Eiffel Solar Project
2199 County Road 12530, Paris, TX 75462Plant Summary Information
Eiffel Solar Project is ranked #18 out of 184 solar farms in Texas in terms of total annual net electricity generation.
Eiffel Solar Project generated 95.1 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Eiffel Solar Project |
---|---|
Utility Name | Paris Farm Solar, LLC |
Location | Lamar County, TX |
Initial Operation Date | November 2023 |
Last Update | Feb 2025 |
Annual Generation | 558.1 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,196 out of 11,993 Power Plants Nationwide | |
Ranked #56 out of 5,778 Solar Power Plants Nationwide | |
Ranked #223 out of 777 Texas Power Plants | |
Ranked #18 out of 184 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Eiffel Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eiffel Solar Project.
Monthly Net Generation for Eiffel Solar Project
Eiffel Solar Project Details
Summary Information | |
---|---|
Plant Name | Eiffel Solar Project (66471) |
Plant Address | 2199 County Road 12530, Paris, TX 75462 |
Utility | Paris Farm Solar, LLC (65517) |
Latitude, Longitude | 33.59917, -95.52506 |
Generation Dates on File | Nov 2023 to Feb 2025 |
Initial Operation Date | November 2023 |
Annual Generation | 558.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator EIFEL Details Operating November 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 240 MW |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
DC Net Capacity | 314 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Eiffel Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#46 | Bighorn Solar 1 | Pueblo, CO | 595.2 GWh |
#47 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#48 | Blythe Mesa Solar II | Blythe, CA | 563.5 GWh |
#49 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 561.2 GWh |
#50 | RE Maplewood | McCamey, TX | 577.1 GWh |
#51 | AV Solar Ranch One | Lancaster, CA | 573.5 GWh |
#52 | Oberon Solar Project | Desert Center, CA | 547.1 GWh |
#53 | Dodge Flat | Reno, NV | 556.8 GWh |
#54 | Victory Pass | Desert Center, CA | 554.6 GWh |
#55 | Texas Solar Nova 2 | Spur, TX | 558.6 GWh |
#57 | Daggett 2 | Daggett, CA | 539.0 GWh |
#58 | Golden Field Solar III, LLC | Rosamond, CA | 538.2 GWh |
#59 | Sun Valley Solar Project | Abbott, TX | 544.6 GWh |
#60 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#61 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 536.5 GWh |
#62 | Phoebe Solar | Kermit, TX | 529.9 GWh |
#63 | ENGIE Long Draw Solar LLC | Gail, TX | 526.8 GWh |
#64 | Dunn's Bridge 1 Solar | Wheatfield, IN | 523.8 GWh |
#65 | Azure Sky Solar | Haskell, TX | 515.8 GWh |
#66 | Sparta Solar | Pawnee, TX | 513.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eiffel Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BT Signal Ranch | Quinlan, TX | 16.1 GWh | 53.3 mi |
Chisum | Blossom, TX | 21.9 GWh | 8.1 mi |
Coniglio Solar | Wolfe City, TX | 191.4 GWh | 34.8 mi |
Delilah Solar Energy LLC | Bogota, TX | 103.3 GWh | 30.1 mi |
Estonian Solar Project, LLC | Cooper, TX | 26.9 GWh | 12.8 mi |
G.S.E. One LLC | Bonham, TX | 166.9 GWh | 36.4 mi |
Hopkins Energy LLC | Dike, TX | 418.1 GWh | 26.6 mi |
Hugo | Fort Towson, OK | 1.5 TWh | 31.1 mi |
Impact Solar 1 | Deport, TX | 329.7 GWh | 12.7 mi |
International Paper Valliant OK | Valliant, OK | 448.9 GWh | 36.3 mi |
Lamar Power Project | Paris, TX | 6.1 TWh | 4.3 mi |
Leon Solar | Greenville, TX | 20.8 GWh | 51.1 mi |
Mockingbird Solar Center | Brookston, TX | 387.0 GWh | 15.4 mi |
Paris Energy Center | Paris, TX | 858.7 GWh | 7 mi |
Powerlane Plant | Greenville, TX | 62.4 GWh | 45.6 mi |
Samson Solar Energy | Cunningham, TX | 416.1 GWh | 30.7 mi |
Samson Solar Energy III LLC | Cunningham, TX | 202.3 GWh | 15.3 mi |
Stampede Solar Hybrid | Saltillo, TX | 133.8 GWh | 29.9 mi |
Sterling Solar (TX) | Greenville, TX | 16.7 GWh | 47.9 mi |
Whitewright Solar | Whitewright, TX | 20.2 GWh | 49.7 mi |