East Pecos Solar
7220 Nevill Road, McCamey, TX 75792Plant Summary Information
East Pecos Solar is ranked #62 out of 161 solar farms in Texas in terms of total annual net electricity generation.
East Pecos Solar generated 80.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | East Pecos Solar |
---|---|
Utility Name | Southern Power Co |
Location | Pecos County, TX |
Initial Operation Date | April 2017 |
Last Update | Aug 2024 |
Annual Generation | 259.2 GWh |
Annual Consumption | 979.9 k MMBtu |
Ranked #1,997 out of 11,835 Power Plants Nationwide | |
Ranked #199 out of 5,643 Solar Power Plants Nationwide | |
Ranked #363 out of 749 Texas Power Plants | |
Ranked #62 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of East Pecos Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Pecos Solar.
Monthly Net Generation for East Pecos Solar
East Pecos Solar Details
Summary Information | |
---|---|
Plant Name | East Pecos Solar (60436) |
Plant Address | 7220 Nevill Road, McCamey, TX 75792 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 31.00088, -102.28174 |
Generation Dates on File | Mar 2017 to Aug 2024 |
Initial Operation Date | April 2017 |
Annual Generation | 259.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG16-127-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 118.5 MW |
Summer Capacity | 118.5 MW |
Winter Capacity | 118.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 142.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
East Pecos Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
East Pecos Solar, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#189 | Hunter Solar LLC (UT) | Clawson, UT | 268.9 GWh |
#190 | Boulder Solar Power, LLC | Boulder City, NV | 268.2 GWh |
#191 | Jackpot Solar, LLC | Twin Falls, ID | 267.1 GWh |
#192 | Bluebell Solar II | Sterling, TX | 267.0 GWh |
#193 | West Line Solar, LLC | City of Eloy, AZ | 266.5 GWh |
#194 | San Pablo Raceway | Lancaster, CA | 266.3 GWh |
#195 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#196 | Ivanpah 3 | Nipton, CA | 270.0 GWh |
#197 | Wood County | Nekoosa, WI | 261.0 GWh |
#198 | Milford Solar 1 | Milford, UT | 260.4 GWh |
#200 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.6 GWh |
#201 | Bellflower Solar 1 | Lewisville, IN | 258.9 GWh |
#202 | Ivanpah 2 | Nipton, CA | 268.3 GWh |
#203 | Saint Solar | Coolidge, AZ | 256.6 GWh |
#204 | Central Line Solar, LLC | Coolidge, AZ | 256.3 GWh |
#205 | Nebula Solar | La Feria, TX | 255.7 GWh |
#206 | Fish Springs | Reno, NV | 251.6 GWh |
#207 | Sunshine Valley Solar | Armagosa, NV | 253.6 GWh |
#208 | Elara Solar | Pearsall, TX | 252.4 GWh |
#209 | Storey Solar and Storage | Coolidge, AZ | 242.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Pecos Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.9 GWh | 0.8 mi |
Appaloosa Run Wind | Rankin, TX | 708.3 GWh | 28.7 mi |
Buckthorn Westex | Ft. Stockton, TX | 377.4 GWh | 33.5 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 17.6 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 17.6 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 12.9 mi |
Emerald Grove | Crane, TX | 281.6 GWh | 7.9 mi |
Greasewood Solar | Fort Stockton, TX | 165.2 GWh | 12.4 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh | 26.5 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh | 14.6 mi |
Midway Solar - TX | Fort Stockton, TX | 302.3 GWh | 3.5 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 6.8 mi |
Pearl Solar | Fort Stockton, TX | 99.6 GWh | 1.2 mi |
RE Maplewood | McCamey, TX | 491.6 GWh | 2.2 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 990.1 GWh | 16 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 16.7 mi |
WAL897 | Fort Stockton, TX | 174.0 MWh | 37.8 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 8.6 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 8.6 mi |