El Campo Wind
5309 FM 1756 East, Truscott, TX 79227Plant Summary Information
El Campo Wind is ranked #46 out of 221 wind farms in Texas in terms of total annual net electricity generation.
El Campo Wind generated 206.5 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | El Campo Wind |
---|---|
Utility Name | El Campo Wind, LLC (Longroad) |
Location | Knox County, TX |
Initial Operation Date | December 2020 |
Last Update | Jan 2025 |
Annual Generation | 786.4 GWh |
Annual Consumption | 2.9 M MMBtu |
Ranked #895 out of 11,979 Power Plants Nationwide | |
Ranked #152 out of 1,359 Wind Power Plants Nationwide | |
Ranked #155 out of 774 Texas Power Plants | |
Ranked #46 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Longroad Energy Services LLC (2018 to 2022) El Campo Wind, LLC (Longroad) (2023 to 2023) |
Map of El Campo Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Campo Wind.
Monthly Net Generation for El Campo Wind
El Campo Wind Details
Summary Information | |
---|---|
Plant Name | El Campo Wind (62765) |
Plant Address | 5309 FM 1756 East, Truscott, TX 79227 |
Utility | El Campo Wind, LLC (Longroad) (65905) |
Latitude, Longitude | 33.73218, -99.72639 |
Generation Dates on File | Dec 2020 to Jan 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 786.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator CAMPO Details Operating December 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 242.8 MW |
Summer Capacity | 242.8 MW |
Winter Capacity | 242.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 67 |
Multiple Fuels | No |
Cofire Fuels | No |
Turbine Details | |
Number Of Turbines | 67 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V150-4.2 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 344 |
El Campo Wind Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Ninnescah Wind Energy, LLC | Cunningham, KS | 807.9 GWh |
#143 | Bluestem | Beaver, OK | 807.6 GWh |
#144 | Sunflower Energy Center, LLC | Peabody, KS | 807.2 GWh |
#145 | Lundgren Wind Project | Otho, IA | 805.8 GWh |
#146 | Upstream Wind Energy LLC | Neligh, NE | 802.8 GWh |
#147 | Cedar Bluff Wind, LLC | Brownwell, KS | 802.5 GWh |
#148 | Plymouth Wind | Remsen, IA | 800.9 GWh |
#149 | Nobles Wind Project | Reading, MN | 797.3 GWh |
#150 | Crowned Ridge Wind Energy Center | Watertown, SD | 790.6 GWh |
#151 | Cimarron Bend Wind Project II, LLC | Minneola, KS | 788.7 GWh |
#153 | North Bend Wind Project, LLC | Highmore, SD | 785.2 GWh |
#154 | Freeborn Wind Farm | Glenville, MN | 782.2 GWh |
#155 | Ledyard Windpower, LLC | Lakota, IA | 781.8 GWh |
#156 | Blue Creek Wind Project | Paulding, OH | 779.7 GWh |
#157 | Longhorn Wind | Silverton, TX | 779.4 GWh |
#158 | Red Dirt Wind Project | Hennessy, OK | 778.4 GWh |
#159 | Aragonne Wind LLC | Santa Rosa, NM | 773.0 GWh |
#160 | Haystack Wind Project, LLC | Carroll, NE | 767.3 GWh |
#161 | Turtle Creek Wind Farm LLC | St. Ansgar, IA | 765.9 GWh |
#162 | Prairie Breeze | Elgin, NE | 765.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Campo Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 47.1 mi |
Blue Summit II Wind, LLC | Vernon, TX | 375.8 GWh | 37 mi |
Blue Summit III Wind | Chilicothe, TX | 747.0 GWh | 31.7 mi |
Blue Summit Wind LLC | Vernon, TX | 492.6 GWh | 43.9 mi |
Diversion Wind Energy LLC | Seymour, TX | 98.1 GWh | 40.4 mi |
Electra Wind Farm | Oklaunion, TX | 855.3 GWh | 43.2 mi |
Foard City Wind | Crowell, TX | 1.2 TWh | 12.7 mi |
Green Pastures Wind I | Seymour, TX | 89.4 GWh | 19.5 mi |
Green Pastures Wind II | Seymour, TX | 178.7 GWh | 12.6 mi |
Griffin Trail Wind | E Seymour, TX | 735.9 GWh | 11.9 mi |
Horse Creek Wind Farm | Weinert, TX | 818.8 GWh | 28.5 mi |
Inertia Wind Project | Haskell, TX | 1.3 TWh | 38.4 mi |
King Creek Wind Farm 1, LLC | Throckmorton, TX | 559.6 GWh | 35.4 mi |
King Creek Wind Farm 2, LLC | Throckmorton, TX | 617.9 GWh | 42.7 mi |
Lockett Windfarm | Vernon, TX | 731.8 GWh | 35.4 mi |
Montgomery Ranch Wind Farm, LLC | Crowell, TX | 55.9 GWh | 8.5 mi |
Seymour Hills Wind Project, LLC | Seymour, TX | 130.9 GWh | 32.5 mi |
TG East | Truscott, TX | 1.1 TWh | 3.6 mi |
Western Trail Wind, LLC | Electra, TX | 1.2 TWh | 38.9 mi |
Willow Springs Wind Farm | Weinert, TX | 888.7 GWh | 27.4 mi |