Electric City Solar
2400 Centerville Rd, Sturgis, MI 49091Plant Summary Information
Electric City Solar is ranked #11 out of 43 solar farms in Michigan in terms of total annual net electricity generation.
Electric City Solar generated 6.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Electric City Solar |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | St. Joseph County, MI |
Initial Operation Date | December 2020 |
Last Update | Dec 2022 |
Annual Generation | 27.8 GWh |
Annual Consumption | 99.2 k MMBtu |
Ranked #4,533 out of 11,249 Power Plants Nationwide | |
Ranked #950 out of 5,158 Solar Power Plants Nationwide | |
Ranked #129 out of 242 Michigan Power Plants | |
Ranked #11 out of 43 Michigan Solar Power Plants | |
Fuel Types | Solar |
Map of Electric City Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Electric City Solar.
Monthly Net Generation for Electric City Solar
Electric City Solar Details
Summary Information | |
---|---|
Plant Name | Electric City Solar (64097) |
Plant Address | 2400 Centerville Rd Sturgis, MI 49091 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 41.75, -85.45 |
Generation Dates on File | Dec 2020 to Dec 2022 |
Initial Operation Date | December 2020 |
Annual Generation | 27.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 20-954 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | City of Sturgis (18252) MI |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 232 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 60 |
DC Net Capacity | 18.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Electric City Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#940 | Phantom Solar | Fort Hood, TX | 28.5 GWh |
#941 | Gates Solar Station | Huron, CA | 28.3 GWh |
#942 | Puller Solar | Topping, VA | 28.2 GWh |
#943 | Twittys Creek Solar, LLC | Keysville, VA | 28.2 GWh |
#944 | Victory Pass | Desert Center, CA | 28.1 GWh |
#945 | San Miguel II Solar Energy Center | Las Vegas, NM | 27.9 GWh |
#946 | Western Antelope Dry Ranch | Lancaster, CA | 27.9 GWh |
#947 | Selmer Farm LLC | Selmer, TN | 27.9 GWh |
#948 | Mulberry Farm LLC | Selmer, TN | 27.8 GWh |
#949 | Pilesgrove | Pilesgrove, NJ | 27.8 GWh |
#951 | Pasto Solar | Spencer, NY | 27.8 GWh |
#952 | Longview Solar | Hebron, MD | 27.7 GWh |
#953 | Solar Star California, XLIV, LLC | Pearblossom, CA | 27.7 GWh |
#954 | Whitakers | Whitakers, NC | 27.7 GWh |
#955 | Pineapple | Port St Lucie, FL | 27.7 GWh |
#956 | Tropico Solar PV Plant | Delano, CA | 27.6 GWh |
#957 | San Miguel I Solar Energy Center | Las Vegas, NM | 27.6 GWh |
#958 | Creswell Alligood Solar, LLC | Creswell, NC | 27.6 GWh |
#959 | OR Solar 8, LLC | Dairy, OR | 27.6 GWh |
#960 | Adera Solar | Chowchilla, CA | 27.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Electric City Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angola Solar, LLC | Coldwater, MI | 4.2 GWh | 23.5 mi |
Coldwater Peaking Plant | Coldwater, MI | 2.1 GWh | 24.9 mi |
Columbia City Solar Park | Columbia City, IN | 7.8 GWh | 39.8 mi |
Constantine | Constantine, MI | 5.2 GWh | 13 mi |
DG AMP Solar Coldwater | Coldwater, MI | 2.0 GWh | 26.6 mi |
Earthmovers LFGTE | Elkhart, IN | 25.2 GWh | 28.5 mi |
Elkhart | Elkhart, IN | 13.6 GWh | 26.9 mi |
Green Cow Power | Goshen, IN | 12.2 GWh | 28.7 mi |
Hydro Plant | Three Rivers, MI | 60.0 MWh | 15.9 mi |
Indeck Niles Energy Center | Niles, MI | 7.8 TWh | 40.5 mi |
Kalamazoo River Generating Station | Comstock, MI | 109.0 GWh | 36.8 mi |
Middlebury Solar | Middlebury, IN | 1.5 GWh | 12.8 mi |
Mottville | White Pigeon, MI | 7.3 GWh | 16 mi |
St. Joseph Solar | Granger, IN | 24.3 GWh | 34 mi |
Sturgis City Diesel Plant | Sturgis, MI | 649.5 MWh | 3.6 mi |
Twin Branch | Mishawaka, IN | 26.3 GWh | 35.7 mi |
Twin Branch PV | Mishawaka, IN | 4.2 GWh | 34.8 mi |
Waterloo Solar, LLC | Waterloo, IN | 1.2 GWh | 30.3 mi |
Western Michigan Solar Gardens | Kalamazoo, MI | 1.6 GWh | 36.1 mi |
Western Michigan University Power Plant | Kalamazoo, MI | 63.1 GWh | 37.5 mi |