Eastern Landfill Gas LLC
Days Cove Road, White Marsh, MD 21162Plant Summary Information
Eastern Landfill Gas LLC is ranked #30 out of 179 power plants in Maryland in terms of total annual net electricity generation.
Eastern Landfill Gas LLC is comprised of 4 generators and generated 6.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Eastern Landfill Gas LLC |
---|---|
Utility Name | Energy Power Partners |
Location | Baltimore County, MD |
Initial Operation Date | October 2006 |
Last Update | Dec 2023 |
Annual Generation | 25.1 GWh |
Annual Consumption | 352.9 k MMBtu |
Ranked #4,789 out of 11,852 Power Plants Nationwide | |
Ranked #121 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #30 out of 179 Maryland Power Plants | |
Ranked #1 out of 4 Maryland Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operator |
Eastern Landfill Gas LLC (2013 to 2018) Energy Power Partners (2019 to 2023) |
Map of Eastern Landfill Gas LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eastern Landfill Gas LLC.
Monthly Net Generation for Eastern Landfill Gas LLC
Eastern Landfill Gas LLC Details
Summary Information | |
---|---|
Plant Name | Eastern Landfill Gas LLC (56571) |
Plant Address | Days Cove Road, White Marsh, MD 21162 |
Utility | Energy Power Partners (62884) |
Latitude, Longitude | 39.38973, -76.39201 |
Generation Dates on File | Oct 2006 to Dec 2023 |
Initial Operation Date | October 2006 |
Annual Generation | 25.1 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 05-1054-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Baltimore Gas & Electric Co (1167) MD |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating October 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 5021702 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021702 |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2006 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating October 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 5021702 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021702 |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2006 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating October 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 5021702 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021702 |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2006 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating June 2022
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 5021702 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021702 |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Eastern Landfill Gas LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Energy Power Investment Company | 1605 N Cedar Crest Blvd, Suite 509, Allentown, PA 18104 | Generator 1 | 100.00% |
Energy Power Investment Company | 1605 N Cedar Crest Blvd, Suite 509, Allentown, PA 18104 | Generator 2 | 100.00% |
Energy Power Investment Company | 1605 N Cedar Crest Blvd, Suite 509, Allentown, PA 18104 | Generator 3 | 100.00% |
Energy Power Investment Company | 1605 N Cedar Crest Blvd, Suite 509, Allentown, PA 18104 | Generator 4 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#111 | Nanticoke LFG | Binghamton, NY | 26.1 GWh |
#112 | Greene Valley Gas Recovery | Naperville, IL | 26.1 GWh |
#113 | Apple Campus 2 Fuel Cell | Cupertino, CA | 25.9 GWh |
#114 | Salem Energy Systems LLC | Winston-Salem, NC | 25.9 GWh |
#115 | Mountain View | Greencastle, PA | 27.0 GWh |
#116 | Earthmovers LFGTE | Elkhart, IN | 25.5 GWh |
#117 | Archbald Power Station | Archbald, PA | 114.0 GWh |
#118 | Iredell County LFG Facility | Statesville, NC | 25.2 GWh |
#119 | Trail Ridge Landfill Gas Recovery | Baldwin, FL | 25.2 GWh |
#120 | G2 Energy Ostrom Road LLC | Wheatland, CA | 25.2 GWh |
#122 | Settlers Hill Gas Recovery | Batavia, IL | 24.9 GWh |
#123 | Salt Lake Energy Systems | Salt Lake City, UT | 24.8 GWh |
#124 | Blue Water Renewables Inc | Kimball Township, MI | 24.6 GWh |
#125 | Waste Management Naples LFGTE Project | Naples, FL | 24.5 GWh |
#126 | Farmers Branch Renewable Energy Facility | Lewisville, TX | 24.1 GWh |
#127 | Bryon Center | Byron Center, MI | 24.0 GWh |
#128 | Hidden Hollow Energy | Boise, ID | 24.0 GWh |
#129 | Waste Management Lockwood LFGTE | Sparks, NV | 23.7 GWh |
#130 | Ameresco Delaware Central | Sandtown, DE | 23.5 GWh |
#131 | Sycamore Energy LLC | Santee, CA | 23.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eastern Landfill Gas LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
APG Combined Heat and Power Plant | Edgewood, MD | 49.7 GWh | 5 mi |
Archdiocese of Baltimore J | Perryman, MD | 3.4 GWh | 10.1 mi |
Archdiocese of Baltimore L | Perryman, MD | 3.4 GWh | 10.1 mi |
Back River Waste Water Treatment | Baltimore, MD | 983.0 MWh | 8.3 mi |
Baltimore City B | Perryman, MD | 3.1 GWh | 9.7 mi |
Baltimore City D | Perryman, MD | 3.1 GWh | 9.7 mi |
Baltimore City F | Perryman, MD | 3.1 GWh | 9.7 mi |
Baltimore City G | Perryman, MD | 3.0 GWh | 9.7 mi |
BTC2 Solar (CSG) | Kingsville, MD | 3.8 GWh | 2 mi |
City of Havre De Grace C | Perryman, MD | 3.4 GWh | 9.7 mi |
Havre de Grace II - E at Perryman | Perryman, MD | 2.0 GWh | 9.7 mi |
Macy's MD Joppa Solar Project | Joppa, MD | 221.0 MWh | 5.5 mi |
McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.4 GWh | 10.8 mi |
Perryman | Harford County, MD | 196.0 GWh | 9.8 mi |
Pfeffers | Kingsville, MD | 1.9 GWh | 2.6 mi |
Philadelphia | Baltimore, MD | 1.8 GWh | 11.1 mi |
Presbyterian Senior Living Service | Glen Arm, MD | 744.6 MWh | 7.7 mi |
Sod Run WTP A | Perryman, MD | 3.4 GWh | 9.7 mi |
White Marsh Mall | Baltimore, MD | 689.0 MWh | 4.2 mi |
White Marsh Solar | White Marsh, MD | 2.7 GWh | 2 mi |