility Name | SkyHigh 2 Solar |
Location | San Luis Obispo County, CA |
Initial Operation Date | November 2020 |
Last Update | Dec 2022 |
Annual Generation | 3.8 GWh |
Annual Consumption | 13.7 k MMBtu |
Ranked #8,109 out of 11,249 Power Plants Nationwide | |
Ranked #3,121 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,131 out of 1,501 California Power Plants | |
Ranked #461 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Firestone Walker Brewery - Phase 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Firestone Walker Brewery - Phase 1.
Monthly Net Generation for Firestone Walker Brewery - Phase 1
Firestone Walker Brewery - Phase 1 Details
Summary Information | |
---|---|
Plant Name | Firestone Walker Brewery - Phase 1 (64391) |
Plant Address | 1400 Ramada Drive Paso Robles, CA 93446 |
Utility | SkyHigh 2 Solar (63432) |
Latitude, Longitude | 35.59588, -120.69431 |
Generation Dates on File | Nov 2020 to Dec 2022 |
Initial Operation Date | November 2020 |
Annual Generation | 3.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-1249-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Beverage and Tobacco Product Manufacturing (312) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator FWBP1 Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.4 MW |
Virtual Net Metering Agreement | No |
Firestone Walker Brewery - Phase 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3111 | Three Bridge | Pembroke, NC | 3.9 GWh |
#3112 | Xcel Adams 2 Community Solar Array | Watkins, CO | 3.9 GWh |
#3113 | Thomas Creek Solar | Molalla, OR | 3.9 GWh |
#3114 | Town of Needham VNEM CSG | Needham, MA | 3.9 GWh |
#3115 | Princeton Solar Project | Princeton, NJ | 3.9 GWh |
#3116 | Solar Photovoltaic Project #17 | Fontana, CA | 3.9 GWh |
#3117 | Limelight Solar I, LLC | Spartanburg, SC | 3.9 GWh |
#3118 | CMR Solar LLC | Pine Bush, NY | 3.9 GWh |
#3119 | River Bend Solar, LLC | Reed Point, MT | 3.9 GWh |
#3120 | Woodsdale Farm, LLC | Roxboro, NC | 3.8 GWh |
#3122 | Westmont 400A | Los Angeles, CA | 3.8 GWh |
#3123 | Westmont 400B | Los Angeles, CA | 3.8 GWh |
#3124 | Long Plain Solar | Whatley, MA | 3.8 GWh |
#3125 | Shelby Solar Array | Shelby, OH | 3.8 GWh |
#3126 | Kenansville Solar 2, LLC | Kenansville, NC | 3.8 GWh |
#3127 | Matrix Stults Road Solar Facility | South Brunswick, NJ | 3.8 GWh |
#3128 | Cougar Solar, LLC | Sanford, NC | 3.8 GWh |
#3129 | Mill Creek Solar (OR) | Sheridan, OR | 3.8 GWh |
#3130 | River Solar | Lynchburg, SC | 3.8 GWh |
#3131 | IMPA Washington Solar Park | Washington, IN | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Firestone Walker Brewery - Phase 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 22.9 GWh | 26.4 mi |
Atascadero State Hospital | Atascadero, CA | 3.1 GWh | 9.8 mi |
Avenal Park | Avenal, CA | 11.3 GWh | 42.6 mi |
CA Flats Solar 130, LLC | Shandon, CA | 268.2 GWh | 16.3 mi |
CA Flats Solar 150, LLC | Shandon, CA | 328.9 GWh | 16.3 mi |
CED Avenal | Avenal, CA | 24.2 GWh | 41.1 mi |
Coalinga 25D Cogen | Coalinga, CA | 62.1 GWh | 42.1 mi |
Coalinga Cogeneration Facility | Coalinga, CA | 50.1 GWh | 43.8 mi |
Cold Canyon 1 | San Luis Obispo, CA | 11.7 GWh | 28.8 mi |
Coronal Lost Hills | Lost Hills, CA | 49.5 GWh | 45.2 mi |
Diablo Canyon | Avila Beach, CA | 19.5 TWh | 28.1 mi |
Meridian Vineyards | Paso Robles, CA | 1.6 GWh | 8.8 mi |
Nacimiento Hydro Project | Bradley, CA | 855.1 MWh | 17.6 mi |
Roll Lost Hills | Lost Hills, CA | 6.9 GWh | 45.4 mi |
Salinas River Cogeneration | San Ardo, CA | 249.0 GWh | 26.4 mi |
Sand Drag LLC | Avenal, CA | 37.0 GWh | 42.3 mi |
Stenner Creek Solar | San Luis Obispo, CA | 11.0 GWh | 19.1 mi |
Sun City Project LLC | Avenal, CA | 37.7 GWh | 42.3 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh | 37.6 mi |
Vintner Solar | Templeton, CA | 4.6 GWh | 2.7 mi |