EMWD - San Jacinto RWRF NEM

770 North Sanderson Avenue, San Jacinto, CA 92582

Plant Summary Information

EMWD - San Jacinto RWRF NEM is ranked #310 out of 807 solar farms in California in terms of total annual net electricity generation.

EMWD - San Jacinto RWRF NEM generated 2.2 GWh during the 3-month period between September 2023 to December 2023.

Plant NameEMWD - San Jacinto RWRF NEM
Utility NameSkyHigh 2 Solar
LocationRiverside County, CA
Initial Operation DateJuly 2021
Last Update Dec 2023
Annual Generation 9.5 GWh
Annual Consumption 32.8 k MMBtu
Ranked #6,157 out of 11,979 Power Plants Nationwide
Ranked #1,718 out of 5,765 Solar Power Plants Nationwide
Ranked #867 out of 1,578 California Power Plants
Ranked #310 out of 807 California Solar Power Plants
Fuel Types Solar

Map of EMWD - San Jacinto RWRF NEM

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for EMWD - San Jacinto RWRF NEM.

Create Your Account Today

Monthly Net Generation for EMWD - San Jacinto RWRF NEM

EMWD - San Jacinto RWRF NEM Details

Summary Information
Plant NameEMWD - San Jacinto RWRF NEM (64397)
Plant Address770 North Sanderson Avenue, San Jacinto, CA 92582
UtilitySkyHigh 2 Solar (63432)
Latitude, Longitude33.79855, -117.01659
Generation Dates on FileJul 2021 to Dec 2023
Initial Operation DateJuly 2021
Annual Generation 9.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF20-1357-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeWater Supply and Irrigation Systems (22131)
Sector Commercial Non-CHP (4)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 12.00 kV
Energy StorageNo

Generator EMSJN Details Operating July 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.3 MW
Summer Capacity1.3 MW
Winter Capacity1.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2021
Combined Heat & Power No
Sector NameCommercial Non-CHP (4)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
Tilt Angle52
DC Net Capacity1.6 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.6 MW
Virtual Net Metering AgreementNo

EMWD - San Jacinto RWRF NEM Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1708Ventura Solar, LLCTaylorsville, NC9.5 GWh
#1709Siler City Solar 2Siler City, NC9.5 GWh
#1710Railroad Farm 2St. Pauls, NC9.5 GWh
#1711Barnwell SolarBarnwell, SC9.5 GWh
#1712TPE Hopkins Solar Holdings1, LLCWest Greenwhich, RI9.5 GWh
#1713OYA Wayside DriveWatertown, NY9.5 GWh
#1714OCI Alamo 2, LLCConverse, TX9.5 GWh
#1715Jakana SolarWilliamston, NC9.5 GWh
#1716Floyd Solar, LLCFairmont, NC9.5 GWh
#1717Blodgett Solar CSGTyngsboro, MA9.1 GWh
#1719Red Oak Solar Farm, LLCNashville, NC9.5 GWh
#1720Laurinburg FarmLaurinburg, NC9.5 GWh
#1721DodgeSun CSGKasson, MN9.5 GWh
#1722West SilerSiler City, NC9.5 GWh
#1723Rockingham Solar, LLCMarston, NC9.5 GWh
#1724Deep Branch FarmPembroke, NC9.5 GWh
#1725ZV Solar 2, LLCRed Springs, NC9.5 GWh
#1726Syncarpha Puddon II Hybrid CSGNorthbridge, MA9.3 GWh
#1727Clipperton Holdings LLCClinton, NC9.4 GWh
#1728Martin Solar CenterKents Store, VA9.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding EMWD - San Jacinto RWRF NEM.

Plant NamePlant LocationAnnual GenerationDistance
Amazon PSP1Beaumont, CA7.5 GWh8.9 mi
AP North Lake I, LPHemet, CA27.6 GWh4.1 mi
Cabazon Wind PartnersCabazon, CA118.0 GWh18.1 mi
Crafton Hills College Solar FarmYucaipa, CA55.0 MWh17.5 mi
Diamond Valley LakeWinchester, CA2.9 GWh8.7 mi
Diamond Valley Solar ProjectWinchester, CA2.3 GWh6.7 mi
EMWD - Moreno Valley RWRFMoreno Valley, CA5.3 GWh12.3 mi
EMWD - Perris Valley RWRFPerris, CA8.0 GWh10.2 mi
EMWD - San Jacinto RES BCTSan Jacinto, CA3.2 GWh0.5 mi
EMWD - Sun City RWRFMenifee, CA3.6 GWh13.6 mi
Foundation NWNACabazon, CA23.0 GWh17.3 mi
Foundation RRMCabazon, CA9.6 GWh14.2 mi
Green Power INorth Palm Springs, CA318.0 MWh18.6 mi
Park Meridian #1Riverside, CA2.4 GWh16.7 mi
PerrisPerris, CA5.2 GWh9.9 mi
Soboba Community Solar ProjectSan Jacinto, CA3.3 GWh6.7 mi
Springs Generating StationRiverside, CA11.1 GWh18.3 mi
SunEdison Walgreens Moreno ValleyMoreno Valley, CA1.3 GWh13.1 mi
Tahquitz High SchoolHemet, CA1.6 GWh2.2 mi
West Valley High School SolarHemet, CA1.4 GWh5.5 mi