ENGIE Solidago Solar Project - Hybrid
200 Dogtown Road, Townsend, DE 19734Plant Summary Information
ENGIE Solidago Solar Project - Hybrid is ranked #7 out of 29 power plants in Delaware in terms of total annual net electricity generation.
ENGIE Solidago Solar Project - Hybrid generated 35.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | ENGIE Solidago Solar Project - Hybrid |
---|---|
Utility Name | ENGIE Solidago Solar LLC |
Location | New Castle County, DE |
Initial Operation Date | December 2022 |
Last Update | Aug 2024 |
Annual Generation | 92.5 GWh |
Annual Consumption | 349.5 k MMBtu |
Ranked #3,260 out of 11,835 Power Plants Nationwide | |
Ranked #618 out of 5,643 Solar Power Plants Nationwide | |
Ranked #7 out of 29 Delaware Power Plants | |
Ranked #1 out of 13 Delaware Solar Power Plants | |
Fuel Types | Solar |
Map of ENGIE Solidago Solar Project - Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ENGIE Solidago Solar Project - Hybrid.
Monthly Net Generation for ENGIE Solidago Solar Project - Hybrid
ENGIE Solidago Solar Project - Hybrid Details
Summary Information | |
---|---|
Plant Name | ENGIE Solidago Solar Project - Hybrid (65304) |
Plant Address | 200 Dogtown Road, Townsend, DE 19734 |
Utility | ENGIE Solidago Solar LLC (64609) |
Latitude, Longitude | 39.39519, -75.7535 |
Generation Dates on File | Dec 2022 to Aug 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 92.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | Delmarva Power (5027) DE |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator SOLAR Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 64.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
ENGIE Solidago Solar Project - Hybrid Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#608 | Landrace Holdings, LLC | Conway, SC | 95.6 GWh |
#609 | Wild Springs | New Underwood, SD | 95.4 GWh |
#610 | RE Gaskell West 2 LLC | Rosamond, CA | 95.1 GWh |
#611 | Crystal Hill Solar | Crystal Hill, VA | 94.3 GWh |
#612 | North Rock | Edgerton, WI | 93.9 GWh |
#613 | Cavalier Solar | Smithfield, VA | 93.7 GWh |
#614 | CM48 | Boulder City, NV | 93.3 GWh |
#615 | Beacon Solar Plant Site 5 | Cantil, CA | 93.1 GWh |
#616 | Peace Creek Solar | Bartow, FL | 92.8 GWh |
#617 | Bear Creek | Lone Rock, WI | 92.7 GWh |
#619 | Nature Trail | TBD, FL | 92.1 GWh |
#620 | Nevada Solar One | Boulder City, NV | 94.1 GWh |
#621 | Broad River Solar, LLC | Mooresboro, NC | 91.9 GWh |
#622 | ID Solar | Kuna, ID | 91.7 GWh |
#623 | Sparkleberry | Molino, FL | 91.6 GWh |
#624 | Prineville Solar Energy LLC | Prineville, OR | 91.3 GWh |
#625 | Lake Hancock Solar | Bartow, FL | 90.8 GWh |
#626 | Waipio Solar | Waipio, HI | 90.5 GWh |
#627 | Hazlehurst II | Hazlehurst, GA | 90.3 GWh |
#628 | Citrus Ridge Solar | Bay Lake, FL | 89.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ENGIE Solidago Solar Project - Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Hen Solar | Dartley, DE | 2.7 GWh | 14.9 mi |
Blue Star | Massey, MD | 12.1 GWh | 6 mi |
Bluegrass Solar | Church Hill, MD | 158.7 GWh | 18.6 mi |
Brookside Newark | Newark, DE | 18.5 GWh | 19 mi |
Cecil County CCVT HS | Elkton, MD | 3.3 GWh | 17.9 mi |
Delaware City Plant | Delaware City, DE | 1.2 TWh | 14.7 mi |
DG AMP Solar Smyrna | Smyrna, DE | 1.9 GWh | 10.6 mi |
Dover Sun Park | Dover, DE | 12.6 GWh | 19.8 mi |
Elkton Solar | Elkton, MD | 1.5 GWh | 15.1 mi |
Energy Center Dover | Dover, DE | 104.1 GWh | 20.2 mi |
Garrison Energy Center LLC | Dover, DE | 736.7 GWh | 19.8 mi |
IKEA Perryville 460 | Perryville, MD | 5.1 GWh | 19.7 mi |
Kent County - Worton Complex | Worton, MD | 1.5 GWh | 19.7 mi |
Kent County-Kennedyville | Kennedyville, MD | 1.6 GWh | 14 mi |
PSEG Hope Creek Generating Station | Hancocks Bridge, NJ | 8.6 TWh | 12.5 mi |
PSEG Salem Generating Station | Hancocks Bridge, NJ | 19.2 TWh | 12.5 mi |
Red Lion Energy Center | New Castle, DE | 180.3 GWh | 16.2 mi |
Town of Chestertown- Chestertown WWTP | Chestertown, MD | 1.6 GWh | 21.9 mi |
Van Sant Station | Dover, DE | 643.5 MWh | 20.5 mi |
Warren F Sam Beasley Generation Station | Smyrna, DE | 52.9 GWh | 10.6 mi |