East Bend
6293 Beaver Rd, Union, KY 41091Plant Summary Information
East Bend is ranked #42 out of 127 coal plants nationwide in terms of total annual net electricity generation.
East Bend is comprised of 1 generator and generated 710.8 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | East Bend |
---|---|
Utility Name | Duke Energy Kentucky Inc |
Location | Boone County, KY |
Initial Operation Date | March 1981 |
Last Update | Jan 2025 |
Annual Generation | 2.4 TWh |
Annual Consumption | 29.4 M MMBtu |
Ranked #461 out of 11,979 Power Plants Nationwide | |
Ranked #42 out of 127 Bituminous Coal Power Plants Nationwide | |
Ranked #9 out of 56 Kentucky Power Plants | |
Ranked #6 out of 8 Kentucky Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 99.5% |
Map of East Bend
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Bend.
Monthly Net Generation for East Bend
East Bend Details
Summary Information | |
---|---|
Plant Name | East Bend (6018) |
Plant Address | 6293 Beaver Rd, Union, KY 41091 |
Utility | Duke Energy Kentucky Inc (55729) |
Latitude, Longitude | 38.9036, -84.8514 |
Generation Dates on File | Jan 2001 to Jan 2025 |
Initial Operation Date | March 1981 |
Annual Generation | 2.4 TWh |
Fuel Types | Bituminous Coal : 99.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Ohio River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 2 Details Operating March 1981
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 772 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 600 MW |
Winter Capacity | 600 MW |
Minimum Load | 340 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1981 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
East Bend Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#32 | Keystone | Shelocta, PA | 3.3 TWh |
#33 | Bonanza | Vernal, UT | 3.3 TWh |
#34 | AES Petersburg | Petersburg, IN | 3.1 TWh |
#35 | W H Sammis | Stratton, OH | 3.1 TWh |
#36 | Huntington | Huntington, UT | 2.8 TWh |
#37 | James E. Rogers Energy Complex | Cliffside, NC | 4.5 TWh |
#38 | D B Wilson | Centertown, KY | 2.5 TWh |
#39 | Belews Creek | Belews Creek, NC | 9.6 TWh |
#40 | Brandon Shores | Baltimore, MD | 2.4 TWh |
#41 | Stanton Energy Center | Orlando, FL | 4.1 TWh |
#43 | Wateree | Eastover, SC | 2.3 TWh |
#44 | Seminole (FL) | Palatka, FL | 10.5 TWh |
#45 | Monroe (MI) | Monroe, MI | 13.5 TWh |
#46 | Hayden | Hayden, CO | 2.0 TWh |
#47 | E C Gaston | Wilsonville, AL | 3.6 TWh |
#48 | Williams | Goose Creek, SC | 2.0 TWh |
#49 | F B Culley | Newburgh, IN | 1.8 TWh |
#50 | R M Schahfer | Wheatfield, IN | 1.7 TWh |
#51 | Elm Road Generating Station | Oak Creek, WI | 7.9 TWh |
#52 | E W Brown | Harrodsburg, KY | 1.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Bend.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 13.6 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 10.9 mi |
Central Utility Plant Cincinnati | Cincinnati, OH | 231.5 GWh | 24.3 mi |
Clifty Creek | Madison, IN | 5.2 TWh | 32.7 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 16.6 mi |
East Campus Utility Plant | Cincinnati, OH | 143.1 MWh | 24.7 mi |
Ghent | Ghent, KY | 10.8 TWh | 14.5 mi |
Hamilton (OH) | Hamilton, OH | 776.0 MWh | 38.4 mi |
Hamilton Peaking | Hamilton, OH | 1.5 GWh | 35.8 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 14.3 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.5 TWh | 13 mi |
Markland | Florence, IN | 394.7 GWh | 10.5 mi |
Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh | 37.3 mi |
Miami Fort | North Bend, OH | 5.6 TWh | 14.7 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 24.6 mi |
Pendleton County LFGTE | Butler, KY | 23.1 GWh | 26.7 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 9.4 GWh | 26.4 mi |
Trimble County | Bedford, KY | 9.1 TWh | 37.4 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 14.4 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 14.4 mi |