Escalante Solar III, LLC
5500 North Hwy 257, Milford, UT 84751Plant Summary Information
Escalante Solar III, LLC is ranked #22 out of 121 power plants in Utah in terms of total annual net electricity generation.
Escalante Solar III, LLC generated 57.8 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Escalante Solar III, LLC |
---|---|
Utility Name | Clearway Renewable Operation & Maintenance LLC |
Location | Beaver County, UT |
Initial Operation Date | August 2016 |
Last Update | Oct 2024 |
Annual Generation | 208.5 GWh |
Annual Consumption | 773.0 k MMBtu |
Ranked #2,278 out of 11,866 Power Plants Nationwide | |
Ranked #272 out of 5,672 Solar Power Plants Nationwide | |
Ranked #22 out of 121 Utah Power Plants | |
Ranked #9 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
First Wind O&M, LLC (2013 to 2014) Dominion Renewable Energy (2015 to 2020) Clearway Renewable Operation & Maintenance LLC (2021 to 2023) |
Map of Escalante Solar III, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Escalante Solar III, LLC.
Monthly Net Generation for Escalante Solar III, LLC
Escalante Solar III, LLC Details
Summary Information | |
---|---|
Plant Name | Escalante Solar III, LLC (59389) |
Plant Address | 5500 North Hwy 257, Milford, UT 84751 |
Utility | Clearway Renewable Operation & Maintenance LLC (64629) |
Latitude, Longitude | 38.49778, -112.98694 |
Generation Dates on File | Jun 2016 to Oct 2024 |
Initial Operation Date | August 2016 |
Annual Generation | 208.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-794 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator ESCS3 Details Operating August 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 105.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Escalante Solar III, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#262 | Cutlass Solar 1 LLC | Richmond, TX | 212.8 GWh |
#263 | Iron Springs Solar, LLC | Cedar City, UT | 212.7 GWh |
#264 | Escalante Solar II, LLC | Milford, UT | 211.9 GWh |
#265 | Escalante Solar I, LLC | Milford, UT | 211.1 GWh |
#266 | Point Beach Solar | Two Creeks, WI | 210.6 GWh |
#267 | Butler Solar Project 103 | Butler, GA | 210.3 GWh |
#268 | Granite Mountain Solar East, LLC | Cedar City, UT | 210.0 GWh |
#269 | South Cheyenne Solar | South Greeley, WY | 208.9 GWh |
#270 | Holliday Creek Solar | Fort Dodge, IA | 208.9 GWh |
#271 | Searcy Solar Hybrid | Searcy, AR | 208.9 GWh |
#273 | Delta's Edge Solar | Greenwood, MS | 207.9 GWh |
#274 | Taylor County Solar | Butler, GA | 206.7 GWh |
#275 | Badger Hollow I | Montfort, WI | 206.5 GWh |
#276 | Wagyu | Damon, TX | 206.5 GWh |
#277 | Ivanpah 1 | Nipton, CA | 214.0 GWh |
#278 | Two Creeks Solar | Two Rivers, WI | 202.9 GWh |
#279 | Chesapeake Solar Project | Chesapeake, VA | 202.8 GWh |
#280 | Coniglio Solar | Wolfe City, TX | 202.3 GWh |
#281 | Sigurd Solar LLC | Sigurd, UT | 201.5 GWh |
#282 | Pioneer Solar (CO), LLC | Bennett, CO | 200.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Escalante Solar III, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 136.9 GWh | 46.2 mi |
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 28 mi |
Blundell | Milford, UT | 248.2 GWh | 7.3 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 35.6 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 22.4 mi |
Escalante Solar I, LLC | Milford, UT | 211.1 GWh | 3.1 mi |
Escalante Solar II, LLC | Milford, UT | 211.9 GWh | 2.3 mi |
Granite Peak Solar Plant | Milford, UT | 6.1 GWh | 6.6 mi |
Greenville Solar Plant | Milford, UT | 4.3 GWh | 21.5 mi |
Laho Solar Plant | Milford, UT | 6.1 GWh | 14.5 mi |
Milford 2 | Milford, UT | 6.5 GWh | 7.6 mi |
Milford Flat Solar Plant | Milford, UT | 6.1 GWh | 14.3 mi |
Milford Solar 1 | Milford, UT | 253.9 GWh | 1.8 mi |
Milford Wind Corridor I LLC | Milford, UT | 350.7 GWh | 3.8 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 160.9 GWh | 6.8 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 19.9 mi |
South Milford Solar Plant | Milford, UT | 7.1 GWh | 13.4 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 25.9 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 31.7 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 42.7 mi |