Dover Solar
1255 Sydney Washer Rd, Dover, FL 33527Plant Summary Information
Dover Solar is ranked #132 out of 172 solar farms in Florida in terms of total annual net electricity generation.
Dover Solar generated 9.1 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Dover Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Hillsborough County, FL |
Initial Operation Date | December 2023 |
Last Update | Oct 2024 |
Annual Generation | 47.4 GWh |
Annual Consumption | 161.6 k MMBtu |
Ranked #3,942 out of 11,866 Power Plants Nationwide | |
Ranked #818 out of 5,672 Solar Power Plants Nationwide | |
Ranked #212 out of 279 Florida Power Plants | |
Ranked #132 out of 172 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Dover Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dover Solar.
Monthly Net Generation for Dover Solar
Dover Solar Details
Summary Information | |
---|---|
Plant Name | Dover Solar (66129) |
Plant Address | 1255 Sydney Washer Rd, Dover, FL 33527 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.95587, -82.20138 |
Generation Dates on File | Dec 2023 to Oct 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 47.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 25 MW |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 32 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Dover Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#808 | Long Island Solar Farm LLC | Upton, NY | 48.1 GWh |
#809 | Red Horse III | Wilcox, AZ | 48.1 GWh |
#810 | Rio Bravo Solar II LLC | McKittrick, CA | 48.0 GWh |
#811 | RE Garland A | Rosamond, CA | 47.9 GWh |
#812 | Vega Solar | Los Banos, CA | 47.7 GWh |
#813 | CED Ducor 1 | Ducor, CA | 47.7 GWh |
#814 | NextEra Westside PV | Five Points, CA | 47.7 GWh |
#815 | Rawhide Prairie Solar Hybrid | Wellington, CO | 47.3 GWh |
#816 | Bayshore Solar A, LLC | Lancaster, CA | 47.4 GWh |
#817 | SR Odom | Moultrie, GA | 47.4 GWh |
#819 | Westmoreland County Solar Project | WARSAW, VA | 47.2 GWh |
#820 | CED Ducor 2 | Ducor, CA | 47.2 GWh |
#821 | Simcoe Solar | Mountain Home, ID | 46.9 GWh |
#822 | Antelope Expansion 1B | Lancaster, CA | 46.9 GWh |
#823 | CED Ducor 4 | Ducor, CA | 46.9 GWh |
#824 | Corcoran Solar 2 | Corcoran, CA | 46.8 GWh |
#825 | Gaston Solar Power Plant | Cherryville Township, NC | 46.8 GWh |
#826 | Atwell Island West Solar | Alpaugh, CA | 46.5 GWh |
#827 | Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh |
#828 | Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dover Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Balm Solar | Wimauma, FL | 127.0 GWh | 13.5 mi |
Big Bend | Apollo Beach, FL | 7.3 TWh | 16.6 mi |
Big Bend Agrivoltaics | Apollo Beach, FL | 1.5 GWh | 17.1 mi |
Big Bend Floating Solar I | Gibsonton, FL | 1.7 GWh | 16.6 mi |
Big Bend II Solar | Apollo Beach, FL | 81.2 GWh | 16.7 mi |
Bonnie Mine Solar | Bartow, FL | 55.8 GWh | 13.8 mi |
Goldfinch | Lakeland, FL | 2.2 GWh | 9.9 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 5.0 TWh | 13.9 mi |
Hillsborough County Resource Recovery | Tampa, FL | 177.2 GWh | 8.5 mi |
IKEA Tampa 042 | Tampa, FL | 1.4 GWh | 14.1 mi |
Juniper Solar (FL) | Zephyrhills, FL | 135.9 GWh | 15.8 mi |
Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.0 GWh | 9.7 mi |
Laurel Oaks Solar | Plant City, FL | 117.6 GWh | 8.4 mi |
Lithia Solar | Lithia, FL | 124.0 GWh | 14.2 mi |
LKL BLBD, LLC | Lakeland, FL | 8.1 GWh | 13.6 mi |
Magnolia Solar | Mulberry, FL | 134.6 GWh | 9.7 mi |
McKay Bay Facility | Tampa, FL | 68.6 GWh | 13.4 mi |
Mosaic Co Tampa Facility | Riverview, FL | 117.8 GWh | 13.3 mi |
Mosaic New Wales Operations | Mulberry, FL | 413.8 GWh | 12.4 mi |
Wimauma Solar | Wimauma, FL | 124.8 GWh | 16 mi |