Firestone Walker Brewery - Phase 1

1400 Ramada Drive, Paso Robles, CA 93446

Plant Summary Information

Firestone Walker Brewery - Phase 1 is ranked #461 out of 747 solar farms in California in terms of total annual net electricity generation.

Firestone Walker Brewery - Phase 1 generated 1.0 GWh during the 3-month period between September 2022 to December 2022.

Plant NameFirestone Walker Brewery - Phase 1
Utility NameSkyHigh 2 Solar
LocationSan Luis Obispo County, CA
Initial Operation DateNovember 2020
Last Update Dec 2022
Annual Generation 3.8 GWh
Annual Consumption 13.7 k MMBtu
Ranked #8,109 out of 11,249 Power Plants Nationwide
Ranked #3,121 out of 5,158 Solar Power Plants Nationwide
Ranked #1,131 out of 1,501 California Power Plants
Ranked #461 out of 747 California Solar Power Plants
Fuel Types Solar

Map of Firestone Walker Brewery - Phase 1

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Firestone Walker Brewery - Phase 1.

Create Your Account Today

Monthly Net Generation for Firestone Walker Brewery - Phase 1

Firestone Walker Brewery - Phase 1 Details

Summary Information
Plant NameFirestone Walker Brewery - Phase 1 (64391)
Plant Address1400 Ramada Drive Paso Robles, CA 93446
UtilitySkyHigh 2 Solar (63432)
Latitude, Longitude35.59588, -120.69431
Generation Dates on FileNov 2020 to Dec 2022
Initial Operation DateNovember 2020
Annual Generation 3.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF20-1249-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeBeverage and Tobacco Product Manufacturing (312)
Sector Industrial Non-CHP (6)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator FWBP1 Details Operating November 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2020
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity2.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.4 MW
Virtual Net Metering AgreementNo

Firestone Walker Brewery - Phase 1 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3111Three BridgePembroke, NC3.9 GWh
#3112Xcel Adams 2 Community Solar ArrayWatkins, CO3.9 GWh
#3113Thomas Creek SolarMolalla, OR3.9 GWh
#3114Town of Needham VNEM CSGNeedham, MA3.9 GWh
#3115Princeton Solar ProjectPrinceton, NJ3.9 GWh
#3116Solar Photovoltaic Project #17Fontana, CA3.9 GWh
#3117Limelight Solar I, LLCSpartanburg, SC3.9 GWh
#3118CMR Solar LLCPine Bush, NY3.9 GWh
#3119River Bend Solar, LLCReed Point, MT3.9 GWh
#3120Woodsdale Farm, LLCRoxboro, NC3.8 GWh
#3122Westmont 400ALos Angeles, CA3.8 GWh
#3123Westmont 400BLos Angeles, CA3.8 GWh
#3124Long Plain SolarWhatley, MA3.8 GWh
#3125Shelby Solar ArrayShelby, OH3.8 GWh
#3126Kenansville Solar 2, LLCKenansville, NC3.8 GWh
#3127Matrix Stults Road Solar FacilitySouth Brunswick, NJ3.8 GWh
#3128Cougar Solar, LLCSanford, NC3.8 GWh
#3129Mill Creek Solar (OR)Sheridan, OR3.8 GWh
#3130River SolarLynchburg, SC3.8 GWh
#3131IMPA Washington Solar ParkWashington, IN3.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Firestone Walker Brewery - Phase 1.

Plant NamePlant LocationAnnual GenerationDistance
Aera San Ardo Cogen FacilitySan Ardo, CA22.9 GWh26.4 mi
Atascadero State HospitalAtascadero, CA3.1 GWh9.8 mi
Avenal ParkAvenal, CA11.3 GWh42.6 mi
CA Flats Solar 130, LLCShandon, CA268.2 GWh16.3 mi
CA Flats Solar 150, LLCShandon, CA328.9 GWh16.3 mi
CED AvenalAvenal, CA24.2 GWh41.1 mi
Coalinga 25D CogenCoalinga, CA62.1 GWh42.1 mi
Coalinga Cogeneration FacilityCoalinga, CA50.1 GWh43.8 mi
Cold Canyon 1San Luis Obispo, CA11.7 GWh28.8 mi
Coronal Lost HillsLost Hills, CA49.5 GWh45.2 mi
Diablo CanyonAvila Beach, CA19.5 TWh28.1 mi
Meridian VineyardsPaso Robles, CA1.6 GWh8.8 mi
Nacimiento Hydro ProjectBradley, CA855.1 MWh17.6 mi
Roll Lost HillsLost Hills, CA6.9 GWh45.4 mi
Salinas River CogenerationSan Ardo, CA249.0 GWh26.4 mi
Sand Drag LLCAvenal, CA37.0 GWh42.3 mi
Stenner Creek SolarSan Luis Obispo, CA11.0 GWh19.1 mi
Sun City Project LLCAvenal, CA37.7 GWh42.3 mi
Topaz Solar FarmSanta Margarita, CA1.1 TWh37.6 mi
Vintner SolarTempleton, CA4.6 GWh2.7 mi