Equinix Maple Ave. Fuel Cell
1920 E. Maple Ave, El Segundo, CA 90245Plant Summary Information
Equinix Maple Ave. Fuel Cell is ranked #231 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Equinix Maple Ave. Fuel Cell is comprised of 1 generator and generated 7.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Equinix Maple Ave. Fuel Cell |
---|---|
Utility Name | 2016 ESA Project Company, LLC |
Location | Los Angeles County, CA |
Initial Operation Date | September 2017 |
Last Update | Dec 2023 |
Annual Generation | 7.8 GWh |
Annual Consumption | 63.0 k MMBtu |
Ranked #6,686 out of 11,835 Power Plants Nationwide | |
Ranked #1,637 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #920 out of 1,569 California Power Plants | |
Ranked #231 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Equinix Maple Ave. Fuel Cell
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Equinix Maple Ave. Fuel Cell.
Monthly Net Generation for Equinix Maple Ave. Fuel Cell
Equinix Maple Ave. Fuel Cell Details
Summary Information | |
---|---|
Plant Name | Equinix Maple Ave. Fuel Cell (62705) |
Plant Address | 1920 E. Maple Ave, El Segundo, CA 90245 |
Utility | 2016 ESA Project Company, LLC (62150) |
Latitude, Longitude | 33.92542, -118.39463 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | September 2017 |
Annual Generation | 7.8 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 16.34 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator EQX08 Details Operating September 2017
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.99 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Equinix Maple Ave. Fuel Cell Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1627 | Spring House | Spring House, PA | 8.1 GWh |
#1628 | Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.1 GWh |
#1629 | Island Street Peaking Plant | Kaukauna, WI | 8.0 GWh |
#1630 | Life Technologies - Pleasanton | Pleasanton, CA | 8.0 GWh |
#1631 | Wolfskill Energy Center | Fairfield, CA | 8.0 GWh |
#1632 | Sonoco Products Co | Hartsville, SC | 63.2 GWh |
#1633 | Pirkey | Hallsville, TX | 3.4 TWh |
#1634 | Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh |
#1635 | MER Queens | Elmhurst, NY | 7.8 GWh |
#1636 | Ratkovich Alhambra | Alhambra, CA | 7.8 GWh |
#1638 | ATT Jericho | Huntington, NY | 7.8 GWh |
#1639 | Comcast - Universal City | Universal City, CA | 7.8 GWh |
#1640 | NHH003 Clarkson Fuel Cell | Brooklyn, NY | 7.7 GWh |
#1641 | Equinix San Jose | San Jose, CA | 7.6 GWh |
#1642 | Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.6 GWh |
#1643 | SEMASS Resource Recovery | West Wareham, MA | 567.6 GWh |
#1644 | El Cajon Energy Center | El Cajon, CA | 7.6 GWh |
#1645 | Plant No 1 Orange County | Fountain Valley, CA | 39.3 GWh |
#1646 | Life Technologies Carlsbad | Carlsbad, CA | 7.6 GWh |
#1647 | Taylor Farms Salinas | Salinas, CA | 7.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Equinix Maple Ave. Fuel Cell.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20333 Normandie PV, LLC | Torrance, CA | 3.8 GWh | 7.7 mi |
AES Redondo Beach LLC | Redondo Beach, CA | 256.2 GWh | 5.2 mi |
AT&T - Gardena | Gardena, CA | 8.7 GWh | 6.9 mi |
AT&T - Hawthorne | Hawthorne, CA | 5.8 GWh | 4.2 mi |
Carson Cogeneration | Carson, CA | 34.8 GWh | 9 mi |
CBS Television City | Los Angeles, CA | 7.7 GWh | 10.5 mi |
Central Utilities Plant LAX 2 | Los Angeles, CA | 39.1 GWh | 1.4 mi |
DirecTV - Los Angeles | Los Angeles, CA | 7.0 GWh | 4.4 mi |
El Segundo Cogen | El Segundo, CA | 1.2 TWh | 1.4 mi |
El Segundo Energy Center LLC | El Segundo, CA | 142.7 GWh | 2 mi |
Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.1 GWh | 0.6 mi |
Francisco St. Solar | Torrance, CA | 1.8 GWh | 7.4 mi |
Honda Torrance | Torrance, CA | 762.0 MWh | 7.6 mi |
Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 136.4 GWh | 2 mi |
Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.4 GWh | 8.9 mi |
Scattergood | Playa del Rey, CA | 1.0 TWh | 2 mi |
Torrance Refining Company, LLC | Torrance, CA | 47.4 GWh | 6.2 mi |
UCLA So Campus Cogen Project | Los Angeles, CA | 214.4 GWh | 10.3 mi |
USPS PV | Los Angeles, CA | 10.8 GWh | 8.6 mi |
Verizon-Torrance | Torrance, CA | 5.8 GWh | 7.3 mi |