EGP Stillwater Solar PV II, LLC
4637 Lawrence Lane, Fallon, NV 89406Plant Summary Information
EGP Stillwater Solar PV II, LLC is ranked #42 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
EGP Stillwater Solar PV II, LLC generated 7.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | EGP Stillwater Solar PV II, LLC |
---|---|
Utility Name | EGP Stillwater Solar PV II, LLC |
Location | Churchill County, NV |
Initial Operation Date | June 2018 |
Last Update | Dec 2023 |
Annual Generation | 32.4 GWh |
Annual Consumption | 114.1 k MMBtu |
Ranked #4,442 out of 11,835 Power Plants Nationwide | |
Ranked #967 out of 5,643 Solar Power Plants Nationwide | |
Ranked #84 out of 109 Nevada Power Plants | |
Ranked #42 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of EGP Stillwater Solar PV II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for EGP Stillwater Solar PV II, LLC.
Monthly Net Generation for EGP Stillwater Solar PV II, LLC
EGP Stillwater Solar PV II, LLC Details
Summary Information | |
---|---|
Plant Name | EGP Stillwater Solar PV II, LLC (61809) |
Plant Address | 4637 Lawrence Lane, Fallon, NV 89406 |
Utility | EGP Stillwater Solar PV II, LLC (61435) |
Latitude, Longitude | 39.54204, -118.56015 |
Generation Dates on File | Jun 2018 to Dec 2023 |
Initial Operation Date | June 2018 |
Annual Generation | 32.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
Grid Voltage | 60.00 kV |
Energy Storage | No |
Generator STWII Details Operating June 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 24 MW |
Thin Film A Si | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
EGP Stillwater Solar PV II, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Enel Green Power NA, Inc. | 100 Brickstone Square, Suite 300, Andover, MA 1810 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#957 | Badger 1 | Tonopah, AZ | 33.2 GWh |
#958 | NY8 - Branscomb Solar | Schaghticoke, NY | 33.2 GWh |
#959 | Otter Creek Solar | Chase City, VA | 33.1 GWh |
#960 | Mt. Jackson Solar | Mt. Jackson, VA | 32.9 GWh |
#961 | Imperial Valley Solar Company 1 LLC | Niland, CA | 32.9 GWh |
#962 | Sunflower Solar | Halifax, NC | 32.9 GWh |
#963 | SEPV 8 | Twentynine Palms, CA | 32.8 GWh |
#964 | Luke Solar | Glendale, AZ | 32.8 GWh |
#965 | NVSS-II | Pahrump, NV | 32.7 GWh |
#966 | Sunray 3 | Daggett, CA | 32.6 GWh |
#968 | St. Joseph Solar | Granger, IN | 32.4 GWh |
#969 | Whitetail Solar 3 | Chambersburg, PA | 32.3 GWh |
#970 | Watson Seed Farm PV1 | Whitakers, NC | 32.2 GWh |
#971 | Cement City Solar, LLC | Cement City, MI | 32.1 GWh |
#972 | Buckingham Solar LLC | Cumberland, VA | 31.9 GWh |
#973 | Remington Solar Facility | Remington, VA | 31.9 GWh |
#974 | Glover Creek Solar, LLC | Summer Shade, KY | 31.8 GWh |
#975 | RE Bagdad Solar I LLC | Bagdad, AZ | 31.7 GWh |
#976 | Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 31.5 GWh |
#977 | NY8 - Puckett Solar | Chenango Forks, NY | 31.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding EGP Stillwater Solar PV II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brady | Fallon, NV | 95.0 GWh | 29.7 mi |
Desert Peak Power Plant | Fernley, NV | 91.9 GWh | 25.5 mi |
Dixie Valley | Fallon, NV | 415.9 GWh | 47.5 mi |
Don A Campbell 1 Geothermal | Gabbs, NV | 118.8 GWh | 50.4 mi |
Don A Campbell 2 Geothermal | Luning, NV | 99.5 GWh | 50.4 mi |
ENEL Salt Wells LLC | Fallon, NV | 73.2 GWh | 17.1 mi |
Fort Churchill | Yerington, NV | 508.0 GWh | 41.9 mi |
Ft. Churchill PV | Yerington, NV | 23.7 GWh | 42.2 mi |
Lahontan | Fallon, NV | 8.4 GWh | 27.6 mi |
New Lahontan | Fallon, NV | 17.2 GWh | 27.5 mi |
Patua Acquisition Project, LLC | Hazen, NV | 137.1 GWh | 27.5 mi |
Soda Lake 3 | Fallon, NV | 108.4 GWh | 15.5 mi |
Stillwater Facility | Fallon, NV | 123.7 GWh | 0.5 mi |
Tesla Reno GigaFactory | Sparks, NV | 11.1 GWh | 46.8 mi |
Tracy | Sparks, NV | 4.0 TWh | 51.4 mi |
Tungsten Mountain | Fallon, NV | 347.9 GWh | 46.9 mi |
Turquoise Liberty Solar | Sparks, NV | 14.8 GWh | 51.2 mi |
Turquoise Nevada, LLC | Sparks, NV | 106.3 GWh | 51.4 mi |
Western 102 Power Plant | McCarran, NV | 491.8 GWh | 50.7 mi |
Whitegrass No. 1 | Yerington, NV | 17.7 GWh | 42.2 mi |