Erie
618 east 2nd, Erie, KS 66733Plant Summary Information
Erie is ranked #45 out of 61 distillate fuel oil power plants in Kansas in terms of total annual net electricity generation.
Erie is comprised of 4 generators and generated 1.8 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Erie |
---|---|
Utility Name | City of Erie - (KS) |
Location | Neosho County, KS |
Initial Operation Date | November 1958 |
Last Update | Dec 2023 |
Annual Generation | 7.0 MWh |
Annual Consumption | 114 MMBtu |
Ranked #11,779 out of 11,852 Power Plants Nationwide | |
Ranked #1,142 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #147 out of 152 Kansas Power Plants | |
Ranked #45 out of 61 Kansas Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Erie
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Erie.
Monthly Net Generation for Erie
Erie Details
Summary Information | |
---|---|
Plant Name | Erie (1276) |
Plant Address | 618 east 2nd, Erie, KS 66733 |
Utility | City of Erie - (KS) (5957) |
Latitude, Longitude | 37.56681, -95.2375 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | November 1958 |
Annual Generation | 7.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Erie - (KS) (5957) KS |
Grid Voltage | 2.40 kV |
Energy Storage | No |
Generator 3 Details Operating November 1958
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1958 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating April 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating April 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating April 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Erie Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1132 | Indeck Yerkes Energy Center | Tonawanda, NY | 30.8 GWh |
#1133 | Parnassus Central Utility Plant | San Francisco, CA | 69.2 GWh |
#1134 | State Farm Insur Support Center Central | Irving, TX | 8.0 MWh |
#1135 | Stevens Community Medical Center | Morris, MN | 8.0 MWh |
#1136 | St Louis | St. Louis, MI | 175.0 MWh |
#1137 | Memphis | Memphis, MO | 8.0 MWh |
#1138 | Shelbina Power #3 | Shelbina, MO | 8.0 MWh |
#1139 | JLL-One Rockwood Road | Sleppy Hollow, NY | 8.0 MWh |
#1140 | Purdue University | West Lafayette, IN | 131.6 GWh |
#1141 | Van Sant Station | Dover, DE | 643.5 MWh |
#1143 | Adrian | Adrian, MN | 7.0 MWh |
#1144 | Shelbina Power #1 | Shelbina, MO | 7.0 MWh |
#1145 | Marceline | Marceline, MO | 7.0 MWh |
#1146 | Argyle | Argyle, WI | 10.0 MWh |
#1147 | WAL5211 | McKinney, TX | 7.0 MWh |
#1148 | Eastern Maine Medical Center | Bangor, ME | 31.6 GWh |
#1149 | High Street Station | Ipswich, MA | 28.0 MWh |
#1150 | David City | David City, NE | 8.0 MWh |
#1151 | Traer Main | Traer, IA | 7.0 MWh |
#1152 | Station H | Independence, MO | 4.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Erie.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Burlington (KS) | Burlington, KS | 117.0 MWh | 51.5 mi |
Chanute 2 | Chanute, KS | 79.2 GWh | 15 mi |
Chanute 3 | Chanute, KS | 694.0 MWh | 13.7 mi |
CML&P Generating Facility No. 2 | Coffeyville, KS | 93.2 GWh | 37.9 mi |
Coffeyville | Coffeyville, KS | 10.9 GWh | 42 mi |
East Kansas Agri-Energy, LLC | Garnett, KS | 5.0 GWh | 48.8 mi |
Erie Energy Center | Erie, KS | 1.9 GWh | 0.5 mi |
Fredonia | Fredonia, KS | 15.0 MWh | 31.7 mi |
Garnett Municipal | Garnett, KS | 9.0 MWh | 48.6 mi |
Girard | Girard, KS | 185.0 MWh | 22.2 mi |
Iola | Iola, KS | 909.0 MWh | 26.7 mi |
Jayhawk Wind Energy Center | Hepler, KS | 685.5 GWh | 14.8 mi |
Neosho Ridge Wind Energy Center | Galesburg, KS | 1.3 TWh | 9.5 mi |
Nevada | Nevada, MO | 1.1 GWh | 52.6 mi |
North Fork Ridge Wind Energy Center | Mindenmines, MO | 544.8 GWh | 41.7 mi |
Oak Grove Power Producers | Arcadia, KS | 20.2 GWh | 32.9 mi |
Prairie Queen Wind Farm | Moran, KS | 638.6 GWh | 28.5 mi |
Riverton | Riverton, KS | 1.2 TWh | 45.2 mi |
State Line Combined Cycle | Joplin, MO | 2.6 TWh | 48.7 mi |
Wolf Creek Generating Station | Burlington, KS | 9.1 TWh | 52.6 mi |