East Line Solar
TBD, Coolidge, AZ 85131Plant Summary Information
East Line Solar is ranked #48 out of 159 power plants in Arizona in terms of total annual net electricity generation.
East Line Solar generated 44.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | East Line Solar |
---|---|
Utility Name | AES Distributed Energy |
Location | Pinal County, AZ |
Initial Operation Date | December 2020 |
Last Update | Dec 2024 |
Annual Generation | 239.1 GWh |
Annual Consumption | 858.9 k MMBtu |
Ranked #2,124 out of 11,949 Power Plants Nationwide | |
Ranked #238 out of 5,739 Solar Power Plants Nationwide | |
Ranked #48 out of 159 Arizona Power Plants | |
Ranked #18 out of 106 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
East Line Solar, LLC (2018 to 2019) AES Distributed Energy (2020 to 2023) |
Map of East Line Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Line Solar.
Monthly Net Generation for East Line Solar
East Line Solar Details
Summary Information | |
---|---|
Plant Name | East Line Solar (62899) |
Plant Address | TBD, Coolidge, AZ 85131 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 32.84703, -111.56507 |
Generation Dates on File | Jan 2021 to Dec 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 239.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator EASTL Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 121.4 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
East Line Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#228 | Playa Solar 2 | North Las Vegas, NV | 246.9 GWh |
#229 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 246.7 GWh |
#230 | Antelope Expansion 2 | Lancaster, CA | 246.1 GWh |
#231 | Wilmot Energy Center LLC | Tucson, AZ | 243.1 GWh |
#232 | Resurgence Solar | Boron, CA | 233.0 GWh |
#233 | Elara Solar | Pearsall, TX | 244.0 GWh |
#234 | Comanche Solar | Pueblo, CO | 242.5 GWh |
#235 | South Cheyenne Solar | South Greeley, WY | 242.3 GWh |
#236 | Yellow Pine II | Enterprise, NV | 233.6 GWh |
#237 | SR Snipesville II | Denton, GA | 239.7 GWh |
#239 | SR Snipesville III | Denton, GA | 238.0 GWh |
#240 | Alamo 6 | Fort Stockton, TX | 237.9 GWh |
#241 | Maverick Solar 4, LLC | Desert Center, CA | 237.5 GWh |
#242 | Oak Trail Solar, LLC | Moyock, NC | 237.4 GWh |
#243 | Willow Spring Solar, LLC | Rosamond, CA | 236.9 GWh |
#244 | SR Clay, LLC | Fort Gaines, GA | 235.3 GWh |
#245 | Orion III Solar Project | Buckholts, TX | 234.8 GWh |
#246 | Henrietta Solar Project | Lemoore, CA | 234.2 GWh |
#247 | West of the Pecos Solar | TBD, TX | 234.2 GWh |
#248 | Prairie State Solar Project | Swanwick Township, IL | 234.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Line Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bonnybrooke PV | Florence, AZ | 118.7 GWh | 19.3 mi |
Brittlebush Solar | Coolidge, AZ | 68.0 GWh | 7 mi |
Central Line Solar, LLC | Coolidge, AZ | 266.5 GWh | 0.9 mi |
Coolidge Generation Station | Coolidge, AZ | 197.3 GWh | 6 mi |
Desert Basin | Casa Grande, AZ | 2.7 TWh | 13.6 mi |
Eleven Mile Solar Center | Coolidge, AZ | 386.5 GWh | 1.8 mi |
Intel - Ocotillo Campus Solar | Chandler, AZ | 10.7 GWh | 33.3 mi |
Pinal Central Energy Center Hybrid | Casa Grande, AZ | 51.2 GWh | 2.1 mi |
Poseidon Solar, LLC | Globe, AZ | 51.4 GWh | 22.2 mi |
Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh | 29.2 mi |
Red Rock | Red Rock, AZ | 86.8 GWh | 26 mi |
Saguaro | Red Rock, AZ | 175.6 GWh | 25.6 mi |
Saint Solar | Coolidge, AZ | 268.3 GWh | 3.9 mi |
Sandstone Solar | Florence, AZ | 111.1 GWh | 15.2 mi |
Storey Solar and Storage | Coolidge, AZ | 293.0 GWh | 4.8 mi |
Sundance | Casa Grande, AZ | 384.0 GWh | 5.8 mi |
Union HS at Casa Grande | Casa Grande, AZ | 2.6 GWh | 11.8 mi |
Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.7 GWh | 9.1 mi |
Walmart Casa Grande | Casa Grande, AZ | 1.8 GWh | 12.1 mi |
West Line Solar, LLC | City of Eloy, AZ | 273.6 GWh | 6.3 mi |