Eight Point Wind is ranked #39 out of 832 power plants in New York in terms of total annual net electricity generation.
Eight Point Wind generated 38.5 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Eight Point Wind |
---|---|
Utility Name | Eight Point Wind, LLC |
Location | Steuben County, NY |
Initial Operation Date | February 2023 |
Last Update | Sep 2024 |
Annual Generation | 272.5 GWh |
Annual Consumption | 971.7 k MMBtu |
Ranked #1,943 out of 11,852 Power Plants Nationwide | |
Ranked #586 out of 1,345 Wind Power Plants Nationwide | |
Ranked #39 out of 832 New York Power Plants | |
Ranked #4 out of 34 New York Wind Power Plants | |
Fuel Types | Wind |
Map of Eight Point Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eight Point Wind.
Monthly Net Generation for Eight Point Wind
Eight Point Wind Details
Summary Information | |
---|---|
Plant Name | Eight Point Wind (66052) |
Plant Address | 761 Town Line Rd, Rexville, NY 14877 |
Utility | Eight Point Wind, LLC (65225) |
Latitude, Longitude | 42.10164, -77.70111 |
Generation Dates on File | Feb 2023 to Sep 2024 |
Initial Operation Date | February 2023 |
Annual Generation | 272.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator EPW01 Details Operating February 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ISO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ISO |
Nameplate Capacity | 101.2 MW |
Summer Capacity | 101.2 MW |
Winter Capacity | 101.2 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 25 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 25 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 5.5-158 |
Design Wind Speed | 17.1 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 383.9 |
Eight Point Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#576 | Wheatridge 1 | Lexington, OR | 278.3 GWh |
#577 | Penascal II Wind Project LLC | Sarita, TX | 277.6 GWh |
#578 | Mountain View I & II | North Palm Springs, CA | 277.3 GWh |
#579 | Campbell Hill Windpower | Glenrock, WY | 277.2 GWh |
#580 | Saratoga Wind Farm | Lime Springs, IA | 276.5 GWh |
#581 | Shiloh III Wind Project LLC | Birds Landing, CA | 275.6 GWh |
#582 | Top of the World Windpower Project | Glenrock, WY | 274.7 GWh |
#583 | Beethoven Wind | Tripp, SD | 274.5 GWh |
#584 | Tatanka Wind Power LLC | Ashley, ND | 273.2 GWh |
#585 | Stillwater Wind, LLC | Reed Point, MT | 273.1 GWh |
#587 | Sendero | Hebbronville, TX | 272.5 GWh |
#588 | Smoky Hills Wind Project Phase I | Lincoln, KS | 272.0 GWh |
#589 | Blue Canyon Windpower V LLC | Carnegie, OK | 272.0 GWh |
#590 | Prairie Breeze II | Elgin, NE | 270.4 GWh |
#591 | Broken Bow Wind II, LLC | Broken Bow, NE | 270.1 GWh |
#592 | Bull Creek Wind | O'Donnell, TX | 269.0 GWh |
#593 | Sunray Wind I | Sunray, TX | 268.2 GWh |
#594 | New Harvest Wind Project LLC | Schleswig, IA | 268.1 GWh |
#595 | Meadow Creek Project Company | Idaho Falls, ID | 266.2 GWh |
#596 | South Trent Wind Farm | Sweetwater, TX | 264.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eight Point Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allegany Cogen | Fillmore, NY | 11.7 GWh | 33.5 mi |
Angelica Solar Site 1 | Angelica, NY | 7.9 GWh | 23.6 mi |
Angelica Solar Site 2 | Belfast, NY | 7.9 GWh | 23.8 mi |
Angelica Solar Site 3 | Belfast, NY | 7.9 GWh | 23.6 mi |
Angelica Solar Site 4 | Angelica, NY | 7.9 GWh | 23.5 mi |
Baron Winds Farm | Cohocton, NY | 341.3 GWh | 19.7 mi |
Big Level Wind | Hector Township, PA | 260.8 GWh | 16.2 mi |
Bright Field Solar LLC(CSG) | Burns, NY | 5.7 GWh | 24.8 mi |
Bright Hill Solar LLC(CSG) | Dansville, NY | 7.8 GWh | 25.3 mi |
Cohocton Wind Project | Cohocton, NY | 185.4 GWh | 25.8 mi |
County Route 84 Solar | Troupsburg, NY | 8.7 GWh | 8 mi |
Dutch Hill Wind Project | Cohocton, NY | 79.5 GWh | 32.4 mi |
Houghton | Houghton, NY | 2.8 GWh | 32.4 mi |
Howard Wind Farm | Hornell, NY | 107.6 GWh | 16.9 mi |
Hyland LFGTE Facility | Angelica, NY | 34.1 GWh | 20.1 mi |
Jordan Energy-DFA Middlebury Center Plan | Middlebury Center, PA | 1.6 GWh | 28.4 mi |
Marsh Hill Wind Farm | Jasper, NY | 38.1 GWh | 9.8 mi |
Time Warner Cable - Knowles | Bath, NY | 3.0 GWh | 23.3 mi |
Troupsburg | Troupsburg, NY | 8.2 GWh | 17.8 mi |
Wildflower Way Solar | Bath, NY | 7.7 GWh | 27 mi |