Exchequer
9188 Village Drive, Snelling, CA 95369Plant Summary Information
Exchequer is ranked #47 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Exchequer is comprised of 1 generator and generated 37.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Exchequer |
---|---|
Utility Name | Merced Irrigation District |
Location | Mariposa County, CA |
Initial Operation Date | July 1967 |
Last Update | Dec 2023 |
Annual Generation | 250.6 GWh |
Annual Consumption | 886.2 k MMBtu |
Ranked #2,039 out of 11,852 Power Plants Nationwide | |
Ranked #187 out of 1,371 Water Power Plants Nationwide | |
Ranked #213 out of 1,570 California Power Plants | |
Ranked #47 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of Exchequer
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Exchequer.
Monthly Net Generation for Exchequer
Exchequer Details
Summary Information | |
---|---|
Plant Name | Exchequer (409) |
Plant Address | 9188 Village Drive, Snelling, CA 95369 |
Utility | Merced Irrigation District (12312) |
Latitude, Longitude | 37.58435, -120.26859 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | July 1967 |
Annual Generation | 250.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lake Mcclure-Merced River |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | POD_EXCHEC_7_UNIT 1-APND |
Nameplate Capacity | 94.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 94.5 MW |
Winter Capacity | 94.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1967 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Exchequer Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#177 | Moccasin | Moccasin, CA | 267.8 GWh |
#178 | Jones Bluff | Selma, AL | 267.2 GWh |
#179 | Jordan Dam | Wetumpka, AL | 263.3 GWh |
#180 | Pit 7 | Montgomery Creek, CA | 263.2 GWh |
#181 | Lower Baker | Concrete, WA | 262.8 GWh |
#182 | Greenup Hydro | Franklin Furnace, OH | 262.2 GWh |
#183 | American Falls | American Falls, ID | 262.2 GWh |
#184 | Thomson | Carlton, MN | 258.7 GWh |
#185 | Ozark | Ozark, AR | 253.1 GWh |
#186 | Spier Falls | Gansevoort, NY | 252.9 GWh |
#188 | Jefferies | Moncks Corner, SC | 247.6 GWh |
#189 | Tiger Creek | Pioneer, CA | 246.0 GWh |
#190 | Cochrane | Great Falls, MT | 244.7 GWh |
#191 | Hudson Falls Hydroelectric Project | South Glens Falls, NY | 242.3 GWh |
#192 | Blakely Mountain | Royal, AR | 234.9 GWh |
#193 | Judge F Carr | French Gulch, CA | 234.3 GWh |
#194 | Edison Sault | Sault Ste. Marie, MI | 233.6 GWh |
#195 | Lewis Smith Dam | Jasper, AL | 233.4 GWh |
#196 | Woodleaf | Forbestown, CA | 231.6 GWh |
#197 | Toledo Bend | Burkville, TX | 231.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Exchequer.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2097 Helton Solar Project | Merced, CA | 2.6 GWh | 20.7 mi |
Broadway 3 - UC Merced 1 | Merced, CA | 1.2 GWh | 17.6 mi |
Dion R Holm | Groveland, CA | 509.3 GWh | 27.1 mi |
Don Pedro | La Grange, CA | 491.6 GWh | 11.3 mi |
Hickman | Hickman, CA | 3.0 GWh | 26.3 mi |
La Grange | La Grange, CA | 8.2 GWh | 11.2 mi |
McSwain | Snelling, CA | 45.9 GWh | 4.9 mi |
Merced Falls | Snelling, CA | 12.5 GWh | 5.4 mi |
Merced Solar LLC | Merced, CA | 4.1 GWh | 24.9 mi |
Mission Solar LLC | Merced, CA | 4.1 GWh | 24.8 mi |
Moccasin | Moccasin, CA | 267.8 GWh | 15.6 mi |
Pacific-Ultrapower Chinese Station | Jamestown, CA | 136.9 GWh | 23 mi |
Parker | Snelling, CA | 4.0 GWh | 12.1 mi |
R C Kirkwood | Groveland, CA | 434.9 GWh | 26.6 mi |
Sierra Pacific Chinese Camp | Chinese Camp, CA | 4.9 GWh | 23 mi |
Sierra Pacific Sonora | Standard, CA | 34.0 GWh | 26.5 mi |
Sonora 1 | Jamestown, CA | 2.7 GWh | 25.4 mi |
Turlock Lake | Hickman, CA | 5.7 GWh | 17.9 mi |
UC Merced Solar Hybrid | Merced, CA | 8.5 GWh | 17.6 mi |
Upper Dawson | La Grange, CA | 11.5 GWh | 12 mi |