Fairfield Pumped Storage
Bradham Boulevard off Hwy 215, Jenkinsville, SC 29065Plant Summary Information
Fairfield Pumped Storage is ranked #20 out of 190 power plants in South Carolina in terms of total annual net electricity generation.
Fairfield Pumped Storage is comprised of 8 generators and generated 163.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Fairfield Pumped Storage |
---|---|
Utility Name | Dominion Energy South Carolina, Inc |
Location | Fairfield County, SC |
Initial Operation Date | June 1978 |
Last Update | Aug 2024 |
Annual Generation | 445.8 GWh |
Annual Consumption | 0 MMBtu |
Ranked #1,391 out of 11,835 Power Plants Nationwide | |
Ranked #101 out of 1,371 Water Power Plants Nationwide | |
Ranked #20 out of 190 South Carolina Power Plants | |
Ranked #2 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operator |
South Carolina Electric&Gas Company (2013 to 2017) Dominion Energy South Carolina, Inc (2018 to 2023) |
Map of Fairfield Pumped Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fairfield Pumped Storage.
Monthly Net Generation for Fairfield Pumped Storage
Fairfield Pumped Storage Details
Summary Information | |
---|---|
Plant Name | Fairfield Pumped Storage (6126) |
Plant Address | Bradham Boulevard off Hwy 215, Jenkinsville, SC 29065 |
Utility | Dominion Energy South Carolina, Inc (17539) |
Latitude, Longitude | 34.3061, -81.3308 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | June 1978 |
Annual Generation | 445.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Dominion Energy South Carolina (SCEG) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Broad River |
Ash Impoundment | No |
Transmission / Distribution Owner | Dominion Energy South Carolina (17539) SC |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator 5 Details Operating December 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2025 |
Multiple Fuels | No |
Generator 6 Details Operating December 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2025 |
Multiple Fuels | No |
Generator 7 Details Operating December 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2027 |
Multiple Fuels | No |
Generator 8 Details Operating December 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2027 |
Multiple Fuels | No |
Generator 1 Details Operating June 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2026 |
Multiple Fuels | No |
Generator 2 Details Operating June 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2026 |
Multiple Fuels | No |
Generator 3 Details Operating June 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2028 |
Multiple Fuels | No |
Generator 4 Details Operating June 1978
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 73.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2 MW |
Planned Net Winter Capacity Uprate | 2 MW |
Planned Uprate | October 2028 |
Multiple Fuels | No |
Fairfield Pumped Storage Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#91 | Wolf Creek | Jamestown, KY | 470.5 GWh |
#92 | Narrows (NC) | Badin, NC | 462.5 GWh |
#93 | Jaybird | Camino, CA | 461.8 GWh |
#94 | Cannelton Hydroelectric Plant | Hawesville, KY | 460.6 GWh |
#95 | Ralston | Foresthill, CA | 459.9 GWh |
#96 | Lay Dam | Clanton, AL | 454.7 GWh |
#97 | Guntersville | Guntersville, AL | 453.4 GWh |
#98 | Big Creek 4 | North Fork, CA | 452.9 GWh |
#99 | Cheoah | Tapoco, NC | 447.8 GWh |
#100 | Summer Falls Power Plant | Coulee City, WA | 447.2 GWh |
#102 | R C Kirkwood | Groveland, CA | 437.6 GWh |
#103 | Apalachia | Reliance, TN | 435.9 GWh |
#104 | Hawks Nest Hydro | Gauley Bridge, WV | 435.2 GWh |
#105 | Walter F George | Ft. Gaines, GA | 426.4 GWh |
#106 | Dardanelle | Dardanelle, AR | 426.2 GWh |
#107 | Flaming Gorge | Dutch John, UT | 413.6 GWh |
#108 | Long Lake | Ford, WA | 413.0 GWh |
#109 | Ross | Rockport, WA | 412.6 GWh |
#110 | Mitchell Dam | Verbena, AL | 409.4 GWh |
#111 | Comerford | Monroe, NH | 405.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fairfield Pumped Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allora Solar, LLC | Gilbert, SC | 165.3 GWh | 28.4 mi |
Beulah Solar | Batesburg, SC | 135.5 GWh | 28.5 mi |
Cedar Creek | Great Falls, SC | 138.7 GWh | 30.6 mi |
City West Diesel Plant | Union, SC | 64.0 MWh | 33.9 mi |
Coit GT | Columbia, SC | 400.0 MWh | 28 mi |
Dearborn | Great Falls, SC | 86.9 GWh | 30.5 mi |
Fishing Creek | Great Falls, SC | 143.3 GWh | 32.2 mi |
Hecate Energy West Newberry, LLC | Newberry, SC | 6.4 GWh | 18.6 mi |
Lockhart | Lockhart, SC | 61.7 GWh | 33.5 mi |
McMeekin | Columbia, SC | 882.6 GWh | 18.5 mi |
Midway Green Solar | Union, SC | 21.1 GWh | 8.7 mi |
Neal Shoals | Union, SC | 5.8 GWh | 25.6 mi |
Otarre Solar Park | Cayce, SC | 2.8 GWh | 30.4 mi |
Parr GT | Jenkinsville, SC | 3.1 GWh | 2.9 mi |
Parr Hydro | Jenkinsville, SC | 46.9 GWh | 3.1 mi |
Richland County Landfill | Lugoff, SC | 12.1 GWh | 33.9 mi |
Saluda Lexington | Columbia, SC | 109.5 GWh | 18.6 mi |
Saluda Solar II | Saluda, SC | 6.3 GWh | 31 mi |
V C Summer | Jenkinsville, SC | 8.7 TWh | 1 mi |
Webb Forging | Carlisle, SC | 83.0 MWh | 19.6 mi |