8200 O B Holt rd, Goldsmith, TX 79741Plant Summary Information
Ector County Energy Center is ranked #103 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Ector County Energy Center is comprised of 2 generators and generated 92.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ector County Energy Center |
---|---|
Utility Name | Ector County Generation, LLC |
Location | Ector County, TX |
Initial Operation Date | August 2015 |
Last Update | Dec 2023 |
Annual Generation | 425.6 GWh |
Annual Consumption | 4.8 M MMBtu |
Ranked #1,438 out of 11,835 Power Plants Nationwide | |
Ranked #582 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #270 out of 749 Texas Power Plants | |
Ranked #103 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Invenergy Services LLC (2013 to 2021) Ector County Generation, LLC (2022 to 2023) |
Map of Ector County Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ector County Energy Center.
Monthly Net Generation for Ector County Energy Center
Ector County Energy Center Details
Summary Information | |
---|---|
Plant Name | Ector County Energy Center (58471) |
Plant Address | 8200 O B Holt rd, Goldsmith, TX 79741 |
Utility | Ector County Generation, LLC (65431) |
Latitude, Longitude | 32.06917, -102.58556 |
Generation Dates on File | Aug 2015 to Dec 2023 |
Initial Operation Date | August 2015 |
Annual Generation | 425.6 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ONEOK WES TEX TRANSMISSION LLC |
Natural Gas Storage | No |
Generator CTG1 Details Operating August 2015
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | RN_ECEC_HOLT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Oncor HOLT 138KV SUBSTATION |
Nameplate Capacity | 179.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 168 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2015 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 20 MW |
Planned Uprate | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating August 2015
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 179.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 168 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 20 MW |
Planned Uprate | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ector County Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#572 | Dave Gates Generating Station | Anaconda, MT | 483.4 GWh |
#573 | Knox Lee | Longview, TX | 476.6 GWh |
#574 | Lawrence Energy Center | Lawrence, KS | 1.6 TWh |
#575 | Pensacola Florida Plant | Cantonment, FL | 461.9 GWh |
#576 | R W Miller | Palo Pinto, TX | 472.8 GWh |
#577 | Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 454.0 GWh |
#578 | Mansfield Mill | Mansfield, LA | 844.8 GWh |
#579 | Whitehorn | Blaine, WA | 449.0 GWh |
#580 | Cheyenne Prairie Generating Station | Cheyenne, WY | 431.8 GWh |
#581 | Port Jefferson | Port Jefferson, NY | 446.7 GWh |
#583 | Roseville Energy Park | Roseville, CA | 425.3 GWh |
#584 | Sewell Creek Energy | Cedartown, GA | 425.2 GWh |
#585 | Geismar | Geismar, LA | 584.4 GWh |
#586 | HO Clarke Generating | Houston, TX | 421.8 GWh |
#587 | Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 421.0 GWh |
#588 | Nikiski Combined Cycle | Nikiski, AK | 416.8 GWh |
#589 | Gordon Evans Energy Center | Colwich, KS | 423.9 GWh |
#590 | Victoria Texas Plant | Victoria, TX | 411.2 GWh |
#591 | Richard M Flynn | Holtsville, NY | 429.5 GWh |
#592 | Las Vegas Generating Station | North Las Vegas, NV | 410.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ector County Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 902.8 GWh | 4.7 mi |
Bakke | Andrews, TX | 877.0 MWh | 15.9 mi |
Frankel | Andrews, TX | 645.0 MWh | 24.5 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 7.1 mi |
Jumbo Hill Wind Project | Andrews, TX | 588.6 GWh | 30.5 mi |
Lapetus | Andrews, TX | 184.7 GWh | 27.5 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 13.6 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 227.1 GWh | 15.1 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 26.2 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 26.8 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh | 21.9 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 5.5 mi |
Phoebe Solar | Kermit, TX | 518.7 GWh | 22.8 mi |
Prospero Solar | Andrews, TX | 746.0 GWh | 21.2 mi |
Prospero Solar II | Andrews, TX | 675.9 GWh | 20.8 mi |
Quail Run Energy Center | Odessa, TX | 2.3 TWh | 22.3 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 32.6 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 35.8 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 19.6 mi |
Westover | Odessa, TX | 709.0 MWh | 18.1 mi |