Durrance
7180 FL-37, Mulberry, FL 33860Plant Summary Information
Durrance is ranked #99 out of 171 solar farms in Florida in terms of total annual net electricity generation.
Durrance generated 30.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Durrance |
---|---|
Utility Name | Tampa Electric Co |
Location | Polk County, FL |
Initial Operation Date | January 2021 |
Last Update | Aug 2024 |
Annual Generation | 109.1 GWh |
Annual Consumption | 405.5 k MMBtu |
Ranked #3,077 out of 11,835 Power Plants Nationwide | |
Ranked #555 out of 5,643 Solar Power Plants Nationwide | |
Ranked #173 out of 279 Florida Power Plants | |
Ranked #99 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Durrance
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Durrance.
Monthly Net Generation for Durrance
Durrance Details
Summary Information | |
---|---|
Plant Name | Durrance (63495) |
Plant Address | 7180 FL-37, Mulberry, FL 33860 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.78, -81.98 |
Generation Dates on File | Jan 2021 to Aug 2024 |
Initial Operation Date | January 2021 |
Annual Generation | 109.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 240 |
Tilt Angle | 10 |
DC Net Capacity | 70.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Durrance Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#545 | Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh |
#546 | SR Turkey Creek, LLC | Lancaster, KY | 113.0 GWh |
#547 | Silver State Solar Power North | Primm, NV | 112.8 GWh |
#548 | Southampton Solar, LLC | Newsoms, VA | 111.6 GWh |
#549 | Pineapple | Port St Lucie, FL | 111.5 GWh |
#550 | Sandstone Solar | Florence, AZ | 111.1 GWh |
#551 | Lick Creek Solar, LLC | Walnut Cove, NC | 110.4 GWh |
#552 | Pavant Solar, LLC | Fillmore, UT | 110.1 GWh |
#553 | Sugar Solar, LLC | Yadkinville, NC | 109.9 GWh |
#554 | Luning Energy | Luning, NV | 109.2 GWh |
#556 | Mule Creek Renewable Energy Center | Panama City, FL | 109.0 GWh |
#557 | Bedford Solar | Chesapeake, VA | 108.4 GWh |
#558 | Oak Solar | Gaston, NC | 108.3 GWh |
#559 | Kellam Solar | Ben Wheeler, TX | 107.7 GWh |
#560 | Adams Solar LLC PA | Gettysburg, PA | 106.8 GWh |
#561 | Riverside Solar | Ruskin, FL | 106.4 GWh |
#562 | Canoe | Holt, FL | 106.4 GWh |
#563 | Turquoise Nevada, LLC | Sparks, NV | 106.3 GWh |
#564 | Desper Solar | Louisa, VA | 106.3 GWh |
#565 | Bladen Solar | Fayetteville, NC | 104.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Durrance.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 96.6 GWh | 4.8 mi |
Bonnie Mine Solar | Bartow, FL | 56.2 GWh | 7.6 mi |
Fort Green Solar Power Plant | Bowling Green, FL | 158.1 GWh | 9.9 mi |
Grange Hall Solar | Wimauma, FL | 103.3 GWh | 13.2 mi |
Hardee Power Station | Bowling Green, FL | 895.2 GWh | 10 mi |
Hines Energy Complex | Bartow, FL | 11.3 TWh | 6.7 mi |
Jamison Solar (FL) | Mulberry, FL | 140.3 GWh | 2.4 mi |
Lake Hancock Solar | Bartow, FL | 90.8 GWh | 5.3 mi |
Laurel Oaks Solar | Plant City, FL | 118.3 GWh | 11.5 mi |
Lithia Solar | Lithia, FL | 124.5 GWh | 11.4 mi |
Magnolia Solar | Mulberry, FL | 136.5 GWh | 10.4 mi |
Midulla Generating Station | Bowling Green, FL | 2.0 TWh | 9.6 mi |
Mosaic Co Bartow Facility | Bartow, FL | 122.0 GWh | 9.6 mi |
Mosaic New Wales Operations | Mulberry, FL | 413.0 GWh | 5.7 mi |
Mosaic South Pierce Operations | Mulberry, FL | 142.2 GWh | 2.7 mi |
Mulberry Cogeneration Facility | Bartow, FL | 399.7 GWh | 7.9 mi |
Orange Cogeneration Facility | Bartow, FL | 391.0 GWh | 11.4 mi |
Payne Creek Solar | Bowling Green, FL | 121.4 GWh | 8 mi |
Polk | Mulberry, FL | 5.5 TWh | 3.6 mi |
Tiger Bay | Ft. Meade, FL | 1.1 TWh | 8.3 mi |