Elm Branch Solar 1
5029 FM 984, Bardwell, TX 75101Plant Summary Information
Elm Branch Solar 1 is ranked #64 out of 178 solar farms in Texas in terms of total annual net electricity generation.
Elm Branch Solar 1 generated 51.9 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Elm Branch Solar 1 |
---|---|
Utility Name | Lightsource Renewable Energy Asset Management, LLC |
Location | Ellis County, TX |
Initial Operation Date | December 2021 |
Last Update | Dec 2024 |
Annual Generation | 265.3 GWh |
Annual Consumption | 960.2 k MMBtu |
Ranked #2,007 out of 11,949 Power Plants Nationwide | |
Ranked #209 out of 5,739 Solar Power Plants Nationwide | |
Ranked #366 out of 769 Texas Power Plants | |
Ranked #64 out of 178 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Elm Branch Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Elm Branch Solar 1.
Monthly Net Generation for Elm Branch Solar 1
Elm Branch Solar 1 Details
Summary Information | |
---|---|
Plant Name | Elm Branch Solar 1 (63764) |
Plant Address | 5029 FM 984, Bardwell, TX 75101 |
Utility | Lightsource Renewable Energy Asset Management, LLC (62842) |
Latitude, Longitude | 32.23256, -96.70612 |
Generation Dates on File | Oct 2021 to Dec 2024 |
Initial Operation Date | December 2021 |
Annual Generation | 265.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG20-116-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator TXEB1 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ERCOT-N |
Nameplate Capacity | 134.7 MW |
Summer Capacity | 134.7 MW |
Winter Capacity | 134.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 163 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Elm Branch Solar 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Elm Branch Solar 1, LLC | 400 Montgomery Street, 8th Floor, San Francisco, CA 94104 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#199 | Wood County | Nekoosa, WI | 271.7 GWh |
#200 | Oberon IA | Odessa, TX | 271.2 GWh |
#201 | Dry Lake Solar Energy Center | Moapa, NV | 260.5 GWh |
#202 | Boulder Solar Power, LLC | Boulder City, NV | 270.6 GWh |
#203 | Saint Solar | Coolidge, AZ | 268.3 GWh |
#204 | Hunter Solar LLC (UT) | Clawson, UT | 267.1 GWh |
#205 | Scarlet Solar (CA) | Fresno, CA | 263.3 GWh |
#206 | ANSON Solar Center, LLC | Anson, TX | 266.8 GWh |
#207 | Central Line Solar, LLC | Coolidge, AZ | 266.5 GWh |
#208 | Bluebell Solar II | Sterling, TX | 266.1 GWh |
#210 | Bellflower Solar 1 | Lewisville, IN | 264.4 GWh |
#211 | Cavalry Solar Hybrid | Monon, IN | 262.4 GWh |
#212 | Dougherty County Solar, LLC | Albany, GA | 263.1 GWh |
#213 | Raceway Solar & Storage | Lancaster, CA | 254.9 GWh |
#214 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#215 | Sunshine Valley Solar | Armagosa, NV | 260.3 GWh |
#216 | Maverick Solar 6, LLC | Desert Center, CA | 254.2 GWh |
#217 | Crooked Lake Solar, LLC | Blytheville, AR | 259.0 GWh |
#218 | Ivanpah 3 | Nipton, CA | 270.6 GWh |
#219 | Jackpot Solar, LLC | Twin Falls, ID | 257.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Elm Branch Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Dallas LLC | Dallas, TX | 27.8 GWh | 29 mi |
BPL Files Solar | Itasca, TX | 280.1 GWh | 21.6 mi |
Briar Creek Solar 1 | Corsicana, TX | 233.6 GWh | 13.4 mi |
Ellis Solar LLC | Midlothian, TX | 152.6 GWh | 26 mi |
Ennis Power Company LLC | Ennis, TX | 1.4 TWh | 6.3 mi |
Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 156.0 GWh | 30.3 mi |
Hubbard Wind | Mt Calm, TX | 983.0 GWh | 32.4 mi |
Lily Solar Hybrid | Scurry, TX | 308.8 GWh | 26.3 mi |
Limestone Wind Project | Coolidge, TX | 663.0 GWh | 26.6 mi |
Midlothian Energy Facility | Midlothian, TX | 6.3 TWh | 24.5 mi |
Mountain Creek | Dallas, TX | 654.1 GWh | 36.4 mi |
Pisgah Ridge Solar, LLC | Richland, TX | 504.3 GWh | 27.1 mi |
Pitts Dudik Solar | Hubbard, TX | 106.5 GWh | 25.4 mi |
Sun Valley Solar Project | Abbott, TX | 545.7 GWh | 30.9 mi |
Trinidad (TX) | Trinidad, TX | 330.6 GWh | 36.2 mi |
WAL284 | Mansfield, TX | 356.0 MWh | 34.3 mi |
WAL3285 | Cedar Hill, TX | 371.0 MWh | 28.9 mi |
WAL3432 | Desoto, TX | 218.0 MWh | 26.9 mi |
WAL565 | Corsicana, TX | 249.0 MWh | 19.9 mi |
WAL896 | Grand Prairie, TX | 352.0 MWh | 36 mi |