Downtown is ranked #43 out of 64 distillate fuel oil power plants in Virginia in terms of total annual net electricity generation.
Downtown is comprised of 2 generators and generated 59.7 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Downtown |
---|---|
Utility Name | City of Franklin - (VA) |
Location | Southampton County, VA |
Initial Operation Date | November 1992 |
Last Update | Dec 2023 |
Annual Generation | 232.0 MWh |
Annual Consumption | 2.8 k MMBtu |
Ranked #11,252 out of 11,835 Power Plants Nationwide | |
Ranked #630 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #192 out of 211 Virginia Power Plants | |
Ranked #43 out of 64 Virginia Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Downtown
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Downtown.
Monthly Net Generation for Downtown
Downtown Details
Summary Information | |
---|---|
Plant Name | Downtown (55954) |
Plant Address | 404 Mechanic Street, Franklin, VA 23851 |
Utility | City of Franklin - (VA) (6715) |
Latitude, Longitude | 36.68028, -76.92194 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | November 1992 |
Annual Generation | 232.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Franklin - (VA) (6715) VA |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 1 Details Operating November 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1992 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating November 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1992 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Downtown Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#620 | Eastern Correctional Institute | Westover, MD | 5.7 GWh |
#621 | Bucksport Generation LLC | Bucksport, ME | 21.0 GWh |
#622 | Unionville | Unionville, MO | 240.0 MWh |
#623 | Ascutney | Weatherfield, VT | 239.0 MWh |
#624 | Bryan Peaking | Bryan, OH | 237.0 MWh |
#625 | Rock Lake CT | Pine City, MN | 235.0 MWh |
#626 | Central Utility Plant Cincinnati | Cincinnati, OH | 241.0 GWh |
#627 | Pratt & Whitney | East Hartford, CT | 129.1 GWh |
#628 | Pittsfield Generating LP | Pittsfield, MA | 33.7 GWh |
#629 | Alliant SBD 9106 Rockwell CR | Cedar Rapids, IA | 232.3 MWh |
#631 | Pretlow | Franklin, VA | 231.0 MWh |
#632 | Freeburg | Freeburg, IL | 230.0 MWh |
#633 | Savannah River Site Biomass Cogen | Aiken, SC | 70.5 GWh |
#634 | Merrimack | Bow, NH | 151.0 GWh |
#635 | Story City | Story City, IA | 233.0 MWh |
#636 | Mid-Georgia Cogeneration Facility | Kathleen, GA | 123.4 GWh |
#637 | Christiana | Wilmington, DE | 219.0 MWh |
#638 | Pleasant Hill | Pleasant Hill, IA | 16.8 GWh |
#639 | North Ninth Street | Rochelle, IL | 1.9 GWh |
#640 | Sullivan (IL) | Sullivan, IL | 214.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Downtown.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Benthall Bridge PV 1 | Murfreesboro, NC | 7.9 GWh | 20.5 mi |
Downs Farm Solar | Cofield, NC | 8.3 GWh | 22 mi |
Gates Solar LLC | Eure, NC | 9.0 GWh | 17.2 mi |
HWY 158 PV | Murfreesboro, NC | 18.4 GWh | 19.7 mi |
International Paper Franklin Mill | Franklin, VA | 254.3 GWh | 0.5 mi |
Nottoway Diesel Generating Facility | Courtland, VA | 525.0 MWh | 10.2 mi |
Phelps 158 Solar Farm | Conway, NC | 9.8 GWh | 21.1 mi |
Pleasant Hill Solar | Suffolk, VA | 20.7 GWh | 19 mi |
Pretlow | Franklin, VA | 231.0 MWh | 1.5 mi |
Solar Star North Carolina II LLC | Murfreesboro, NC | 8.7 GWh | 19.3 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 18.6 mi |
Southampton Power Station | Franklin, VA | 340.0 GWh | 4.5 mi |
Southampton Solar, LLC | Newsoms, VA | 111.6 GWh | 14.3 mi |
Stratford Solar Center, LLC | Suffolk, VA | 31.0 GWh | 20.1 mi |
Turkey Creek PV1 | Kirby, NC | 20.0 GWh | 20.3 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh | 15.9 mi |
Underwood PV2 | Murfreesboro, NC | 27.9 GWh | 19.4 mi |
Vaughn Creek PV1 | Murfreesboro, NC | 33.4 GWh | 19.3 mi |
Winton Solar | Winton, NC | 9.0 GWh | 21.1 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 22.5 mi |