El Dorado Solar, LLC
4625 Latrobe Rd, El Dorado Hills, CA 95762Plant Summary Information
El Dorado Solar, LLC is ranked #505 out of 799 solar farms in California in terms of total annual net electricity generation.
El Dorado Solar, LLC generated 640.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | El Dorado Solar, LLC |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | El Dorado County, CA |
Initial Operation Date | April 2021 |
Last Update | Dec 2023 |
Annual Generation | 3.3 GWh |
Annual Consumption | 12.0 k MMBtu |
Ranked #8,716 out of 11,835 Power Plants Nationwide | |
Ranked #3,621 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,209 out of 1,569 California Power Plants | |
Ranked #505 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of El Dorado Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Dorado Solar, LLC.
Monthly Net Generation for El Dorado Solar, LLC
El Dorado Solar, LLC Details
Summary Information | |
---|---|
Plant Name | El Dorado Solar, LLC (64700) |
Plant Address | 4625 Latrobe Rd, El Dorado Hills, CA 95762 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 38.637, -121.059 |
Generation Dates on File | Apr 2021 to Dec 2023 |
Initial Operation Date | April 2021 |
Annual Generation | 3.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 21-702 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 390 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 18 |
Tilt Angle | 25 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
El Dorado Solar, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3611 | Mtn. Solar 4 (CSG) | Lakewood, CO | 3.3 GWh |
#3612 | Columbia University - Johnson Farms | Chester, NY | 3.3 GWh |
#3613 | AGA TAG Solar IV LLC | Leland, NC | 3.3 GWh |
#3614 | Cecil County CCVT HS | Elkton, MD | 3.3 GWh |
#3615 | Valley Creek Solar | Salem, OR | 3.3 GWh |
#3616 | Bio-Rad | Hercules, CA | 3.3 GWh |
#3617 | Kearsarge East Providence | East Providence, RI | 3.3 GWh |
#3618 | Brush Creek Solar | Silverton, OR | 3.3 GWh |
#3619 | Powder Hill | Enfield, CT | 3.3 GWh |
#3620 | Oak Leaf - CSG Portfolio (OL 37) | Watkins, CO | 3.3 GWh |
#3622 | Whiteside Solar 1 CSG | Fulton, IL | 3.3 GWh |
#3623 | Three Bridge | Pembroke, NC | 3.3 GWh |
#3624 | Mount Hope West | Mount Hope, NY | 3.3 GWh |
#3625 | Palombo Solar, LLC CSG | Uxbridge, MA | 3.3 GWh |
#3626 | Innovative Solar 18, LLC | Bostic, NC | 3.3 GWh |
#3627 | Nashville Farms, LLC | Nashville, NC | 3.3 GWh |
#3628 | Ludlow Landfill | Ludlow, MA | 3.3 GWh |
#3629 | County Home Solar Center, LLC | Shelby, NC | 3.3 GWh |
#3630 | Panda Solar NC 2, LLC | Fairmont, NC | 3.3 GWh |
#3631 | Southern Sky Renew Energy Berkley LLC | Berkley, MA | 3.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Dorado Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aerojet I | Rancho Cordova, CA | 5.9 GWh | 5.8 mi |
Aerojet II | Rancho Cordova, CA | 3.7 GWh | 6.3 mi |
Blue Shld Of Cal- El Dorado Hlls Mtr B | El Dorado Hills, CA | 3.0 GWh | 1.2 mi |
Broadridge Cogen | El Dorado Hills, CA | 19.3 GWh | 1.3 mi |
Deer Creek 2 | Shingle Springs, CA | 2.7 GWh | 4.1 mi |
Dept of General Services -FTB | Sacramento, CA | 5.3 GWh | 16.1 mi |
El Dorado County | Placerville, CA | 3.8 GWh | 13.1 mi |
FAA NorCal TRACON | Mather AFB, CA | 1.2 GWh | 12 mi |
Folsom | Folsom, CA | 648.5 GWh | 7.2 mi |
Folsom SP and CSP Sacramento | Represa, CA | 611.0 MWh | 6.5 mi |
Intel Folsom | Folsom, CA | 1.4 GWh | 6.2 mi |
Intel Folsom Phase 2 | Folsom, CA | 1.7 GWh | 5.7 mi |
Intel Folsom Phase 3 | Folsom, CA | 8.7 GWh | 5.6 mi |
Kiefer Landfill | Sloughhouse, CA | 66.6 GWh | 11.2 mi |
Newcastle | Auburn, CA | 17.3 GWh | 13.8 mi |
Nimbus | Folsom, CA | 69.9 GWh | 8.7 mi |
Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.2 GWh | 13.2 mi |
RE Dillard 1 LLC | Sloughhouse, CA | 6.2 GWh | 13.4 mi |
RE Dillard 2 LLC | Sloughhouse, CA | 6.2 GWh | 13.4 mi |
RE Dillard 3 LLC | Sloughhouse, CA | 6.2 GWh | 13.8 mi |