Douglas Dam

850 Powerhouse Way, Dandridge, TN 37725

Plant Summary Information

Douglas Dam is ranked #22 out of 84 power plants in Tennessee in terms of total annual net electricity generation.

Douglas Dam is comprised of 4 generators and generated 74.1 GWh during the 3-month period between September 2023 to December 2023.

Plant NameDouglas Dam
Utility NameTennessee Valley Authority
LocationSevier County, TN
Initial Operation DateMarch 1943
Last Update Dec 2023
Annual Generation 364.9 GWh
Annual Consumption 1.4 M MMBtu
Ranked #1,624 out of 11,866 Power Plants Nationwide
Ranked #132 out of 1,369 Water Power Plants Nationwide
Ranked #22 out of 84 Tennessee Power Plants
Ranked #9 out of 28 Tennessee Water Power Plants
Fuel Types Water

Map of Douglas Dam

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Douglas Dam.

Create Your Account Today

Monthly Net Generation for Douglas Dam

Douglas Dam Details

Summary Information
Plant NameDouglas Dam (3400)
Plant Address850 Powerhouse Way, Dandridge, TN 37725
UtilityTennessee Valley Authority (18642)
Latitude, Longitude35.9623, -83.5393
Generation Dates on FileJan 2001 to Dec 2023
Initial Operation DateMarch 1943
Annual Generation 364.9 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityTennessee Valley Authority (TVA)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceFrench Broad River
Ash Impoundment
Transmission / Distribution OwnerTennessee Valley Authority (18642) TN
Grid Voltage 161.00 kV
Energy StorageNo

Generator 3 Details Operating March 1943

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity31.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity27.6 MW
Minimum Load14.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 1943
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 1 Details Operating January 1944

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity36.5 MW
Nameplate Power Factor0.9
Summer Capacity44.2 MW
Winter Capacity27 MW
Minimum Load14.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1944
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 2 Details Operating May 1949

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity41.4 MW
Nameplate Power Factor0.9
Summer Capacity44.7 MW
Winter Capacity27.5 MW
Minimum Load13 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 1949
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 4 Details Operating August 1954

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity41.4 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity29.1 MW
Minimum Load13 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 1954
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Douglas Dam Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#122TrinityWeaverville, CA386.3 GWh
#123Box CanyonIone, WA383.5 GWh
#124Parker DamParker, CA381.0 GWh
#125KeswickRedding, CA380.1 GWh
#126Hartwell LakeHartwell, GA378.9 GWh
#127C J StrikeBruneau, ID377.1 GWh
#128Smithland Hydroelectric PlantSmithland, KY374.5 GWh
#129Old HickoryHendersonville, TN368.7 GWh
#130Pit 5Big Bend, CA367.5 GWh
#131BeldenBelden, CA365.0 GWh
#133ThermalitoOroville, CA350.7 GWh
#134DonnellsNone, CA347.7 GWh
#135PeltonMadras, OR347.5 GWh
#136Pit 3Burney, CA345.4 GWh
#137Logan Martin DamVincent, AL343.5 GWh
#138GastonRoanoke Rapids, NC342.6 GWh
#139Dam 2Dumas, AR342.3 GWh
#140Spring CreekRedding, CA341.9 GWh
#141John H KerrBoydton, VA340.0 GWh
#142Caribou 2Belden, CA339.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Douglas Dam.

Plant NamePlant LocationAnnual GenerationDistance
Buffalo Mountain Energy CenterOliver Springs, TN16.2 GWh46.4 mi
Bull RunClinton, TN750.8 GWh34.8 mi
CalderwoodTallassee, TN521.6 GWh40.8 mi
CheoahTapoco, NC447.8 GWh42 mi
Cherokee DamRudledge, TN301.3 GWh14.4 mi
Chestnut Ridge Gas RecoveryHeiskell, TN22.3 GWh29.5 mi
ChilhoweeTallassee, TN146.9 GWh40.6 mi
Fontana DamFontana Dam, NC813.6 GWh38.4 mi
Fort LoudounLenoir City, TN676.5 GWh41.1 mi
Hot Springs Energy Storage & MicrogridHot Springs, NC1.9 GWh40.3 mi
John SevierRogersville, TN3.9 TWh43 mi
Melton HillLenoir City, TN91.5 GWh42.9 mi
NantahalaTopton, NC186.1 GWh48.3 mi
Norris DamNorris, TN294.8 GWh35.7 mi
Primient Loudon PlantLoudon, TN402.4 GWh46.4 mi
Queens CreekTopton, NC3.6 GWh48.4 mi
SanteetlahRobbinsville, NC161.4 GWh40 mi
SR Greenville IIGreeneville, TN10.2 GWh47.3 mi
University of Tennessee Steam PlantKnoxville, TN34.3 GWh21.7 mi
WaltersWaterville, NC321.0 GWh33.1 mi