8200 Old Congo Road, Benton, AR 72019Plant Summary Information
FECC Solar Benton is ranked #27 out of 27 solar farms in Arkansas in terms of total annual net electricity generation.
FECC Solar Benton generated 296.0 MWh during the 3-month period between April 2024 to July 2024.
Plant Name | FECC Solar Benton |
---|---|
Utility Name | Today's Power, Inc. |
Location | Saline County, AR |
Initial Operation Date | March 2017 |
Last Update | Jul 2024 |
Annual Generation | 1.1 GWh |
Annual Consumption | 4.3 k MMBtu |
Ranked #10,733 out of 11,835 Power Plants Nationwide | |
Ranked #5,351 out of 5,643 Solar Power Plants Nationwide | |
Ranked #71 out of 73 Arkansas Power Plants | |
Ranked #27 out of 27 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of FECC Solar Benton
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for FECC Solar Benton.
Monthly Net Generation for FECC Solar Benton
FECC Solar Benton Details
Summary Information | |
---|---|
Plant Name | FECC Solar Benton (61839) |
Plant Address | 8200 Old Congo Road, Benton, AR 72019 |
Utility | Today's Power, Inc. (61204) |
Latitude, Longitude | 34.63843, -92.57835 |
Generation Dates on File | Jan 2018 to Jul 2024 |
Initial Operation Date | March 2017 |
Annual Generation | 1.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | pending |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | First Electric Coop Corp (6342) AR |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator FECC1 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 270 |
Tilt Angle | 26 |
DC Net Capacity | 1.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
FECC Solar Benton Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5341 | Martins Creek Solar NC, LLC | Murphy, NC | 1.1 GWh |
#5342 | Magdaline Solar, LLC | Lynchburg, SC | 1.1 GWh |
#5343 | Roger Road WWTP | Tucson, AZ | 1.1 GWh |
#5344 | Springfield Solar LLC | Springfield, OH | 1.1 GWh |
#5345 | Sacramento Fairbain Water Treatment Plant | Sacramento, CA | 1.1 GWh |
#5346 | Lowell Solar Landfill | Lowell, MA | 1.1 GWh |
#5347 | CSU Pueblo | Pueblo, CO | 1.1 GWh |
#5348 | Garden 1 Solar Park | Garden Township, MI | 1.1 GWh |
#5349 | Amazon BDL3 Solar Project | New Haven, CT | 1.1 GWh |
#5350 | Monterey Regional Water Pollution Control Agency | Marina, CA | 1.1 GWh |
#5352 | Shelby Solar Energy Generation Facility | Shelby, NC | 1.1 GWh |
#5353 | SunE- E Philadelphia Ontario | Ontario, CA | 1.1 GWh |
#5354 | CA-DGS RFP-Salinas Valley State Prison | Soledad, CA | 1.1 GWh |
#5355 | Town of East Bridgewater CSG | East Bridgewater, MA | 1.1 GWh |
#5356 | Willford Solar, LLC | Gladwin, MI | 1.1 GWh |
#5357 | Western Branch High School | Chesapeake, VA | 1.1 GWh |
#5358 | Upson Rocky Creek Solar Plant | Thomaston, GA | 1.1 GWh |
#5359 | CSU Fresno Solar Project | Fresno, CA | 1.1 GWh |
#5360 | Solar Photovoltaic Project #18 | Fontana, CA | 1.1 GWh |
#5361 | Westside Avenue | North Bergen, NJ | 1.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding FECC Solar Benton.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arkansas Nuclear One | Russellville, AR | 15.6 TWh | 59.5 mi |
Blakely Mountain | Royal, AR | 234.9 GWh | 35.3 mi |
C&L | Star City, AR | 2.2 GWh | 57.8 mi |
Carpenter | Hot Springs, AR | 150.6 GWh | 28.9 mi |
Dardanelle | Dardanelle, AR | 426.2 GWh | 53.9 mi |
Degray | Arkadelphia, AR | 156.4 GWh | 42.3 mi |
Happy Solar 1 | Searcy, AR | 180.0 GWh | 63.6 mi |
Harry L. Oswald | Little Rock, AR | 941.0 GWh | 20.8 mi |
Hot Spring Generating Facility | Malvern, AR | 1.5 TWh | 28.8 mi |
Hot Springs 2020 | Hot Springs, AR | 1.7 GWh | 38.2 mi |
Lake Catherine | Jones Mill, AR | 173.5 GWh | 23.3 mi |
Magnet Cove | Malvern, AR | 3.8 TWh | 20.4 mi |
Murray | North Little Rock, AR | 142.4 GWh | 16.6 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.3 TWh | 48.2 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 47.9 mi |
Remmel | Malvern, AR | 39.7 GWh | 23.2 mi |
Searcy Solar Hybrid | Searcy, AR | 208.2 GWh | 65 mi |
Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh | 27.4 mi |
Whillock | Morrilton, AR | 135.3 GWh | 35.9 mi |
White Bluff | Redfield, AR | 2.8 TWh | 29 mi |