EMWD - Moreno Valley RWRF
17140 Kitching Street, Moreno Valley, CA 92551Plant Summary Information
EMWD - Moreno Valley RWRF is ranked #397 out of 799 solar farms in California in terms of total annual net electricity generation.
EMWD - Moreno Valley RWRF generated 880.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | EMWD - Moreno Valley RWRF |
---|---|
Utility Name | SkyHigh 2 Solar |
Location | Riverside County, CA |
Initial Operation Date | July 2021 |
Last Update | Dec 2023 |
Annual Generation | 5.3 GWh |
Annual Consumption | 18.8 k MMBtu |
Ranked #7,570 out of 11,852 Power Plants Nationwide | |
Ranked #2,732 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,063 out of 1,570 California Power Plants | |
Ranked #397 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of EMWD - Moreno Valley RWRF
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for EMWD - Moreno Valley RWRF.
Monthly Net Generation for EMWD - Moreno Valley RWRF
EMWD - Moreno Valley RWRF Details
Summary Information | |
---|---|
Plant Name | EMWD - Moreno Valley RWRF (64406) |
Plant Address | 17140 Kitching Street, Moreno Valley, CA 92551 |
Utility | SkyHigh 2 Solar (63432) |
Latitude, Longitude | 33.86825, -117.21406 |
Generation Dates on File | Jul 2021 to Dec 2023 |
Initial Operation Date | July 2021 |
Annual Generation | 5.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-1284-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Water Supply and Irrigation Systems (22131) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator EMMOR Details Operating July 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Dual Axis Tracking | Yes |
DC Net Capacity | 3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.4 MW |
Virtual Net Metering Agreement | No |
EMWD - Moreno Valley RWRF Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2722 | Gratis Road Solar Facility | Monroe, GA | 5.3 GWh |
#2723 | SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh |
#2724 | DIA 8 | Denver, CO | 5.3 GWh |
#2725 | Lindstrom Solar CSG | Lindstrom, MN | 5.3 GWh |
#2726 | Malech Solar Farm | San Jose, CA | 5.3 GWh |
#2727 | Cortez Solar 2, LLC | Cortez, CO | 5.3 GWh |
#2728 | The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh |
#2729 | Dept of General Services -FTB | Sacramento, CA | 5.3 GWh |
#2730 | Amazon TUS2 | Tucson, AZ | 5.3 GWh |
#2731 | Kearsarge Amesbury Hybrid | Amesbury, MA | 5.1 GWh |
#2733 | CF Novel Solar CSG Gardens Seven, LLC | Clear Lake, MN | 5.3 GWh |
#2734 | Franklin 2 | Franklin, MA | 5.3 GWh |
#2735 | O'Fallon Renewable Energy Center | O'Fallon, MO | 5.3 GWh |
#2736 | Barnstable Landfill | Marstons Mills, MA | 5.3 GWh |
#2737 | Kenansville Solar Farm, LLC | Kenansville, NC | 5.2 GWh |
#2738 | GSPP Boxborough Littleton (MA) | Boxborough, MA | 5.2 GWh |
#2739 | Westmont 300B | San Pedro, CA | 5.2 GWh |
#2740 | Turnipseed Solar, LLC | Douglasville, GA | 5.2 GWh |
#2741 | BNB Camden Solar | Camden, NJ | 5.2 GWh |
#2742 | Polk County GA S1, LLC | Cedartown, GA | 5.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding EMWD - Moreno Valley RWRF.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon PSP1 | Beaumont, CA | 7.5 GWh | 13.2 mi |
Broadway 2 - UC Riverside | Riverside, CA | 3.7 GWh | 9.7 mi |
Crafton Hills College Solar Farm | Yucaipa, CA | 55.0 MWh | 13.8 mi |
Diamond Valley Solar Project | Winchester, CA | 2.3 GWh | 13.5 mi |
EMWD - Perris Valley RWRF | Perris, CA | 8.0 GWh | 7.6 mi |
EMWD - San Jacinto RES BCT | San Jacinto, CA | 3.2 GWh | 11.8 mi |
EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 9.5 GWh | 12.3 mi |
EMWD - Sun City RWRF | Menifee, CA | 3.6 GWh | 11.9 mi |
Energy Center | Redlands, CA | 4.7 GWh | 13.8 mi |
Lake Mathews | Riverside, CA | 5.1 GWh | 13.8 mi |
Loma Linda University Cogen | Loma Linda, CA | 55.1 GWh | 12.7 mi |
Park Meridian #1 | Riverside, CA | 2.4 GWh | 4.4 mi |
Perris | Perris, CA | 5.2 GWh | 2.8 mi |
Redlands Community Hospital | Redlands, CA | 9.1 GWh | 11.6 mi |
Springs Generating Station | Riverside, CA | 11.1 GWh | 6.3 mi |
SSI West Riverside Landfill LLC | Riverside, CA | 4.8 GWh | 12.1 mi |
SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 1.3 GWh | 0.9 mi |
Tahquitz High School | Hemet, CA | 1.6 GWh | 13.3 mi |
Tequesquite Landfill Solar PV Project | Riverside, CA | 13.2 GWh | 12.4 mi |
UC Riverside Lots 30 & 32 | Riverside, CA | 7.0 GWh | 9.7 mi |