Firestone Walker Brewery - Phase 1

1400 Ramada Drive, Paso Robles, CA 93446

Plant Summary Information

Firestone Walker Brewery - Phase 1 is ranked #454 out of 801 solar farms in California in terms of total annual net electricity generation.

Firestone Walker Brewery - Phase 1 generated 761.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameFirestone Walker Brewery - Phase 1
Utility NameSkyHigh 2 Solar
LocationSan Luis Obispo County, CA
Initial Operation DateNovember 2020
Last Update Dec 2023
Annual Generation 3.9 GWh
Annual Consumption 13.8 k MMBtu
Ranked #8,250 out of 11,866 Power Plants Nationwide
Ranked #3,227 out of 5,672 Solar Power Plants Nationwide
Ranked #1,152 out of 1,571 California Power Plants
Ranked #454 out of 801 California Solar Power Plants
Fuel Types Solar

Map of Firestone Walker Brewery - Phase 1

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Firestone Walker Brewery - Phase 1.

Create Your Account Today

Monthly Net Generation for Firestone Walker Brewery - Phase 1

Firestone Walker Brewery - Phase 1 Details

Summary Information
Plant NameFirestone Walker Brewery - Phase 1 (64391)
Plant Address1400 Ramada Drive, Paso Robles, CA 93446
UtilitySkyHigh 2 Solar (63432)
Latitude, Longitude35.59588, -120.69431
Generation Dates on FileNov 2020 to Dec 2023
Initial Operation DateNovember 2020
Annual Generation 3.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF20-1249-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeBeverage and Tobacco Product Manufacturing (312)
Sector Industrial Non-CHP (6)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator FWBP1 Details Operating November 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2020
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity2.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.4 MW
Virtual Net Metering AgreementNo

Firestone Walker Brewery - Phase 1 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3217Goldenrod SolarPamplico, SC3.9 GWh
#3218Laurinburg Solar, LLC (Heelstone)Maxton, NC3.9 GWh
#3219SV Gardner 1 (Lutz) CSGGardner, IL3.9 GWh
#3220Gunnison SolarGunnison, UT3.9 GWh
#3221KinstonKinston, NC3.9 GWh
#3222Sangerfield Solar CSGWaterville, NY3.9 GWh
#3223ZPD-PT Solar Project 2017-023 LLC Hybrid CSGSouthbridge, MA3.8 GWh
#3224Frenchtown II SolarFrenchtown, NJ3.9 GWh
#3225Montana Solar FacilityEl Paso, TX3.9 GWh
#3226New Lisbon SolarNew Lisbon, WI3.9 GWh
#3228Wabasha SolarWabasha, MN3.9 GWh
#3229Duke Building 98Indianapolis, IN3.9 GWh
#3230Blacktip SolarScranton, SC3.9 GWh
#3231Atood IICowpens, SC3.9 GWh
#3232UnderhillPoughkeepsie, NY3.9 GWh
#3233SR Skylark BSeverance, CO3.9 GWh
#3234O'Neill Creek SolarGaston, OR3.9 GWh
#3235Oak Leaf Solar XXXIII LLC (Lantz)Salida, CO3.9 GWh
#3236Van der Kooi Dairy Solar ArrayRiverdale, CA3.9 GWh
#3237BriarwoodGreenwood, SC3.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Firestone Walker Brewery - Phase 1.

Plant NamePlant LocationAnnual GenerationDistance
Aera San Ardo Cogen FacilitySan Ardo, CA23.6 GWh26.4 mi
Atascadero State HospitalAtascadero, CA2.8 GWh9.8 mi
Avenal ParkAvenal, CA10.6 GWh42.6 mi
Blackjack SolarKing City, CA6.9 GWh44.5 mi
CA Flats Solar 130, LLCShandon, CA228.1 GWh16.3 mi
CA Flats Solar 150, LLCShandon, CA326.9 GWh16.3 mi
CA-DGS-California Men's ColonySan Luis Obispo, CA3.7 GWh18.7 mi
CED AvenalAvenal, CA8.6 GWh41.1 mi
Coalinga 25D CogenCoalinga, CA67.0 GWh42.1 mi
Coalinga Cogeneration FacilityCoalinga, CA44.4 GWh43.8 mi
Cold Canyon 1San Luis Obispo, CA10.0 GWh28.8 mi
Diablo CanyonAvila Beach, CA17.5 TWh28.1 mi
Meridian VineyardsPaso Robles, CA1.4 GWh8.8 mi
Nacimiento Hydro ProjectBradley, CA18.6 GWh17.6 mi
Salinas River CogenerationSan Ardo, CA241.4 GWh26.4 mi
Sand Drag LLCAvenal, CA33.4 GWh42.3 mi
Stenner Creek SolarSan Luis Obispo, CA700.0 MWh19.1 mi
Sun City Project LLCAvenal, CA34.3 GWh42.3 mi
Topaz Solar FarmSanta Margarita, CA1.1 TWh37.6 mi
Vintner SolarTempleton, CA3.9 GWh2.7 mi