El Segundo Cogen
324 West El Segundo Blvd., El Segundo, CA 90245Plant Summary Information
El Segundo Cogen is ranked #30 out of 1,570 power plants in California in terms of total annual net electricity generation.
El Segundo Cogen is comprised of 6 generators and generated 335.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | El Segundo Cogen |
---|---|
Utility Name | Chevron USA Inc-El Segundo |
Location | Los Angeles County, CA |
Initial Operation Date | December 1987 |
Last Update | Sep 2024 |
Annual Generation | 1.3 TWh |
Annual Consumption | 16.0 M MMBtu |
Ranked #638 out of 11,852 Power Plants Nationwide | |
Ranked #394 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #30 out of 1,570 California Power Plants | |
Ranked #25 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Previous Operator |
Chevron USA Inc-El Sequndo (2013 to 2016) Chevron USA Inc-El Segundo (2017 to 2023) |
Map of El Segundo Cogen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Segundo Cogen.
Monthly Net Generation for El Segundo Cogen
El Segundo Cogen Details
Summary Information | |
---|---|
Plant Name | El Segundo Cogen (10213) |
Plant Address | 324 West El Segundo Blvd., El Segundo, CA 90245 |
Utility | Chevron USA Inc-El Segundo (3452) |
Latitude, Longitude | 33.9058, -118.4031 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | December 1987 |
Annual Generation | 1.3 TWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 85-703-001; '96-29-000; 84-192-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Petroleum Refineries (32411) |
Sector | Industrial CHP (7) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GEN1 Details Operating December 1987
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | ELSEG4G 7 B1 |
Nameplate Capacity | 42.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 38.7 MW |
Winter Capacity | 38.7 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1987 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating December 1987
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | ELSEG4G 7 B1 |
Nameplate Capacity | 42.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 38.7 MW |
Winter Capacity | 38.7 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1987 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating March 1996
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | ELSEG4G 7 B1 |
Nameplate Capacity | 40.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 39.2 MW |
Winter Capacity | 39.2 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1996 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating March 1996
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 9.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.1 MW |
Winter Capacity | 9.1 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1996 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN7 Details Operating June 2013
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | ELSEG4G_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ELSEG4G_7_B1 |
Nameplate Capacity | 40.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 40.7 MW |
Winter Capacity | 40.7 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2013 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN8 Details Operating June 2013
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | ELSEG4G_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ELSEG4G_7_B1 |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 5.2 MW |
Winter Capacity | 5.2 MW |
Minimum Load | 0.5 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
El Segundo Cogen Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Chevron USA Inc | P O Box 7643545 Market Street, San Francisco, CA 94120 | Generator GEN1 | 100.00% |
Chevron USA Inc | P O Box 7643545 Market Street, San Francisco, CA 94120 | Generator GEN2 | 100.00% |
Chevron USA Inc | P O Box 7643545 Market Street, San Francisco, CA 94120 | Generator GEN3 | 100.00% |
Chevron USA Inc | P O Box 7643545 Market Street, San Francisco, CA 94120 | Generator GEN4 | 100.00% |
Chevron USA Inc | P O Box 7643545 Market Street, San Francisco, CA 94120 | Generator GEN5 | 100.00% |
Chevron USA Inc | P O Box 7643545 Market Street, San Francisco, CA 94120 | Generator GEN6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#384 | PPG Powerhouse C | Lake Charles, LA | 1.4 TWh |
#385 | Renaissance Power Plant | Carson City, MI | 1.4 TWh |
#386 | Rockingham County CT Station | Reidsville, NC | 1.4 TWh |
#387 | Ocean State Power | Harrisville, RI | 1.3 TWh |
#388 | Tait Electric Generating Station | Moraine, OH | 1.3 TWh |
#389 | Manchester Street | Providence, RI | 1.3 TWh |
#390 | Trimble County | Bedford, KY | 8.9 TWh |
#391 | Noblesville | Noblesville, IN | 1.3 TWh |
#392 | Pine Bluff Energy Center | Pine Bluff, AR | 1.3 TWh |
#393 | Nueces Bay | Corpus Christi, TX | 1.3 TWh |
#395 | Montana Power Station | El Paso, TX | 1.2 TWh |
#396 | Desert Star Energy Center | Boulder City, NV | 1.2 TWh |
#397 | Brame Energy Center | Lena, LA | 3.0 TWh |
#398 | Black Hawk Station | Borger, TX | 1.4 TWh |
#399 | Naughton | Kemmerer, WY | 3.0 TWh |
#400 | Greene County | Demopolis, AL | 1.2 TWh |
#401 | Nichols | Amarillo, TX | 1.2 TWh |
#402 | Riverton | Riverton, KS | 1.2 TWh |
#403 | Sim Gideon | Bastrop, TX | 1.2 TWh |
#404 | ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Segundo Cogen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20333 Normandie PV, LLC | Torrance, CA | 3.8 GWh | 7.2 mi |
AES Redondo Beach LLC | Redondo Beach, CA | 256.2 GWh | 3.9 mi |
AT&T - Gardena | Gardena, CA | 8.7 GWh | 6.8 mi |
AT&T - Hawthorne | Hawthorne, CA | 5.8 GWh | 4.9 mi |
Carson Cogeneration | Carson, CA | 34.8 GWh | 9.1 mi |
Central Utilities Plant LAX 2 | Los Angeles, CA | 39.5 GWh | 2.6 mi |
DirecTV - Los Angeles | Los Angeles, CA | 7.0 GWh | 5.5 mi |
El Segundo Energy Center LLC | El Segundo, CA | 154.3 GWh | 1.3 mi |
Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.1 GWh | 1.5 mi |
Equinix Maple Ave. Fuel Cell | El Segundo, CA | 7.8 GWh | 1.4 mi |
Francisco St. Solar | Torrance, CA | 1.8 GWh | 6.9 mi |
Honda Torrance | Torrance, CA | 762.0 MWh | 6.9 mi |
Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 135.8 GWh | 2 mi |
Kaiser - Harbor City | Harbor City, CA | 16.4 GWh | 10.2 mi |
KSR053 Cantara Fuel Cell | Panorama City, CA | 5.3 GWh | 10.1 mi |
Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.4 GWh | 9.4 mi |
Scattergood | Playa del Rey, CA | 1.0 TWh | 1.6 mi |
Torrance Refining Company, LLC | Torrance, CA | 50.9 GWh | 5.5 mi |
USPS PV | Los Angeles, CA | 10.8 GWh | 9.7 mi |
Verizon-Torrance | Torrance, CA | 5.8 GWh | 6.8 mi |