El Segundo Energy Center LLC
301 Vista Del Mar Blvd, El Segundo, CA 90245Plant Summary Information
El Segundo Energy Center LLC is ranked #69 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
El Segundo Energy Center LLC is comprised of 4 generators and generated 99.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | El Segundo Energy Center LLC |
---|---|
Utility Name | El Segundo Energy Center, LLC |
Location | Los Angeles County, CA |
Initial Operation Date | July 2013 |
Last Update | Sep 2024 |
Annual Generation | 154.3 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #2,634 out of 11,852 Power Plants Nationwide | |
Ranked #804 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #300 out of 1,570 California Power Plants | |
Ranked #69 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
NRG El Segundo Operations Inc (2013 to 2020) El Segundo Energy Center, LLC (2021 to 2023) |
Map of El Segundo Energy Center LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Segundo Energy Center LLC.
Monthly Net Generation for El Segundo Energy Center LLC
El Segundo Energy Center LLC Details
Summary Information | |
---|---|
Plant Name | El Segundo Energy Center LLC (57901) |
Plant Address | 301 Vista Del Mar Blvd, El Segundo, CA 90245 |
Utility | El Segundo Energy Center, LLC (63227) |
Latitude, Longitude | 33.91056, -118.425 |
Generation Dates on File | Aug 2013 to Sep 2024 |
Initial Operation Date | July 2013 |
Annual Generation | 154.3 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Air Cooled Condensor |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Generator 7 Details Operating July 2013
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 2021 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 198 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 195 MW |
Winter Capacity | 195 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating July 2013
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 2021 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 70.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Minimum Load | 47 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating August 2013
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1011 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 198 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 195 MW |
Winter Capacity | 195 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating August 2013
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 1011 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 70.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Minimum Load | 47 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
El Segundo Energy Center LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#794 | Wallingford Energy | Wallingford, CT | 161.3 GWh |
#795 | PE Berkeley | Berkeley, CA | 161.2 GWh |
#796 | Otsego Mill Power Plant | Otsego, MI | 161.2 GWh |
#797 | Paris (WI) | Union Grove, WI | 160.2 GWh |
#798 | James H Miller Jr | Quinton, AL | 17.1 TWh |
#799 | Toray Plastic America's CHP Plant | North Kingstown, RI | 157.3 GWh |
#800 | Lieberman | Mooringsport, LA | 155.8 GWh |
#801 | Smarr Energy Center | Forsyth, GA | 155.7 GWh |
#802 | Sarpy County | Bellevue, NE | 161.8 GWh |
#803 | Westrock Hodge (LA) | Hodge, LA | 412.2 GWh |
#805 | Glenwood Landing | Glenwood Landing, NY | 154.4 GWh |
#806 | Kenilworth Energy Facility | Kenilworth, NJ | 152.8 GWh |
#807 | SJRR Power LLC | Houston, TX | 152.2 GWh |
#808 | Frederickson | Tacoma, WA | 159.6 GWh |
#809 | International Paper Valliant OK | Valliant, OK | 450.2 GWh |
#810 | Limon Generating Station | Limon, CO | 153.7 GWh |
#811 | Marquette Energy Center | Marquette, MI | 152.6 GWh |
#812 | Canal | Sandwich, MA | 182.4 GWh |
#813 | Fulton (AR) | Fulton, AR | 148.8 GWh |
#814 | Lederle Laboratories | Pearl River, NY | 148.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Segundo Energy Center LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20333 Normandie PV, LLC | Torrance, CA | 3.8 GWh | 8.4 mi |
AES Redondo Beach LLC | Redondo Beach, CA | 256.2 GWh | 4.5 mi |
AT&T - Gardena | Gardena, CA | 8.7 GWh | 8.1 mi |
AT&T - Hawthorne | Hawthorne, CA | 5.8 GWh | 6.1 mi |
Carson Cogeneration | Carson, CA | 34.8 GWh | 10.4 mi |
Central Utilities Plant LAX 2 | Los Angeles, CA | 39.5 GWh | 2.6 mi |
DirecTV - Los Angeles | Los Angeles, CA | 7.0 GWh | 5 mi |
El Segundo Cogen | El Segundo, CA | 1.3 TWh | 1.3 mi |
Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.1 GWh | 2.4 mi |
Equinix Maple Ave. Fuel Cell | El Segundo, CA | 7.8 GWh | 2 mi |
Francisco St. Solar | Torrance, CA | 1.8 GWh | 8.1 mi |
Honda Torrance | Torrance, CA | 762.0 MWh | 8.1 mi |
Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 135.8 GWh | 1.1 mi |
KSR053 Cantara Fuel Cell | Panorama City, CA | 5.3 GWh | 11.2 mi |
Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.4 GWh | 10.6 mi |
Scattergood | Playa del Rey, CA | 1.0 TWh | 0.5 mi |
Torrance Refining Company, LLC | Torrance, CA | 50.9 GWh | 6.7 mi |
UCLA So Campus Cogen Project | Los Angeles, CA | 204.4 GWh | 11 mi |
USPS PV | Los Angeles, CA | 10.8 GWh | 10.6 mi |
Verizon-Torrance | Torrance, CA | 5.8 GWh | 8.1 mi |