Elk River Wind
14980 SE 190th, Beaumont, KS 67072Plant Summary Information
Elk River Wind is ranked #46 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Elk River Wind generated 85.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Elk River Wind |
---|---|
Utility Name | Avangrid Renewables LLC |
Location | Butler County, KS |
Initial Operation Date | December 2005 |
Last Update | Dec 2023 |
Annual Generation | 287.8 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,876 out of 11,836 Power Plants Nationwide | |
Ranked #567 out of 1,343 Wind Power Plants Nationwide | |
Ranked #46 out of 152 Kansas Power Plants | |
Ranked #37 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) |
Map of Elk River Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Elk River Wind.
Monthly Net Generation for Elk River Wind
Elk River Wind Details
Summary Information | |
---|---|
Plant Name | Elk River Wind (56303) |
Plant Address | 14980 SE 190th, Beaumont, KS 67072 |
Utility | Avangrid Renewables LLC (15399) |
Latitude, Longitude | 37.5797, -96.5503 |
Generation Dates on File | Dec 2005 to Dec 2023 |
Initial Operation Date | December 2005 |
Annual Generation | 287.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 05-25-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Westar Energy Inc (22500) KS |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2005
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 100 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 19.2 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Elk River Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#557 | Shiloh IV Wind Project LLC | Birds Landing, CA | 294.4 GWh |
#558 | MinnDakota Wind LLC | Ivanhoe, MN | 294.1 GWh |
#559 | Rosewater Wind Farm | Chalmers, IN | 293.6 GWh |
#560 | Lone Tree Wind, LLC | Tiskilwa, IL | 293.4 GWh |
#561 | Penascal II Wind Project LLC | Sarita, TX | 292.7 GWh |
#562 | Black Oak Wind Farm | Sauk Centre, MN | 292.4 GWh |
#563 | Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh |
#564 | Deerfield Wind Energy 2 | Port Hope, MI | 291.8 GWh |
#565 | Kossuth County Wind | Lu Verne, IA | 291.6 GWh |
#566 | Spring Valley Wind Project | Ely, NV | 289.9 GWh |
#568 | New Creek Wind | New Creek, WV | 284.9 GWh |
#569 | Mountain View I & II | North Palm Springs, CA | 284.6 GWh |
#570 | Twin Buttes II Wind | Lamar, CO | 283.1 GWh |
#571 | Crane Creek Wind Energy Center | Riceville, IA | 282.2 GWh |
#572 | Wheatridge 1 | Lexington, OR | 280.2 GWh |
#573 | Tatanka Wind Power LLC | Ashley, ND | 279.3 GWh |
#574 | Northwest Ohio Wind | Haviland, OH | 281.0 GWh |
#575 | Tuscola Wind II LLC | Reese, MI | 277.0 GWh |
#576 | Campbell Hill Windpower | Glenrock, WY | 276.4 GWh |
#577 | Shiloh III Wind Project LLC | Birds Landing, CA | 275.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Elk River Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Augusta Electric Plant No 2 | Augusta, KS | 1.4 GWh | 23.9 mi |
Caney River Wind Project | Howard, KS | 709.3 GWh | 10.9 mi |
Chanute 3 | Chanute, KS | 694.0 MWh | 59.2 mi |
DeGraff Butler Electric | Burns, KS | 2.4 GWh | 32.8 mi |
East 12th Street | Winfield, KS | 3.7 GWh | 32.8 mi |
El Dorado Refinery | El Dorado, KS | 228.0 GWh | 23.2 mi |
Fredonia | Fredonia, KS | 15.0 MWh | 40.3 mi |
Frontier Windpower II | Blackwell, OK | 621.5 GWh | 58.5 mi |
Gordon Evans Energy Center | Colwich, KS | 423.9 GWh | 55.1 mi |
Kay Wind, LLC | Newkirk, OK | 992.4 GWh | 52.2 mi |
Mulvane 2 | Mulvane, KS | 20.0 MWh | 37.3 mi |
Oxford (KS) | Oxford, KS | 6.0 MWh | 39.7 mi |
Prairie Sky Solar Farm | Andover, KS | 1.8 GWh | 31 mi |
Slate Creek Wind Project LLC | Geuda Springs, KS | 512.0 GWh | 49.6 mi |
Sunflower Energy Center, LLC | Peabody, KS | 805.4 GWh | 52.6 mi |
Waste Water Plant Generator | Winfield, KS | 3.0 MWh | 34.2 mi |
Wellington 1 | Wellington, KS | 3.4 GWh | 51.8 mi |
Wellington 2 | Wellington, KS | 2.7 GWh | 48.9 mi |
West 14th Street | Winfield, KS | 1.1 GWh | 34.7 mi |
Wichita Plant | Wichita, KS | 66.0 MWh | 47.8 mi |