Donaghy-Stockton
4747 Logistics Drive, Stockton, CA 95215Plant Summary Information
Donaghy-Stockton is ranked #604 out of 799 solar farms in California in terms of total annual net electricity generation.
Donaghy-Stockton generated 384.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Donaghy-Stockton |
---|---|
Utility Name | Donaghy Sales Inc. |
Location | San Joaquin County, CA |
Initial Operation Date | October 2021 |
Last Update | Dec 2023 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.2 k MMBtu |
Ranked #9,573 out of 11,852 Power Plants Nationwide | |
Ranked #4,332 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,333 out of 1,570 California Power Plants | |
Ranked #604 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Donaghy-Stockton
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Donaghy-Stockton.
Monthly Net Generation for Donaghy-Stockton
Donaghy-Stockton Details
Summary Information | |
---|---|
Plant Name | Donaghy-Stockton (65177) |
Plant Address | 4747 Logistics Drive, Stockton, CA 95215 |
Utility | Donaghy Sales Inc. (64538) |
Latitude, Longitude | 37.90952, -121.19489 |
Generation Dates on File | Oct 2021 to Dec 2023 |
Initial Operation Date | October 2021 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Warehousing and Storage (493) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator DSPV1 Details Operating October 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Summer Capacity | 1.1 MW |
Winter Capacity | 0.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 1.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.6 MW |
Virtual Net Metering Agreement | No |
Donaghy-Stockton Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4322 | Five H Farms Solar Array | Merced, CA | 2.3 GWh |
#4323 | Chester CSG | Chester, NY | 2.3 GWh |
#4324 | SolarClub 28 LLC | Gaylord, MN | 2.3 GWh |
#4325 | Hollins Ferry CSG | Halethorpe, MD | 2.3 GWh |
#4326 | Syncarpha Eagle Nest | Eagle Nest, NM | 2.3 GWh |
#4327 | USS Wildcat Solar LLC | Goodhue, MN | 2.3 GWh |
#4328 | Skidmore College | Saratoga Springs, NY | 2.3 GWh |
#4329 | Smith & Wesson at Springfield MA PV | Springfield, MA | 2.3 GWh |
#4330 | Ludlow Site 72 - Conti | Ludlow, MA | 2.3 GWh |
#4331 | Dodge Renewables 1 | Dodge Center, MN | 2.3 GWh |
#4333 | Westborough Solar LLC | Westborough, MA | 2.3 GWh |
#4334 | Sierra Nevada Brewing Co Hybrid | Chico, CA | 9.3 GWh |
#4335 | McKee City Solar Phase 2 | Egg Harbor Township, NJ | 2.3 GWh |
#4336 | Hubble Solar, LLC | Whiteville, NC | 2.3 GWh |
#4337 | General Electric Aircraft Engines | Lynn, MA | 2.3 GWh |
#4338 | Geranium Solar, LLC | Raymond, MN | 2.3 GWh |
#4339 | Gilead Oceanside Solar Project | Oceanside, CA | 2.3 GWh |
#4340 | Chatham Landfill | Chatham, MA | 2.3 GWh |
#4341 | Paynesville CSG1, LLC | Paynesville, MN | 2.3 GWh |
#4342 | Clay County Electrical Cooperative | Corning, AR | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Donaghy-Stockton.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AltaGas Ripon Energy Inc. | Ripon, CA | 1.7 GWh | 13 mi |
Amazon - Stockton - Roof (SCK1) - (CA) | Stockton, CA | 3.6 GWh | 0.3 mi |
Ameresco Forward | Manteca, CA | 32.1 GWh | 1.9 mi |
Ameresco San Joaquin | Linden, CA | 30.9 GWh | 16.7 mi |
Axium Modesto Solar | Modesto, CA | 53.7 GWh | 16.3 mi |
Bear Creek Solar | Lodi, CA | 3.9 GWh | 15.9 mi |
Combustion Turbine Project No 2 | Lodi, CA | 6.6 GWh | 16.2 mi |
Foothill Sanitary Landfill - Solar Array | Linden, CA | 8.2 GWh | 16.9 mi |
J.R. Simplot Company | Lathrop, CA | 8.9 GWh | 8.4 mi |
Kettleman Solar Project | Lodi, CA | 2.7 GWh | 14.9 mi |
Lodi | Lodi, CA | 546.0 MWh | 17.4 mi |
Lodi Energy Center | Lodi, CA | 829.1 GWh | 16.2 mi |
Manteca Land PV | Manteca, CA | 444.0 MWh | 4.9 mi |
Niagara Bottling Stockton | Stockton, CA | 1.7 GWh | 3.1 mi |
Regional Wastewater Control Facility | Stockton, CA | 4.1 GWh | 7.6 mi |
Ripon Generation Station | Ripon, CA | 9.7 GWh | 13 mi |
Robert O Schulz Solar Farm | Oakdale, CA | 1.7 GWh | 16.9 mi |
Stockton Biomass | Stockton, CA | 326.3 GWh | 7.8 mi |
University of the Pacific | Stockton, CA | 6.2 GWh | 8 mi |
Woodland | Modesto, CA | 299.7 GWh | 20.1 mi |