Enoree Phase II Landfill Gas Recovery

1311 Anderson Ridge Rd, Greer, SC 29651

Plant Summary Information

Enoree Phase II Landfill Gas Recovery is ranked #7 out of 8 landfill gas power plants in South Carolina in terms of total annual net electricity generation.

Enoree Phase II Landfill Gas Recovery is comprised of 2 generators and generated 72.4 MWh during the 3-month period between September 2023 to December 2023.

Plant NameEnoree Phase II Landfill Gas Recovery
Utility NameEnerdyne Power Systems Inc
LocationGreenville County, SC
Initial Operation DateAugust 2008
Last Update Dec 2023
Annual Generation 283.0 MWh
Annual Consumption 16.8 k MMBtu
Ranked #11,206 out of 11,835 Power Plants Nationwide
Ranked #295 out of 299 Landfill Gas Power Plants Nationwide
Ranked #181 out of 190 South Carolina Power Plants
Ranked #7 out of 8 South Carolina Landfill Gas Power Plants
Fuel Types Landfill Gas

Map of Enoree Phase II Landfill Gas Recovery

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Enoree Phase II Landfill Gas Recovery.

Create Your Account Today

Monthly Net Generation for Enoree Phase II Landfill Gas Recovery

Enoree Phase II Landfill Gas Recovery Details

Summary Information
Plant NameEnoree Phase II Landfill Gas Recovery (56951)
Plant Address1311 Anderson Ridge Rd, Greer, SC 29651
UtilityEnerdyne Power Systems Inc (58523)
Latitude, Longitude34.8008, -82.1847
Generation Dates on FileAug 2008 to Dec 2023
Initial Operation DateAugust 2008
Annual Generation 283.0 MWh
Fuel Types Landfill Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number08-540-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas (DUK)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerDuke Energy Carolinas, LLC (5416) SC
Grid Voltage 12.47 kV
Energy StorageNo

Generator 1 Details Out of Service August 2008

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Minimum Load1.1 MW
Uprate/Derate Completed No
StatusOut of Service
First Operation DateAugust 2008
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Cofire FuelsNo

Generator 2 Details Operating August 2008

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Minimum Load1.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2008
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Cofire FuelsNo

Enoree Phase II Landfill Gas Recovery Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#279Berkeley County LandfillMoncks Corner, SC2.5 GWh
#280Pennsauken LandfillPennsauken, NJ2.4 GWh
#281Chautauqua LFGTE FacilityJamestown, NY2.2 GWh
#282Bristol PlantBristol, VA2.3 GWh
#283Noble Hill LandfillWillard, MO1.8 GWh
#284Green City Recovery, LLCGeorgetown, KY1.7 GWh
#285Alpha Ridge LFGMarriottsville, MD1.5 GWh
#286North City - Landfill Gas Engines SouthSan Diego, CA1.7 GWh
#287Port Charlotte Energy LLCPunta Gorda, FL1.3 GWh
#288SMMPA Methane Energy FacilityMora, MN1.3 GWh
#289GRS Arbor HillsNorthville, MI1.2 GWh
#290Ameresco StaffordStafford, VA1.2 GWh
#291Woodbine Landfill PlantWoodbine, NJ809.0 MWh
#292POET Biorefining - ChancellorChancellor, SD23.4 GWh
#293MAS ASB Cogen PlantAtlanta, GA39.2 GWh
#294Cedar HillsMaple Valley, WA454.0 MWh
#296GRS Fall RiverFall River, MA121.0 MWh
#297Wellford Renewable Energy PlantSpartanburg, SC79.0 MWh
#298Nove Power PlantRichmond, CA35.0 MWh
#299Pine GrovePine Grove, PA22.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Enoree Phase II Landfill Gas Recovery.

Plant NamePlant LocationAnnual GenerationDistance
Ace SolarPiedmont, SC2.1 GWh20.1 mi
AdamsPiedmont, SC4.5 GWh20.8 mi
AGA TAG Solar III LLCSpartanburg, SC3.3 GWh15.8 mi
ATOOD Solar III LLCSpartanburg, SC3.3 GWh15.8 mi
Ballenger Road Solar AInman, SC4.3 GWh17.3 mi
Berry Road SolarPelzer, SC3.1 GWh13.8 mi
BMW Manufacturing CoGreer, SC31.7 GWh6.5 mi
Bryant Road SolarSpartanburg, SC2.3 GWh20.6 mi
Limelight Solar I, LLCSpartanburg, SC3.6 GWh15.1 mi
Limelight Solar III, LLCSpartanburg, SC5.6 GWh15.8 mi
Pelzer LowerWilliamston, SC4.6 GWh19.6 mi
Pelzer Solar IPelzer, SC2.0 GWh20.6 mi
Pelzer UpperPetzer, SC4.6 GWh18.8 mi
Piedmont Hydro Power ProjectPiedmont, SC4.4 GWh17.2 mi
Pinson Solar FarmWoodruff, SC39.1 GWh9 mi
Saluda DamGreenville, SC6.2 GWh17.3 mi
W S LeeWilliamston, SC5.9 TWh19.8 mi
Wellford Renewable Energy PlantSpartanburg, SC79.0 MWh14.2 mi
White Horse Solar AGreenville, SC3.4 GWh12.2 mi
Whitt SolarPiedmont, SC4.1 GWh20 mi