Eiffel Solar Project
2199 County Road 12530, Paris, TX 75462Plant Summary Information
Eiffel Solar Project is ranked #19 out of 166 solar farms in Texas in terms of total annual net electricity generation.
Eiffel Solar Project generated 173.1 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Eiffel Solar Project |
---|---|
Utility Name | Paris Farm Solar, LLC |
Location | Lamar County, TX |
Initial Operation Date | November 2023 |
Last Update | Sep 2024 |
Annual Generation | 521.6 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,255 out of 11,852 Power Plants Nationwide | |
Ranked #56 out of 5,655 Solar Power Plants Nationwide | |
Ranked #235 out of 754 Texas Power Plants | |
Ranked #19 out of 166 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Eiffel Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eiffel Solar Project.
Monthly Net Generation for Eiffel Solar Project
Eiffel Solar Project Details
Summary Information | |
---|---|
Plant Name | Eiffel Solar Project (66471) |
Plant Address | 2199 County Road 12530, Paris, TX 75462 |
Utility | Paris Farm Solar, LLC (65517) |
Latitude, Longitude | 33.59917, -95.52506 |
Generation Dates on File | Nov 2023 to Sep 2024 |
Initial Operation Date | November 2023 |
Annual Generation | 521.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator EIFEL Details Operating November 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 240 MW |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
DC Net Capacity | 314 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Eiffel Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#46 | Blythe Mesa Solar II | Blythe, CA | 544.2 GWh |
#47 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.5 GWh |
#48 | Lumina II Solar Project | Snyder, TX | 553.5 GWh |
#49 | Solar Blue | Lemoore, CA | 560.8 GWh |
#50 | Oberon Solar Project | Desert Center, CA | 535.4 GWh |
#51 | Dodge Flat | Reno, NV | 542.9 GWh |
#52 | Hecate Energy Frye Solar LLC | Kress, TX | 547.6 GWh |
#53 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#54 | Sun Valley Solar Project | Abbott, TX | 534.8 GWh |
#55 | ENGIE Long Draw Solar LLC | Gail, TX | 528.7 GWh |
#57 | Golden Field Solar III, LLC | Rosamond, CA | 512.4 GWh |
#58 | Phoebe Solar | Kermit, TX | 514.1 GWh |
#59 | Dunn's Bridge 1 Solar | Wheatfield, IN | 513.4 GWh |
#60 | Azure Sky Solar | Haskell, TX | 505.2 GWh |
#61 | Techren Solar II LLC | Boulder, NV | 507.0 GWh |
#62 | Yellowbud Solar, LLC | Williamsport, OH | 501.3 GWh |
#63 | Galloway 1 Solar Farm | Paint Rock, TX | 495.7 GWh |
#64 | Centinela Solar Energy | Calexico, CA | 491.6 GWh |
#65 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 490.0 GWh |
#66 | Taygete II Energy Project | Coyanosa, TX | 488.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eiffel Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Broken Bow Dam | Broken Bow, OK | 171.5 GWh | 61 mi |
Butterfield Solar Farm | Durant, OK | 10.7 GWh | 58.1 mi |
Chisum | Blossom, TX | 21.9 GWh | 8.1 mi |
Choctaw Nation Solar Farm | Calera, OK | 9.7 GWh | 58.1 mi |
Coniglio Solar | Wolfe City, TX | 197.8 GWh | 34.8 mi |
G.S.E. One LLC | Bonham, TX | 164.3 GWh | 36.4 mi |
Hopkins Energy LLC | Dike, TX | 180.3 GWh | 26.6 mi |
Hugo | Fort Towson, OK | 1.2 TWh | 31.1 mi |
Impact Solar 1 | Deport, TX | 353.3 GWh | 12.7 mi |
International Paper Valliant OK | Valliant, OK | 450.2 GWh | 36.3 mi |
Lamar Power Project | Paris, TX | 5.7 TWh | 4.3 mi |
Leon Solar | Greenville, TX | 20.8 GWh | 51.1 mi |
Mockingbird Solar Center | Brookston, TX | 80.1 GWh | 15.4 mi |
Paris Energy Center | Paris, TX | 858.7 GWh | 7 mi |
Powerlane Plant | Greenville, TX | 62.4 GWh | 45.6 mi |
Samson Solar Energy | Cunningham, TX | 395.2 GWh | 30.7 mi |
Samson Solar Energy III LLC | Cunningham, TX | 280.3 GWh | 15.3 mi |
Sterling Solar (TX) | Greenville, TX | 16.7 GWh | 47.9 mi |
Welsh | Pittsburg, TX | 3.9 TWh | 54.6 mi |
Whitewright Solar | Whitewright, TX | 20.2 GWh | 49.7 mi |