Enterprise Solar, LLC
2336 South Bench Road, Newcastle, UT 84756Plant Summary Information
Enterprise Solar, LLC is ranked #17 out of 121 power plants in Utah in terms of total annual net electricity generation.
Enterprise Solar, LLC generated 78.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Enterprise Solar, LLC |
---|---|
Utility Name | Clearway Renewable Operation & Maintenance LLC |
Location | Iron County, UT |
Initial Operation Date | July 2016 |
Last Update | Aug 2024 |
Annual Generation | 230.1 GWh |
Annual Consumption | 858.2 k MMBtu |
Ranked #2,152 out of 11,835 Power Plants Nationwide | |
Ranked #237 out of 5,643 Solar Power Plants Nationwide | |
Ranked #17 out of 121 Utah Power Plants | |
Ranked #4 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
First Wind O&M, LLC (2013 to 2014) Dominion Renewable Energy (2015 to 2020) Clearway Renewable Operation & Maintenance LLC (2021 to 2023) |
Map of Enterprise Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Enterprise Solar, LLC.
Monthly Net Generation for Enterprise Solar, LLC
Enterprise Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Enterprise Solar, LLC (59386) |
Plant Address | 2336 South Bench Road, Newcastle, UT 84756 |
Utility | Clearway Renewable Operation & Maintenance LLC (64629) |
Latitude, Longitude | 37.64111, -113.6125 |
Generation Dates on File | May 2016 to Aug 2024 |
Initial Operation Date | July 2016 |
Annual Generation | 230.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-792 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator ENTS1 Details Operating July 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 105.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Enterprise Solar, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#227 | RE Astoria | Rosamond, CA | 237.7 GWh |
#228 | Prairie State Solar Project | Swanwick Township, IL | 236.6 GWh |
#229 | East Line Solar | Coolidge, AZ | 236.2 GWh |
#230 | Briar Creek Solar 1 | Corsicana, TX | 235.0 GWh |
#231 | Henrietta Solar Project | Lemoore, CA | 234.2 GWh |
#232 | West of the Pecos Solar | TBD, TX | 232.6 GWh |
#233 | SR Lumpkin | Lumpkin, GA | 232.0 GWh |
#234 | Maverick Solar 4, LLC | Desert Center, CA | 231.3 GWh |
#235 | CA Flats Solar 130, LLC | Shandon, CA | 230.4 GWh |
#236 | Dressor Plains Solar, LLC | Herrick, IL | 230.4 GWh |
#238 | Lockhart Solar PV, LLC | Hinkley, CA | 219.8 GWh |
#239 | Ivanpah 1 | Nipton, CA | 230.3 GWh |
#240 | Wapello Solar LLC | Wapello, IA | 219.2 GWh |
#241 | Black Bear Solar 1 | Montgomery, AL | 218.6 GWh |
#242 | Albemarle Beach Solar | Roper, NC | 217.5 GWh |
#243 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#244 | Iron Springs Solar, LLC | Cedar City, UT | 214.0 GWh |
#245 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#246 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#247 | Escalante Solar II, LLC | Milford, UT | 212.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Enterprise Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 122.6 GWh | 29.4 mi |
Beryl Solar Plant | Beryl, UT | 6.1 GWh | 1.8 mi |
Cedar Valley Solar Plant | Cedar City, UT | 5.9 GWh | 30.8 mi |
Cove Mountain Solar | Beryl, UT | 156.5 GWh | 1.3 mi |
Cove Mountain Solar 2 | Beryl, UT | 317.3 GWh | 1.4 mi |
Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh | 21 mi |
Fiddler's Canyon #2 | Cedar City, UT | 6.9 GWh | 20.9 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.3 GWh | 22.5 mi |
Granite Mountain Solar East, LLC | Cedar City, UT | 211.2 GWh | 23 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 127.8 GWh | 19.3 mi |
Hurricane City Power | Hurricane, UT | 3.5 GWh | 35.9 mi |
Iron Springs Solar, LLC | Cedar City, UT | 214.0 GWh | 25.8 mi |
Quail Creek Hydro Plant #1 | Hurricane, UT | 10.8 GWh | 34.4 mi |
Quichapa 1 | Cedar City, UT | 7.6 GWh | 21.7 mi |
Quichapa 2 | Cedar City, UT | 7.4 GWh | 23.2 mi |
Quichapa 3 | Cedar City, UT | 7.5 GWh | 20.6 mi |
St George Red Rock | St George, UT | 675.0 MWh | 36.5 mi |
Three Peaks Power | Cedar City, UT | 186.9 GWh | 29 mi |
Veyo Heat Recovery Project | Gunlock, UT | 45.8 GWh | 21.9 mi |
Washington City Electric Generation | Washington, UT | 4.1 GWh | 34.9 mi |