Eielson AFB Central Heat & Power Plant
2676 Industrail Ave, Eielson AFB, AK 99702Plant Summary Information
Eielson AFB Central Heat & Power Plant is ranked #15 out of 129 power plants in Alaska in terms of total annual net electricity generation.
Eielson AFB Central Heat & Power Plant is comprised of 7 generators and generated 25.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Eielson AFB Central Heat & Power Plant |
---|---|
Utility Name | U S Air Force-Eielson AFB |
Location | Fairbanks North Star Borough, AK |
Initial Operation Date | October 1952 |
Last Update | Dec 2022 |
Annual Generation | 81.8 GWh |
Annual Consumption | 3.3 M MMBtu |
Ranked #3,321 out of 11,249 Power Plants Nationwide | |
Ranked #116 out of 134 Subbituminous Coal Power Plants Nationwide | |
Ranked #15 out of 129 Alaska Power Plants | |
Ranked #2 out of 4 Alaska Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 99.7% |
Map of Eielson AFB Central Heat & Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eielson AFB Central Heat & Power Plant.
Monthly Net Generation for Eielson AFB Central Heat & Power Plant
Eielson AFB Central Heat & Power Plant Details
Summary Information | |
---|---|
Plant Name | Eielson AFB Central Heat & Power Plant (50392) |
Plant Address | 2676 Industrail Ave Eielson AFB, AK 99702 |
Utility | U S Air Force-Eielson AFB (22199) |
Latitude, Longitude | 64.67141, -147.07599 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | October 1952 |
Annual Generation | 81.8 GWh |
Fuel Types | Subbituminous Coal : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | |
Balancing Authority | () |
NAICS Code | National Security and International Affairs (928) |
Sector | Commercial CHP (5) |
Water Source | Cooling Pond / 3 Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Golden Valley Elec Assn Inc (7353) AK |
Grid Voltage | 7.20 kV |
Energy Storage | No |
Generator TG3 Details Operating August 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1955 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Subbituminous Coal |
Startup Source | Subbituminous Coal |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG4 Details Operating June 1969
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1969 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Subbituminous Coal |
Startup Source | Subbituminous Coal |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG5 Details Operating October 1987
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 9 MW |
Winter Capacity | 9.5 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1987 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Subbituminous Coal |
Startup Source | Subbituminous Coal |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DG01 Details Standby November 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | November 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DG02 Details Standby November 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | November 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DG03 Details Standby November 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | November 1998 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DG04 Details Standby November 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | November 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Eielson AFB Central Heat & Power Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#106 | Archer Daniels Midland Decatur | Decatur, IL | 891.6 GWh |
#107 | Clifty Creek | Madison, IN | 5.6 TWh |
#108 | Apache Station | Cochise, AZ | 2.1 TWh |
#109 | Archer Daniels Midland Columbus | Columbus, NE | 320.6 GWh |
#110 | Genesis Alkali | Green River, WY | 300.2 GWh |
#111 | Aurora Energy LLC Chena | Fairbanks, AK | 162.4 GWh |
#112 | Dan E Karn | Essexville, MI | 199.9 GWh |
#113 | Intermountain Power Project | Delta, UT | 4.3 TWh |
#114 | Biron Mill | Wisconsin Rapids, WI | 216.8 GWh |
#115 | American Crystal Sugar Hillsboro | Hillsboro, ND | 102.3 GWh |
#117 | University of Alaska Fairbanks | Fairbanks, AK | 76.7 GWh |
#118 | Utility Plants Section | Fort Wainwright, AK | 72.9 GWh |
#119 | Prairie Creek | Cedar Rapids, IA | 81.5 GWh |
#120 | American Crystal Sugar Drayton | Drayton, ND | 56.3 GWh |
#121 | Meramec | St. Louis, MO | 177.3 GWh |
#122 | American Crystal Sugar Crookston | Crookston, MN | 40.6 GWh |
#123 | American Crystal Sugar Moorhead | Moorhead, MN | 37.5 GWh |
#124 | Archer Daniels Midland Lincoln | Lincoln, NE | 32.9 GWh |
#125 | American Crystal Sugar East Grand Forks | East Grand Forks, MN | 31.0 GWh |
#126 | Georgia-Pacific Muskogee | Muskogee, OK | 408.8 GWh |
Nearby Power Plants
Below are closest 11 power plants surrounding Eielson AFB Central Heat & Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aurora Energy LLC Chena | Fairbanks, AK | 162.4 GWh | 22.9 mi |
Delta Power | Delta Junction, AK | 1.3 MWh | 60.2 mi |
Delta Wind Farm | Delta Junction, AK | 4.3 GWh | 63.4 mi |
Eva Creek Wind | Healy, AK | 53.9 GWh | 69 mi |
Fairbanks | Fairbanks, AK | 9.2 GWh | 22.8 mi |
Fort Greely Power Plant | Delta Jct, AK | 100.9 MWh | 63.1 mi |
Gwitchyaa Zhee | Fort Yukon, AK | 3.4 GWh | 140.9 mi |
Healy | Healy, AK | 439.7 GWh | 79.7 mi |
North Pole | North Pole, AK | 488.1 GWh | 9.2 mi |
University of Alaska Fairbanks | Fairbanks, AK | 76.7 GWh | 25.3 mi |
Utility Plants Section | Fort Wainwright, AK | 72.9 GWh | 20 mi |