Essex Junction 19
111 Park Street, Essex Junction, VT 5452Plant Summary Information
Essex Junction 19 is ranked #15 out of 111 power plants in Vermont in terms of total annual net electricity generation.
Essex Junction 19 is comprised of 9 generators and generated 6.5 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Essex Junction 19 |
---|---|
Utility Name | Green Mountain Power Corp |
Location | Chittenden County, VT |
Initial Operation Date | January 1917 |
Last Update | Oct 2024 |
Annual Generation | 45.6 GWh |
Annual Consumption | 167.8 k MMBtu |
Ranked #3,991 out of 11,866 Power Plants Nationwide | |
Ranked #529 out of 1,369 Water Power Plants Nationwide | |
Ranked #15 out of 111 Vermont Power Plants | |
Ranked #9 out of 45 Vermont Water Power Plants | |
Fuel Types | Water : 99.5% |
Map of Essex Junction 19
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Essex Junction 19.
Monthly Net Generation for Essex Junction 19
Essex Junction 19 Details
Summary Information | |
---|---|
Plant Name | Essex Junction 19 (3737) |
Plant Address | 111 Park Street, Essex Junction, VT 5452 |
Utility | Green Mountain Power Corp (7601) |
Latitude, Longitude | 44.4821, -73.1164 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | January 1917 |
Annual Generation | 45.6 GWh |
Fuel Types | Water : 99.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Winooski River |
Ash Impoundment | |
Transmission / Distribution Owner | Green Mountain Power Corp (7601) VT |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator H1 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator H2 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator H3 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator H4 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator IC-5 Details Operating October 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator IC-6 Details Operating October 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator IC-7 Details Operating October 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator IC-8 Details Operating October 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator H9 Details Operating March 2008
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Essex Junction 19 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#519 | Soft Maple | Croghan, NY | 46.8 GWh |
#520 | Dutch Flat 2 | Dutch Flat, CA | 46.7 GWh |
#521 | Leesville | Hurt, VA | 46.7 GWh |
#522 | Narrows (AR) | Murfreesboro, AR | 46.7 GWh |
#523 | New Badger | Kaukauna, WI | 46.5 GWh |
#524 | Cooper Lake | Cooper Landing, AK | 46.4 GWh |
#525 | Bonny Eagle | Hollis, ME | 45.3 GWh |
#526 | Stone Creek | Estacada, OR | 46.0 GWh |
#527 | McSwain | Snelling, CA | 45.9 GWh |
#528 | J P Priest | Nashville, TN | 45.5 GWh |
#530 | Dexter | Lowell, OR | 45.1 GWh |
#531 | Tieton Dam Hydro Electric Project | Rimrock, WA | 45.0 GWh |
#532 | Hodenpyl | Mesick, MI | 45.0 GWh |
#533 | Dahowa Hydro | Greenwich, NY | 44.6 GWh |
#534 | Conemaugh Hydro Plant | Saltsburg, PA | 44.5 GWh |
#535 | Green Island Hydroelectric Station | Green Island, NY | 44.4 GWh |
#536 | Falls River Hydro | Ashton, ID | 44.2 GWh |
#537 | Garvins Falls | Bow, NH | 44.2 GWh |
#538 | Dix Dam | Harrodsburg, KY | 44.0 GWh |
#539 | Tiber Dam Hydroelectric Plant | Chester, MT | 44.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Essex Junction 19.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
158th Fighter Wing Solar Farm | South Burlington, VT | 1.3 GWh | 1.8 mi |
Burlington GT | Burlington, VT | 472.0 MWh | 5.3 mi |
Chace Mill Winooski One | Winooski, VT | 36.3 GWh | 3.5 mi |
Charlotte Solar LLC VT | Charlotte, VT | 2.8 GWh | 11.8 mi |
Chittenden County Solar Partners | South Burlington, VT | 2.8 GWh | 3.5 mi |
Claire Solar Farm | South Burlington, VT | 3.0 GWh | 4.3 mi |
Clark Falls | Milton, VT | 19.8 GWh | 10.6 mi |
Colchester 16 | Colchester, VT | 4.0 MWh | 2.7 mi |
Fairfax Falls | Fairfax, VT | 23.2 GWh | 13.2 mi |
Georgia Mountain Community Wind Farm | Milton, VT | 26.1 GWh | 12.6 mi |
GMP Solar - Richmond | Richmond, VT | 2.9 GWh | 6.5 mi |
GMP Solar - Williston | Williston, VT | 6.9 GWh | 1.3 mi |
GMP Solar/Storage-Milton Hybrid | Milton, VT | 8.7 GWh | 6.3 mi |
Gorge 18 | South Burlington, VT | 20.5 GWh | 2.7 mi |
J C McNeil | Burlington, VT | 179.9 GWh | 4.6 mi |
Limerick Road Solar Farm | Shelburne, VT | 3.0 GWh | 10.1 mi |
Milton | Milton, VT | 48.3 GWh | 11 mi |
Peterson | Milton, VT | 36.3 GWh | 11 mi |
VEC Magee Hill Solar | Hinesburgh, VT | 1.6 GWh | 8.3 mi |
Whitcomb Solar Farm | Essex Junction, VT | 2.7 GWh | 1 mi |