East Blackland Solar Project 1
17414 Manda Carlson Rd, Manor, TX 78653Plant Summary Information
East Blackland Solar Project 1 is ranked #59 out of 166 solar farms in Texas in terms of total annual net electricity generation.
East Blackland Solar Project 1 generated 88.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | East Blackland Solar Project 1 |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Travis County, TX |
Initial Operation Date | July 2021 |
Last Update | Sep 2024 |
Annual Generation | 277.6 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,919 out of 11,852 Power Plants Nationwide | |
Ranked #186 out of 5,655 Solar Power Plants Nationwide | |
Ranked #351 out of 754 Texas Power Plants | |
Ranked #59 out of 166 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
RRE Austin Solar LLC (2013 to 2017) East Blackland Solar Project 1 LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of East Blackland Solar Project 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Blackland Solar Project 1.
Monthly Net Generation for East Blackland Solar Project 1
East Blackland Solar Project 1 Details
Summary Information | |
---|---|
Plant Name | East Blackland Solar Project 1 (57659) |
Plant Address | 17414 Manda Carlson Rd, Manor, TX 78653 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 30.4214, -97.4614 |
Generation Dates on File | Aug 2021 to Sep 2024 |
Initial Operation Date | July 2021 |
Annual Generation | 277.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator PSF Details Operating July 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 144 MW |
Summer Capacity | 144 MW |
Winter Capacity | 144 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 186 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
East Blackland Solar Project 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#176 | Upton County Solar | McCamey, TX | 285.5 GWh |
#177 | Elm Branch Solar 1 | Bardwell, TX | 285.2 GWh |
#178 | Valentine Solar, LLC | Rosamond, CA | 283.2 GWh |
#179 | Mesquite Solar 2, LLC | Tonopah, AZ | 282.9 GWh |
#180 | Samson Solar Energy III LLC | Cunningham, TX | 280.3 GWh |
#181 | BPL Files Solar | Itasca, TX | 280.1 GWh |
#182 | Colonial Trail West | Spring Grove, VA | 279.9 GWh |
#183 | Storey Solar and Storage | Coolidge, AZ | 268.9 GWh |
#184 | Battle Mountain Solar Project | Battle Mountain, NV | 276.4 GWh |
#185 | Emerald Grove | Crane, TX | 278.1 GWh |
#187 | Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh |
#188 | Wood County | Nekoosa, WI | 271.6 GWh |
#189 | Boulder Solar Power, LLC | Boulder City, NV | 271.6 GWh |
#190 | Oberon IA | Odessa, TX | 271.4 GWh |
#191 | Hunter Solar LLC (UT) | Clawson, UT | 270.1 GWh |
#192 | Maverick Solar 6, LLC | Desert Center, CA | 265.8 GWh |
#193 | Ivanpah 3 | Nipton, CA | 278.0 GWh |
#194 | West Line Solar, LLC | City of Eloy, AZ | 268.1 GWh |
#195 | Rancho Seco Solar II, LLC | Twin Cities, CA | 266.9 GWh |
#196 | San Pablo Raceway | Lancaster, CA | 264.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Blackland Solar Project 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Austin | Austin, TX | 4.7 GWh | 21.2 mi |
Austin Gas Recovery | Austin, TX | 37.9 GWh | 11.3 mi |
Bastrop Energy Center | Cedar Creek, TX | 2.9 TWh | 19.8 mi |
Decker Creek | Austin, TX | 112.4 GWh | 12.2 mi |
Five Wells Solar Center - Hybrid | Rogers, TX | 603.3 GWh | 41.7 mi |
Hal C Weaver Power Plant | Austin, TX | 354.4 GWh | 18.8 mi |
HEB00182 | Temple, TX | 298.0 MWh | 45.3 mi |
HEB00591 | Round Rock, TX | 425.0 MWh | 13.5 mi |
IKEA Round Rock 027 | Round Rock, TX | 1.6 GWh | 16.5 mi |
Lost Pines 1 Power Project | Bastrop, TX | 3.2 TWh | 22 mi |
Marshall Ford | Austin, TX | 25.7 GWh | 26.7 mi |
Orion III Solar Project | Buckholts, TX | 118.0 GWh | 42.3 mi |
Panda Temple Power Station | Temple, TX | 7.1 TWh | 44.7 mi |
PowerFin Kingsbery | Austin, TX | 3.5 GWh | 17.1 mi |
Robert Mueller Energy Center | Austin, TX | 22.7 GWh | 16.7 mi |
Sand Hill | Austin, TX | 2.0 TWh | 17.2 mi |
Sim Gideon | Bastrop, TX | 1.2 TWh | 22.2 mi |
WAL5480 | Round Rock, TX | 334.0 MWh | 11.9 mi |
Webberville Solar Project | Manor, TX | 56.4 GWh | 13 mi |
Winchester Power Park | Winchester, TX | 86.2 GWh | 39.1 mi |