El Centro Hybrid
485 E. Villa Avenue, El Centro, CA 92243Plant Summary Information
El Centro Hybrid is ranked #34 out of 1,569 power plants in California in terms of total annual net electricity generation.
El Centro Hybrid is comprised of 7 generators and generated 413.1 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | El Centro Hybrid |
---|---|
Utility Name | Imperial Irrigation District |
Location | Imperial County, CA |
Initial Operation Date | August 1952 |
Last Update | Aug 2024 |
Annual Generation | 1.1 TWh |
Annual Consumption | 10.6 M MMBtu |
Ranked #706 out of 11,835 Power Plants Nationwide | |
Ranked #427 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #34 out of 1,569 California Power Plants | |
Ranked #28 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of El Centro Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Centro Hybrid.
Monthly Net Generation for El Centro Hybrid
El Centro Hybrid Details
Summary Information | |
---|---|
Plant Name | El Centro Hybrid (389) |
Plant Address | 485 E. Villa Avenue, El Centro, CA 92243 |
Utility | Imperial Irrigation District (9216) |
Latitude, Longitude | 32.80222, -115.54 |
Generation Dates on File | Apr 2001 to Aug 2024 |
Initial Operation Date | August 1952 |
Annual Generation | 1.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Imperial Irrigation District (IID) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Dogwood Canal |
Ash Impoundment | No |
Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
Grid Voltage | 92.00 kV |
Energy Storage | Yes |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator 2 Details Operating August 1952
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STM2 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 34.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 32.5 MW |
Winter Capacity | 32.5 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating August 1968
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 81.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 67.6 MW |
Winter Capacity | 72 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1968 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas / Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / RFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 70 MW |
Net Winter Capacity With Natural Gas | 72 MW |
Net Summer Capacity With Oil | 70 MW |
Net Winter Capacity With Oil | 72 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2A Details Operating June 1993
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STM2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 89.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 73 MW |
Winter Capacity | 73 MW |
Minimum Load | 48 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1993 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 71 MW |
Net Winter Capacity With Natural Gas | 73 MW |
Net Summer Capacity With Oil | 71 MW |
Net Winter Capacity With Oil | 73 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 30 Details Operating October 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STM3 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 65.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 53 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 31 Details Operating October 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STM3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 43.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 39 MW |
Winter Capacity | 46 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 32 Details Operating October 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STM3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 43.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 39 MW |
Winter Capacity | 46 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BESS Details Operating October 2016
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 20 |
---|---|
Maximum Charge Rate | 30 MW |
Maximum Discharge Rate | 30 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 14.4 |
Storage Enclosure Type | BL |
Frequency Regulation | Yes |
Load Following | P |
Ramping Spinning Reserve | Yes |
Voltage Or Reactive Power Support | Yes |
Independent | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | Yes |
El Centro Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#417 | Bowline Point | West Haverstraw, NY | 1.1 TWh |
#418 | Shell Deer Park | Deer Park, TX | 1.4 TWh |
#419 | Tiger Bay | Ft. Meade, FL | 1.1 TWh |
#420 | Air Products Port Arthur | Port Arthur, TX | 1.2 TWh |
#421 | Wilkes | Avinger, TX | 1.1 TWh |
#422 | Johnson County | Cleburne, TX | 1.1 TWh |
#423 | West Lorain | Lorain, OH | 1.1 TWh |
#424 | Stryker Creek | Jacksonville, TX | 1.1 TWh |
#425 | Ocean State Power II | Harrisville, RI | 1.1 TWh |
#426 | Kyrene | Tempe, AZ | 1.1 TWh |
#428 | Arthur Kill Generating Station | Staten Island, NY | 1.1 TWh |
#429 | Blythe Energy Inc | Blythe, CA | 1.1 TWh |
#430 | Deer Creek Station | White, SD | 1.1 TWh |
#431 | Michigan Power LP | Ludington, MI | 1.1 TWh |
#432 | Faribault Energy Park | Faribault, MN | 1.1 TWh |
#433 | Salem Harbor Power Development LP | Salem, MA | 1.0 TWh |
#434 | Southwestern | Anadarko, OK | 1.0 TWh |
#435 | Afton Generating Station | La Mesa, NM | 1.0 TWh |
#436 | Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh |
#437 | Scattergood | Playa del Rey, CA | 1.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Centro Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 328.6 GWh | 11.3 mi |
Centinela Solar Energy | Calexico, CA | 491.6 GWh | 10.1 mi |
Community Solar 1 | Brawley, CA | 13.3 GWh | 12.9 mi |
Crown Cooling Facility | Brawley, CA | 537.0 MWh | 11.4 mi |
Drew Solar LLC | Calexico, CA | 304.0 GWh | 10.8 mi |
Drop 5 | Calexico, CA | 9.2 GWh | 12.4 mi |
Heber Geothermal | Heber, CA | 250.1 GWh | 6.2 mi |
Heber Solar | Heber, CA | 25.5 GWh | 6.2 mi |
Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh | 11.8 mi |
Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh | 9.5 mi |
IVC Solar | Imperial, CA | 3.7 GWh | 2.8 mi |
Mount Signal Solar Farm II | Calexico, CA | 405.6 GWh | 10.6 mi |
Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh | 8.7 mi |
Rockwood | Brawley, CA | 3.9 GWh | 10.6 mi |
Second Imperial Geothermal | Heber, CA | 326.6 GWh | 6.1 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 13.6 mi |
Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh | 0.4 mi |
Spreckels Sugar Company | Brawley, CA | 15.8 GWh | 7.7 mi |
Valencia 3 | Imperial, CA | 8.3 GWh | 5.8 mi |
Wistaria Ranch Solar | Calexico, CA | 295.2 GWh | 9.9 mi |