Euclid Farm, Stamco N-54
26650 Lakeland Blvd, Euclid, OH 44106Plant Summary Information
Euclid Farm, Stamco N-54 is ranked #22 out of 22 wind farms in Ohio in terms of total annual net electricity generation.
Euclid Farm, Stamco N-54 generated 0.0 Wh during the 3-month period between August 2023 to November 2023.
Plant Name | Euclid Farm, Stamco N-54 |
---|---|
Utility Name | Case Western Reserve University |
Location | Cuyahoga County, OH |
Initial Operation Date | October 2012 |
Last Update | Nov 2023 |
Annual Generation | 607.9 MWh |
Annual Consumption | 2.3 k MMBtu |
Ranked #10,995 out of 11,852 Power Plants Nationwide | |
Ranked #1,329 out of 1,345 Wind Power Plants Nationwide | |
Ranked #144 out of 183 Ohio Power Plants | |
Ranked #22 out of 22 Ohio Wind Power Plants | |
Fuel Types | Wind |
Map of Euclid Farm, Stamco N-54
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Euclid Farm, Stamco N-54.
Monthly Net Generation for Euclid Farm, Stamco N-54
Euclid Farm, Stamco N-54 Details
Summary Information | |
---|---|
Plant Name | Euclid Farm, Stamco N-54 (59024) |
Plant Address | 26650 Lakeland Blvd, Euclid, OH 44106 |
Utility | Case Western Reserve University (58869) |
Latitude, Longitude | 41.60222, -81.49694 |
Generation Dates on File | Jan 2013 to Nov 2023 |
Initial Operation Date | October 2012 |
Annual Generation | 607.9 MWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Cleveland Electric Illum Co (3755) OH |
Grid Voltage | 36.20 kV |
Energy Storage | No |
Generator N-54 Details Operating October 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 1 |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | Nordex |
Predominant Turbine Model Number | N54/1000 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 229 |
Euclid Farm, Stamco N-54 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1319 | Filet Wind (5) LLC | Stratford, TX | 1.6 GWh |
#1320 | Henkel U.S. Operations Corporation | Geneva, NY | 1.6 GWh |
#1321 | Teichert Materials-Teichert Vernalis | San Joaquin, CA | 1.6 GWh |
#1322 | Foundation Cemex Madison | Madison, CA | 1.6 GWh |
#1323 | Green Providence Wind I, LLC | Providence, RI | 1.5 GWh |
#1324 | Charlestown Wind Turbine | Charlestown, MA | 1.1 GWh |
#1325 | ZCO | Tehachapi, CA | 1.1 GWh |
#1326 | Marshall Wind 5 LLC | Marshall, MN | 985.0 MWh |
#1327 | Heartland Community College | Normal, IL | 943.0 MWh |
#1328 | Foundation Superior Farms | Dixon, CA | 690.0 MWh |
#1330 | Deer Island Treatment Plant | Winthrop, MA | 37.3 GWh |
#1331 | Lucky Wind | Pipestone, MN | 576.0 MWh |
#1332 | Harbec Energy | Ontario, NY | 977.0 MWh |
#1333 | Blue Breezes LLC | Blue Earth, MN | 418.0 MWh |
#1334 | Blue Breezes II LLC | Blue Earth, MN | 418.0 MWh |
#1335 | Foundation IE | Rancho Cucamonga, CA | 391.0 MWh |
#1336 | Green Power I | North Palm Springs, CA | 318.0 MWh |
#1337 | Sand Point | Sand Point, AK | 3.3 GWh |
#1338 | Kirkwood Wind Turbine | Cedar Rapids, IA | 223.0 MWh |
#1339 | Northern Lights Wind LLC | Pipestone, MN | 157.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Euclid Farm, Stamco N-54.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.9 GWh | 31.2 mi |
Ashtabula | Ashtabula, OH | 164.1 GWh | 42.8 mi |
Cleveland Peaking | Cleveland, OH | 187.0 MWh | 5.7 mi |
Cleveland Thermal | Cleveland, OH | 1.8 GWh | 11.5 mi |
Cleveland Works | Cleveland, OH | 232.6 GWh | 12.7 mi |
Collinwood BioEnergy Facility | Cleveland, OH | 2.1 GWh | 5.8 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.3 GWh | 17.2 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 707.0 MWh | 31.8 mi |
Geneva | Geneva, OH | 19.5 GWh | 33.1 mi |
IGS AKC1 | Akron, OH | 2.3 GWh | 38.4 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 40.9 mi |
LE Wind Turbine 1 | Euclid, OH | 4.2 GWh | 1.9 mi |
Loraine County Project | Oberlin, OH | 101.3 GWh | 41.1 mi |
MCCo Solar Generating Facility | Cleveland, OH | 478.0 MWh | 7.9 mi |
Painesville | Painesville, OH | 749.0 MWh | 15.2 mi |
Perry | Perry, OH | 10.7 TWh | 22.8 mi |
Summit Street Power Plant | Kent, OH | 31.3 GWh | 32.7 mi |
Wadsworth HBS RTO BTM | Wadsworth, OH | 383.0 MWh | 41.3 mi |
Wadsworth IPS RTO BTM | Wadsworth, OH | 373.0 MWh | 37.6 mi |
West Lorain | Lorain, OH | 1.1 TWh | 41.5 mi |