ESCA-LL-COLTON, LLC

2063 Miguel Bustamante Parkway, Colton, CA 92324

Plant Summary Information

ESCA-LL-COLTON, LLC is ranked #422 out of 799 solar farms in California in terms of total annual net electricity generation.

ESCA-LL-COLTON, LLC generated 840.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameESCA-LL-COLTON, LLC
Utility NameMadison Energy Holdings LLC
LocationSan Bernardino County, CA
Initial Operation DateSeptember 2021
Last Update Dec 2023
Annual Generation 4.6 GWh
Annual Consumption 16.3 k MMBtu
Ranked #7,825 out of 11,835 Power Plants Nationwide
Ranked #2,891 out of 5,643 Solar Power Plants Nationwide
Ranked #1,101 out of 1,569 California Power Plants
Ranked #422 out of 799 California Solar Power Plants
Fuel Types Solar

Map of ESCA-LL-COLTON, LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ESCA-LL-COLTON, LLC.

Create Your Account Today

Monthly Net Generation for ESCA-LL-COLTON, LLC

ESCA-LL-COLTON, LLC Details

Summary Information
Plant NameESCA-LL-COLTON, LLC (64270)
Plant Address2063 Miguel Bustamante Parkway, Colton, CA 92324
UtilityMadison Energy Holdings LLC (62915)
Latitude, Longitude34.03925, -117.36056
Generation Dates on FileSep 2021 to Dec 2023
Initial Operation DateSeptember 2021
Annual Generation 4.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator COLT1 Details Operating September 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.6 MW
Nameplate Power Factor0.98
Summer Capacity2.6 MW
Winter Capacity2.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2021
Planned RetirementDecember 2045
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle216
Tilt Angle10
DC Net Capacity3.3 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

ESCA-LL-COLTON, LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2881Monroe 009452 SCS Cozad, LLCCozad, NE4.6 GWh
#2882SandovalCentralia, IL4.6 GWh
#2883Trenton Solar Farm (MO)Trenton, MO4.6 GWh
#2884Polk CedartownCedartown, GA4.6 GWh
#2885Iron Horse Battery Storage HybridTucson, AZ4.6 GWh
#2886Berkley East Solar LLCBerkley, MA4.6 GWh
#28871051 Lucky Solar, LLCHamptonville, NC4.6 GWh
#2888Hanford 1 and 2Hanford, CA4.6 GWh
#2889West A&B Solar Project Hybrid CSGSouthbridge, MA4.5 GWh
#2890Waynesville Solar Farm (MO)Waynesville, MO4.6 GWh
#2892Tedder SolarDarlington, SC4.6 GWh
#2893Wilkinson DeForeGordon, GA4.6 GWh
#2894Warsaw Solar CSGMorristown, MN4.6 GWh
#2895Solar Photovoltaic Project #26Rialto, CA4.6 GWh
#2896Sheldon SolarSheldon Springs, VT4.6 GWh
#2897HampdenHampden, MA4.6 GWh
#2898Troup RC50Pine Mountain, GA4.6 GWh
#2899AMP Napoleon Solar FacilityNapoleon, OH4.6 GWh
#2900Millbury SolarMillbury, MA4.6 GWh
#2901Monroe SolarChatham, VA4.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding ESCA-LL-COLTON, LLC.

Plant NamePlant LocationAnnual GenerationDistance
Agua Mansa Power PlantColton, CA10.2 GWh0.1 mi
Broadway 2 - UC RiversideRiverside, CA3.7 GWh5.1 mi
Century Generating FacilityColton, CA651.0 MWh1.5 mi
Chambers 4 - Rialto LGB8Rialto, CA3.5 GWh6.7 mi
Colton Solar One, LLCSan Bernardino, CA2.3 GWh4.4 mi
Colton Solar Two, LLCColton, CA1.1 GWh0.2 mi
Drews Generating FacilityColton, CA606.0 MWh1.6 mi
IGS SBD1Bloomington, CA5.0 GWh1.4 mi
IGS SBD2San Bernardino, CA4.2 GWh5.1 mi
IOS II-LAX9Fontana, CA7.5 GWh6.2 mi
Kohls San Bernardino Solar FacilitySan Bernardino, CA1.0 GWh6.6 mi
Loma Linda University CogenLoma Linda, CA52.3 GWh6.5 mi
Niagara Bottling - RialtoRialto, CA7.9 GWh6.9 mi
RPUWD Scheuer Well Solar ProjectSan Bernardino, CA4.8 GWh7.1 mi
SB Water Reclamation Fuel CellSan Bernardino, CA9.5 GWh4.9 mi
Solar Photovoltaic Project #03Rialto, CA452.8 MWh4.4 mi
Solar Photovoltaic Project #28San Bernardino, CA1.9 GWh6.2 mi
SSI West Riverside Landfill LLCRiverside, CA4.8 GWh4.1 mi
Tequesquite Landfill Solar PV ProjectRiverside, CA13.2 GWh4.4 mi
UC Riverside Lots 30 & 32Riverside, CA7.0 GWh5.1 mi